Fusion reactors: Resources and labour
Superconducting magnets, beryllium armour and a few grams of fuel
A fusion plant is a large, metal-intensive machine: superconducting magnets, beryllium or tungsten armour, steel structure and a lithium blanket. Fuel mass is tiny.
Natural resources
| Resource | How much | Why it is needed |
|---|---|---|
| Superconducting wire and tape | ITER: 100,000 km of niobium-tin strand (over 400 tonnes). SPARC: about 10,000 km of high-temperature superconducting tape.1214 | Only superconductors carry the currents for confining fields (20 tesla in the SPARC test magnet) without resistive losses that would consume the plant's output. |
| Beryllium, copper alloy and stainless steel (first wall) | 440 panels of about 1 x 1.5 m with 6-10 mm of beryllium tiles, rated for 2 to 4.7 MW/m2 of heat13 | Light beryllium atoms knocked off the wall cool the plasma less; copper conducts the heat to the coolant. |
| Steel and structural metal | ITER machine about 23,000 tonnes; vacuum vessel with ports, blanket and divertor 8,000 tonnes412 | The vessel holds a vacuum, resists forces from magnets storing up to 41 GJ, and shields the magnets from neutrons. |
| Land | ITER site 180 hectares, main platform 42 hectares12 | Tokamak building, tritium and cryogenic plants, power supplies and assembly halls. |
| Fuel (deuterium, tritium bred from lithium) | Less than 4 grams in the ITER vessel at any moment16 | Energy per kilogram is enormous, so fuel is a minor resource; lithium is covered on the Fusion fuels tile. |
Labour
| Phase | How much | Skills | Why it is needed |
|---|---|---|---|
| Construction (research machines) | About 5,000 people at ITER, up from about 1,400 in 201412 | Precision heavy engineering, welding, cryogenics, vacuum and nuclear-grade quality control | Components weighing hundreds of tonnes must be aligned to millimetres. |
| Manufacturing and supply chain | About 4,600 direct staff at private fusion firms and an estimated 9,300 supply-chain jobs; over 18,000 projected to build pilot plants15 | Superconductors, lasers and optics, power electronics, remote handling | Most hardware is first-of-a-kind and made to order. |
| Operation (experiments) | Over 300 scientists and engineers in JET's final deuterium-tritium campaign6 | Plasma physics, diagnostics, control, tritium handling | Each pulse is an experiment needing analysis and machine protection. |
| Jobs per MW | No estimate exists, because no plant generates electricity15 | Not applicable | Workforce intensity can only be judged once commercial plants are built. |
Neutron damage means wall components must be replaced periodically, adding to material throughput over a plant's life.
Sources
- Baseline press conference summary, July 2024 ITER Organization, 2024
- JET's final tritium experiments yield new fusion energy record UK Government (DESNZ / UKAEA), 2024
- Facts and figures ITER Organization, 2025
- Blanket first wall ITER Organization, 2025
- This Fusion Reactor Is Held Together With Tape IEEE Spectrum, 2024
- The global fusion industry in 2025 Fusion Industry Association, 2025
- Safety and the environment ITER Organization, 2025