Material Insights · Understanding the Material World

Electrolysers: Levers

Held back most by

Economics

Machines are not scarce: the IEA puts electrolyser factory capacity at 58 GW a year in 2025, with average utilisation of less than 10%, against installed capacity just over 4 GW [13][4]. What is missing is orders at a price. At assumed rather than observed inputs the Economics row works out to about USD 5.9 a kg against the DOE's USD 2.00 target for 2026 [3]. Iridium and the Indian mission matter, but cost and finance would move this technology most.

The six layers

Mathematics, science, engineering, production, economics, and resources and rules: what each gives, the idea in plain words, the limit (hard or soft) and how close today is, what could unlock it, and the maths behind it

Six layers make a technology possible, from the mathematics underneath to the resources and rules it needs at world scale. A hard limit comes from mathematics or nature and can only be sidestepped; a soft limit moves with effort, scale, money or policy.

  1. 1 Mathematics Hard limit

    Mathematics is the language of its physics

    What it gives. Faraday's law ties the amount of hydrogen made to the electric charge passed, so a designer can say how much current a plant needs for each tonne [10].

    The idea. Role: language. A physical law does the work and mathematics writes it down. Each hydrogen molecule takes two electrons (2H⁺ + 2e⁻ → H₂) [10], so 1 kg of hydrogen needs 992 mol of electrons, or about 26,600 amp-hours (calculated).

    The limit. The charge needed for each kilogram of hydrogen is fixed by the reaction, whatever the design [10].

    What could unlock it. Design cannot cut the charge, only the voltage it is pushed at, which sets the energy [12].

    Show the maths Q = I × t, n = Q ÷ F
    Q
    the electric charge passed, in coulombs
    I
    the current, in amperes
    t
    the time the current flows, in seconds
    n
    the moles of electrons that moved
    F
    Faraday's constant, 96,485 coulombs for each mole of electrons

    In plain words. Electric current is a flow of charge. Every hydrogen molecule that bubbles off needs two electrons to arrive. So to make a given weight of hydrogen you must push a given amount of charge, however clever the machine is. The only choice left is how hard you push, which is the voltage.

    Worked example. 1 kg of hydrogen is 1,000 ÷ 2.016 = 496 mol (assumed molar mass 2.016 g/mol). Two electrons each makes 992 mol of electrons. Q = 992 × 96,485 = 95.7 million coulombs, and 95.7 million ÷ 3,600 = about 26,600 amp-hours (calculated) [10][11].

  2. 2 Science Hard limit

    What it gives. Splitting water takes a minimum voltage, and a higher one if the electricity must also supply the heat the reaction takes in [12].

    The idea. The reversible cell voltage is 1.23 V and the thermoneutral voltage is 1.48 V under standard conditions [12]. With the 26,600 amp-hours from the maths row, that is 32.7 kWh and 39.4 kWh of electricity for 1 kg of hydrogen (calculated). The US DOE puts a PEM stack at 51 kWh/kg in 2022 [3].

    The limit. 1.23 V is the minimum that must be applied to split water; the thermoneutral 1.48 V also covers the heat bound in the change in entropy [12].

    What could unlock it. The part between 1.23 V and 1.48 V is heat, so a cell given heat from outside can use less electricity (calculated from [12]); the DOE's ultimate stack target is 43 kWh/kg [3].

    Show the maths ΔG° = -n × F × E°
    ΔG°
    the free energy of the reaction, in joules for each mole; the minimum work
    n
    the moles of electrons moved for each mole of reaction, 2 for water
    F
    Faraday's constant, 96,485 coulombs for each mole of electrons
    E°
    the cell voltage, in volts

    In plain words. Splitting water is like pushing a ball uphill. The voltage is the height of the hill for each unit of charge. You cannot push the ball up with less than the climb needs. Extra push beyond the climb is wasted as heat.

    Worked example. At the reversible 1.23 V [12] with 2 electrons for each water molecule, the work for one mole of water is 2 × 96,485 × 1.23 = 237,353 J, about 237 kJ (calculated) [11]. For 1 kg of hydrogen, 26,600 amp-hours × 1.23 V = 32.7 kWh and × 1.48 V = 39.4 kWh (calculated). The DOE stack's 51 kWh/kg is 11.6 kWh above the thermoneutral figure (calculated); that part leaves as heat.

  3. 3 Engineering Soft limit

    What it gives. A stack of cells with a catalyst on each electrode, and a rectifier and gas handling around it: the DOE puts the 2022 PEM stack at 51 kWh/kg (65% of the hydrogen's lower heating value) and the whole system at 55 kWh/kg (61%) [3].

    The idea. The 2022 stack lasted 40,000 hours with a degradation rate of 4.8 mV per thousand hours [3]. Its extra voltage above the thermoneutral minimum is the engineering loss: 51 kWh/kg against 39.4 (calculated).

    The limit. Lifetime and degradation: 40,000 hours in 2022 against an 80,000 hour target for 2026 [3].

    What could unlock it. The DOE targets a stack at 48 kWh/kg and 100 USD per kW by 2026, and 43 kWh/kg and 50 USD per kW ultimately [3].

  4. 4 Production Soft limit

    What it gives. Factories exist for far more than is ordered: global electrolyser manufacturing capacity stood at 58 GW a year in 2025, with average utilisation of less than 10% [13].

    The idea. China hosts nearly 70% of global electrolyser manufacturing capacity [13]. Installed electrolysis capacity doubled in 2025 to surpass 4 GW [4]. In India, 15 firms had been awarded 3,000 MW a year of electrolyser manufacturing capacity by May 2025 [15].

