Geothermal power plants: Resources and labour
Wells, steel and drilling crews borrowed from oil and gas
The main inputs are drilling (steel casing, cement, diesel), a modest land area and cooling water. Labour peaks during drilling and construction.
Natural resources
| Resource | How much | Why it is needed |
|---|---|---|
| Wells | About 21 wells (15 production, 6 injection) for a 50 MW flash plant; 4 for a 10 MW binary plant8 | Each well delivers a limited flow of hot fluid; spent fluid must be reinjected to sustain pressure. |
| Steel and cement (surface pipelines) | 769 t steel and 769 t cement for 50 MW flash, about 15 t each per MW (calculated)8 | Insulated pipes carry fluid between wells and plant; wells are lined with steel casing cemented in place. |
| Diesel | About 145,000 gallons for pipeline construction, 50 MW flash8 | Drilling rigs and construction equipment. |
| Land | About 404 m2 per GWh over 30 years, against 3,632 m2 for coal9 | Well pads, pipelines and plant; directional drilling shares pads. |
| Fresh water | About 5 gallons (19 litres) per MWh; air-cooled binary none. The Geysers: 1,400 gallons per MWh consumed89 | Evaporative cooling and reservoir top-up. |
Labour
| Phase | How much | Skills | Why it is needed |
|---|---|---|---|
| Exploration and drilling | 11-22 people exploring and 91-116 drilling for a 50 MW plant10 | Geologists, geophysicists, drilling engineers, rig hands, mud loggers | Finding and proving the reservoir is the riskiest, most labour-heavy step. |
| Manufacturing | 3.3-3.9 person-years per MW10 | Turbine, heat-exchanger and pipe manufacture | Plant equipment is custom-matched to the fluid. |
| Construction | 3.1-6.8 person-years per MW10 | Welders, steel erectors, concrete placers, project managers | Plants, pipelines and pads are built on site. |
| Operation | 0.36-0.7 jobs per MW10 | Plant operators, technicians, reservoir engineers | Plants run around the clock; wells need workovers. |
| All phases | 161,000 geothermal jobs worldwide in 202411 | Many transferable from oil and gas | Direct employment in geothermal power only. |
Sources
- Life-Cycle Analysis of Geothermal Technologies (Wang, Clark and Sullivan, Argonne National Laboratory, GTP peer review) US DOE, 2010
- A Guide to Geothermal Energy and the Environment Geothermal Energy Association, 2007
- GEOELEC Employment study, Deliverable 5.1 (Schütz et al.) GFZ Potsdam / APPA, 2013
- Renewable Energy and Jobs: Annual Review 2025, Table 1 IRENA and ILO, 2026