Economics

The physics is settled and the machines are efficient: the DOE's 2022 study uses 83.4% round trip at 100 MW [13]. What holds gravity back is cost against rivals: at 1,000 MW for 10 hours the same study puts it at USD 0.13 a kWh against 0.11 for pumped hydro and 0.10 for compressed air [13], and India's storage plan to 2031-32 counts only pumped hydro and batteries [16].

The six layers

Mathematics, science, engineering, production, economics, and resources and rules: what each gives, the idea in plain words, the limit (hard or soft) and how close today is, what could unlock it, and the maths behind it

Six layers make a technology possible, from the mathematics underneath to the resources and rules it needs at world scale. A hard limit comes from mathematics or nature and can only be sidestepped; a soft limit moves with effort, scale, money or policy.

  1. 1 Mathematics Hard limit

    Mathematics is the language of its physics

    What it gives. The bookkeeping that says how much of the energy put in comes back out.

    The idea. A physical law makes the store work and mathematics writes it down, so the role is language. Round-trip efficiency is the net work out during discharge divided by the net work in during charge [12]; the DOE's 2022 study uses an average of 83.4% for a 100 MW gravity plant [13].

    The limit. No store can return more than was put in; in our judgement the gap to 100% is set only by friction and electrical losses, since a raised weight does not leak.

    What could unlock it. Nothing to unlock in the mathematics; the gains lie in the motors and gears.

    Show the maths ηrt = Wout ÷ Win
    ηrt
    the round-trip efficiency, the share of energy that comes back
    Wout
    the net electrical work out while the weights come down, in kilowatt-hours
    Win
    the net electrical work in while the weights go up, in kilowatt-hours

    In plain words. Put some electricity in to lift the weights. Take some out as they come down. Divide what came out by what went in. That share is the round-trip efficiency.

    Worked example. Put in 100 MWh (assumed) at the DOE's 83.4% [13]: 100 × 0.834 = 83.4 MWh comes back (calculated).

  2. 2 Science Hard limit

    What it gives. A way to store energy as height: lift a heavy mass when power is cheap and lower it through a generator when power is dear.

    The idea. The energy gained by lifting a mass is its weight times the height, for any path between the two points [11]. Gravity is weak, so a 35 tonne block (assumed) lowered 100 m holds only about 9.5 kWh (calculated). A review gives solid gravity stores 0.1 to 0.5 Wh/kg against 0.5 to 1.5 Wh/kg for pumped hydro [3].

    The limit. The energy held is fixed by mass times gravity times height; energy cannot be created, so only more mass or more height stores more.

    What could unlock it. Height cannot be cheated, only found: deep mine shafts give a long drop without a tall building, though the review says scale is limited by shaft depth [3].

    PHS Pumped hydro storage

    Show the maths ΔPEg = m g h
    ΔPEg
    the energy gained by the mass as it is lifted, in joules
    m
    the mass lifted, in kilograms
    g
    the pull of gravity, about 9.80 metres a second squared
    h
    the height it is lifted, in metres

    In plain words. Lift something heavy and you store energy in it. Twice the weight or twice the height stores twice the energy. Let it fall and the energy comes back.

    Worked example. A 35,000 kg block (assumed) lifted 100 m: 35,000 × 9.80 × 100 = 34.3 MJ, or 9.5 kWh (calculated) [11]. To fill a 100 MWh store like Rudong [14] takes about 10,500 such block-drops (calculated).

  3. 3 Engineering Soft limit

    What it gives. Motors that lift, cranes or winches that move the weights, and the same machines run as generators on the way down.

    The idea. The DOE study uses an average efficiency of 83.4% at 100 MW and 84.4% at 1,000 MW [13]. Energy Vault projects more than 80% for its Rudong building, a company figure [14]. A review reports 85% for a 1 MWh shaft pilot and 70 to 75% for weights moved on inclined rail tracks [3].

    The limit. Losses in motors, gears and power electronics; no large plant has published measured operating figures, so the claims are projections [14].

    What could unlock it. Better drives and fewer moving parts per block; the review names efficiency optimisation as an open challenge [3].