    The limit. Production is not the limit today: the factories run at under 10% of capacity, so output waits for orders [13].

    What could unlock it. A record 4 GW deployed in 2025 [13] would use about 7% of the 58 GW a year of factory capacity (calculated); the IEA says manufacturing is entering a consolidation phase because the market is slow [4].

  5. 5 Economics Soft limit Binds most today

    What it gives. A kilogram of hydrogen is mostly the cost of electricity plus the electrolyser's capital cost spread over its running hours.

    The idea. The IEA estimates that Chinese electrolysers cost USD 500 to 1,100 per kW in 2025, against USD 1,900 to 2,500 per kW outside China [13]. The DOE puts PEM hydrogen at over USD 3 a kg in 2022 and targets USD 2.00 for 2026 and USD 1.00 ultimately [3].

    The limit. Capital charges and power: at 40% running hours (assumed) the capital alone adds about USD 3.7 a kg at USD 2,000 per kW and 10% finance (assumed), and power adds more (calculated) [16].

    What could unlock it. Chinese electrolysers at USD 500 to 1,100 per kW [13] would cut the capital part sharply: at an assumed USD 800 per kW it falls from USD 3.69 to USD 1.48 a kg (calculated).

    Show the maths CRF = WACC × [1 ÷ (1 - 1 ÷ (1 + WACC)t)], and cost per kg = capex per kW × CRF ÷ (8,760 × CF ÷ kWh per kg) + power price × kWh per kg
    CRF
    the capital recovery factor: the share of the up-front cost paid back each year
    WACC
    the weighted average cost of capital, as a fraction a year
    t
    the number of years the equipment earns
    capex per kW
    the up-front cost for each kilowatt of electrolyser, in US dollars
    CF
    the capacity factor: the share of the year the plant runs at full power
    8,760
    the hours in a year
    kWh per kg
    the electricity for each kilogram of hydrogen, 55 for the 2022 DOE system
    power price
    the price of electricity, in US dollars per kWh

    In plain words. Making hydrogen has two big costs. One is the machine, paid back over its life with interest. The other is the electricity it eats. If the machine sits idle much of the year, the machine cost is spread over fewer kilograms, so each kilogram costs more.

    Worked example. Assumed: capex USD 2,000/kW, WACC 10%, life 20 years, CF 40%, power USD 0.04/kWh, 55 kWh/kg [3]. CRF = 0.10 ÷ (1 - 1.10-20) = 0.1175. Capital per kW a year = 2,000 × 0.1175 = USD 235; kilograms per kW a year = 8,760 × 0.4 ÷ 55 = 63.7; so capital is 235 ÷ 63.7 = USD 3.69/kg. Power is 0.04 × 55 = USD 2.20/kg. Total about USD 5.9/kg before running costs (calculated). At an assumed USD 800/kW the capital falls to USD 1.48/kg and the total to USD 3.7/kg (calculated).

  6. 6 Resources and rules Soft limit

    What it gives. PEM electrolysers use iridium, a scarce metal: annual primary production is about 7.5 tonnes, with South Africa accounting for 90% to 95% of global output [14].

    The idea. State-of-the-art PEM needs about 750 kg of iridium for each GW, and the IEA's net zero pathway would need at least a threefold cut, to 250 kg per GW; the paper warns that supply shortages could arise as early as 2030 [14]. Separately, India targets 5 million tonnes of green hydrogen a year by 2030, and 19 companies had been allocated annual production capacity of 862,000 tonnes by May 2025 [15].

    The limit. Scarce minerals: iridium supply for PEM electrolysers [14].

    What could unlock it. Cutting iridium per GW, from 750 to 250 kg, which the IEA pathway assumes [14].

    Show the maths material needed = capacity built × material per unit of capacity
    material needed
    the iridium needed, in kilograms
    capacity built
    the electrolyser capacity built, in gigawatts
    material per unit of capacity
    the iridium in each gigawatt, 750 kg in state-of-the-art PEM

    In plain words. If every gigawatt of electrolyser needs a fixed weight of a rare metal, then building more gigawatts uses more of the metal. When the world only digs up a little each year, the metal limits how fast you can build.

    Worked example. 1 GW at 750 kg per GW needs 750 kg of iridium, a tenth of the 7.5 tonnes mined in a year (calculated) [14]. Ten GW a year would need all of it.

as of 2026-11-23

Sources

  1. Technical Targets for Proton Exchange Membrane Electrolysis US Department of Energy, Hydrogen and Fuel Cell Technologies Office, 2023
  2. Global Hydrogen Review 2026: Production International Energy Agency, 2026
  3. Electrolysis (Chemistry 2e, section 17.7) OpenStax, 2019
  4. Potential, Free Energy, and Equilibrium (Chemistry 2e, section 17.4, undated) OpenStax, 2026
  5. Efficiency of electrolyzers (technical paper, copyright 2025) Siemens Energy, 2025
  6. What explains the cost advantage of Chinese electrolysers? (commentary) International Energy Agency, 2026
  7. Critical Iridium Demands arising from future Expansion of Proton Exchange Membrane Electrolysis (Wortmann, Stolten, Heinrichs), preprint arXiv 2509.05357, 2025
  8. Unlocking India's Green Hydrogen Production Potential Press Information Bureau, Government of India, 2025
  9. Equations and Variables in the ATB (2024) NREL, 2024