Material Insights · Understanding the Material World

AC transmission: Levers

Held back most by

Resources and rules

The technology is mature and India completed 12,139 circuit km of lines in FY 2025-26, 5,111 of them at 765 kV [14]. What slows it is permission and delivery: land acquisition remains one of the most significant challenges [16], and procurement takes up to four years for large power transformers [15].

The six layers

Mathematics, science, engineering, production, economics, and resources and rules: what each gives, the idea in plain words, the limit (hard or soft) and how close today is, what could unlock it, and the maths behind it

Six layers make a technology possible, from the mathematics underneath to the resources and rules it needs at world scale. A hard limit comes from mathematics or nature and can only be sidestepped; a soft limit moves with effort, scale, money or policy.

  1. 1 Mathematics Hard limit

    Mathematics is the language of its physics

    What it gives. The law of induction lets a designer size a transformer, the device that makes high-voltage AC possible [12].

    The idea. A physical effect does the work and mathematics only describes it, so the role is language. A changing current in one coil makes a voltage in a second coil, in proportion to a number M that depends only on how the coils are placed [12].

    The limit. The voltage appears only while the current is changing, so a transformer will not work on steady direct current [12].

    What could unlock it. Direct current needs power electronics instead of a transformer, which is the route taken by HVDC links [12].

    HVDC HVDC links

    Show the maths ε2 = -M × dI1/dt
    ε2
    the voltage made in the second coil, in volts
    M
    the mutual inductance: how strongly the two coils are linked, in henries
    I1
    the current in the first coil, in amps
    t
    time, in seconds

    In plain words. If you change the current in one coil, you get a voltage in a nearby coil. The faster the change, the bigger the voltage. A steady current gives none. That is why the grid uses alternating current, which is always changing.

    Worked example. Assume a mutual inductance of 0.5 H and a current rising at 1,000 A each second (both assumed). The voltage made is 0.5 × 1,000 = 500 V in size (calculated) [12]. The sign in the equation only says that it opposes the change.

  2. 2 Science Hard limit

    What it gives. The power an AC line can carry between its two ends is limited by the line's reactance, whatever the wires are made of [13].

    The idea. The page gives the largest power that can be sent over a line as the product of the two end voltages divided by the reactance [13]. Doubling a line's length roughly doubles its reactance (assumed), so it halves that limit for the same voltages.

    The limit. Stability limit: the maximum power over a line is V₁V₂ ÷ X, so a long, high-reactance line cannot carry as much as a short one [13].

    What could unlock it. Raising the voltage raises the limit with the square of the voltage; adding parallel lines lowers X; or the line is changed to direct current [13].

    HVDC HVDC linksDist Distribution grids, mini-grids and interconnectors

    Show the maths Pmax = V1 × V2 ÷ X
    Pmax
    the most power the line can carry, in watts
    V1
    the voltage at the sending end, in volts
    V2
    the voltage at the receiving end, in volts
    X
    the total reactance of the line and the generator, in ohms

    In plain words. Think of a line as a pipe whose width depends on the voltage at its two ends. The longer the line, the narrower the pipe. Raise the voltage and the pipe widens, and fast, because voltage appears twice in the sum.

    Worked example. The formula is the source's [13], which does not say whether the voltage is a phase or a line voltage; here it is used as a three-phase total with line voltages (assumed). Take both ends at 400 kV and X = 100 Ω (assumed). Pmax = 400,000 × 400,000 ÷ 100 = 1,600 MW. Double the length so X = 200 Ω and the limit is 800 MW (calculated). At 765 kV, X = 100 Ω gives 5,852 MW (calculated).

  3. 3 Engineering Soft limit

    What it gives. India builds AC lines at 220 kV, 400 kV and 765 kV, and in the year to 31 March 2026 completed 12,139 circuit km in all, of which 5,111 were at 765 kV [14].

    The idea. The year's additions were 3,918 circuit km at 220 kV, 3,064 at 400 kV and 46 at 230 kV, so the 765 kV class was the largest single addition [14] (calculated from the same table).

    The limit. Each line carries only what its reactance and stability margin allow [13], so more power needs a higher voltage, more parallel lines or a switch to DC [13].

    What could unlock it. Higher-voltage lines and monopole towers, which the trade press says cut the right of way needed [16], are engineering routes.

    HVDC HVDC links

  4. 4 Production Soft limit

    What it gives. AC transmission needs power transformers, conductors, towers and substations, all made to order [15].

    The idea. The IEA says procurement now takes up to four years for large power transformers, and that power transformer prices have risen by around 75% in real terms since 2019 [15].

    The limit. The lead time of large transformers, made by a few firms, limits how fast new AC lines can be energised [15].

    What could unlock it. Early orders for the standard 400 kV and 765 kV transformer sizes, and local factories, shorten the wait [15].

  5. 5 Economics Soft limit

    What it gives. AC transmission in India is regulated: new projects earn a base return on equity of 15.00% from April 2024, with a useful life of 35 years for a line [17].

    The idea. Tariff regulation gives a steady return, so the cost of the line, spread over its life, is the main term in the charge per unit [17][18].

    The limit. Cost of capital and utilisation: the line is paid for up front, so a line that sits part empty, or a high interest rate, raises the charge on each unit it carries [18].

    What could unlock it. Competitive bidding and a high load factor lower the charge; delay increases the cost of capital during construction [18].

    Show the maths CRF = i × (1 + i)n ÷ ((1 + i)n - 1)
    CRF
    the capital recovery factor: the share of the up-front cost paid each year
    i
    the yearly cost of capital, as a fraction
    n
    the number of years the line earns

    In plain words. A line is paid for at the start and then earns for decades. This number tells you what share of the starting bill must be recovered each year. A higher interest rate makes it bigger.

    Worked example. The formula is the source's [18] and n = 35 years is the regulation's life for a transmission line [17]. Assume a cost of capital of 10% or 12% (assumed). At 10%, CRF = 0.1037, or Rs 10.37 crore a year for each Rs 100 crore spent; at 12%, CRF = 0.1223, or Rs 12.23 crore, which is 18% more (calculated).

  6. 6 Resources and rules Soft limit Binds most today

    What it gives. A line needs a continuous strip of land and clearances before any wire is hung [16].

    The idea. The IEA says permitting remains the primary cause of delays in transmission projects, particularly in advanced economies, and that spending on grids would need to exceed USD 200 billion a year by the mid-2030s under today's policy settings [6]. In India, land acquisition remains one of the most significant challenges, and this often leads to delays due to compensation disputes and right of way constraints [16].

    The limit. Land acquisition and right of way: the line cannot be started until the corridor is secure [16].

    What could unlock it. Monopoles are being used to address right of way challenges and accelerate project execution [16].

as of 2026-11-23

Sources

  1. Building the Future Transmission Grid: executive summary IEA, 2025
  2. 14.1 Mutual Inductance (University Physics Volume 2) OpenStax, 2026
  3. Chapter 9: Transient Stability (undated) NPTEL, Indian Institutes of Technology, 2026
  4. Transmission Lines Completed During FY 2025-26 (as on 31 March 2026) Central Electricity Authority, 2026
  5. Rising component prices and supply chain pressures are hindering the development of transmission grid infrastructure IEA, 2025
  6. Modernising the Grid: Technology trends shaping the transmission segment Power Line, 2025
  7. CERC (Terms and Conditions of Tariff) Regulations, 2024 Central Electricity Regulatory Commission, 2024
  8. Simple levelized cost of energy (LCOE) calculator documentation National Laboratory of the Rockies (formerly NREL), US Department of Energy, 2026