  4. 4 Production Soft limit

    What it gives. Plants of many identical blocks, built on site like a large building.

    The idea. Energy Vault's Rudong plant, 25 MW and 100 MWh, supports a wind farm and the national grid in China [14]. The review notes that the substantial infrastructure costs need economies of scale to bring unit costs down [3].

    The limit. Each plant is a large civil structure for a modest amount of energy, so cost falls only with many repeat builds, which have not yet happened.

    What could unlock it. Reusing old mine shafts avoids building height, though abandoned mines carry collapse risks that need extra reinforcement [3].

  5. 5 Economics Soft limit Binds most today

    What it gives. A price for each kilowatt-hour delivered that beats pumped hydro, compressed air and batteries.

    The idea. At 1,000 MW and 10 hours, the DOE puts gravity at USD 0.13 a kWh, behind compressed air at 0.10 and pumped hydro at 0.11 [13]. PNNL says its gravity costs represent 2021 values [4], so they rest on early estimates.

    The limit. Cost against older rivals: on the DOE's numbers gravity is still dearer than pumped hydro and compressed air at long durations [13].

    What could unlock it. Repeat builds and cheaper blocks; no measured cost from a commercial plant was found.

    Show the maths CRF = i(1 + i)n ÷ [(1 + i)n − 1]
    CRF
    the capital recovery factor, the share of the price paid back each year
    i
    the interest rate, as a fraction
    n
    the number of years of equal payments

    In plain words. If you borrow to build a store, you repay it in equal parts each year. This number says what share of the price you pay each year. The more often the store is filled and emptied, the thinner that charge is spread.

    Worked example. At i = 0.10 and n = 30 (both assumed), (1.10)30 = 17.45, so CRF = 0.10 × 17.45 ÷ 16.45 = 0.106 (calculated) [15]. On the DOE's average installed cost of USD 446 a kWh for a 100 MW, 10 hour gravity plant [13] that is USD 47.3 a year, or about USD 0.16 for each kWh of capacity cycled 300 times a year (300 assumed, calculated).

  6. 6 Resources and rules Soft limit

    What it gives. Land, permits and a place in national storage plans.

    The idea. India's plan needs 73.93 GW of storage by 2031-32, all of it pumped hydro (26.69 GW) and batteries (47.24 GW) [16]. Trade press reported in 2019 that MNRE invited preliminary proposals for gravity storage; no MNRE notice was found [17]. An Australian developer signed an agreement with IIT-ISM Dhanbad in 2025 to study legacy mining sites, also from trade press [18].

    The limit. No slot in national plans and no track record; the weights themselves are ordinary concrete or soil, so materials do not bind.

    What could unlock it. Mine sites with existing shafts and grid links could host pilots; the 2025 agreement is to explore exactly that [18].

as of 2026-11-24

Sources

  1. A Review of Gravity Energy Storage Energies 18(7), 1812 (R. Wang, L. Zhang, C. Shi and C. Zhao), MDPI, doi:10.3390/en18071812, 2025
  2. Energy Storage Cost and Performance Database: Gravitational Energy Storage Pacific Northwest National Laboratory, 2024
  3. Gravitational Potential Energy (College Physics 2e, section 7.3, undated) OpenStax, 2026
  4. Integrated Heat Pump Thermal Storage and Power Cycle for CSP: Final Technical Report (NREL/TP-5700-79806, McTigue et al.) National Renewable Energy Laboratory, 2022
  5. 2022 Grid Energy Storage Technology Cost and Performance Assessment US Department of Energy / Pacific Northwest National Laboratory, 2022
  6. Rudong, China Gravity Energy Storage System (project page, undated; company figures) Energy Vault, 2026
  7. Simple levelized cost of energy (LCOE) calculator documentation National Laboratory of the Rockies (formerly NREL), US Department of Energy, 2026
  8. Central Electricity Authority notifies the National Electricity Plan for the period of 2022-32 Press Information Bureau, Ministry of Power, 2023
  9. India invites proposals for gravity-based energy storage projects (trade press) Energy-Storage.news, 2019
  10. Green Gravity signs MoU with IIT-ISM Dhanbad for energy storage collaboration (trade press) Machinist, 2025