Solar photovoltaics: Levers
Held back most by
Resources and rules
The best silicon cells are near silicon's ceiling and modules are cheap, but India curtailed about 2.3 TWh of solar between late May and December 2025, in a year it added 38 GW [15], and lost another 300 GWh of renewable power to transmission limits in the first quarter of 2026 [16]. Grid, storage and flexible demand, not panels, now set how much solar can be used.
The six layers
Mathematics, science, engineering, production, economics, and resources and rules: what each gives, the idea in plain words, the limit (hard or soft) and how close today is, what could unlock it, and the maths behind it
Six layers make a technology possible, from the mathematics underneath to the resources and rules it needs at world scale. A hard limit comes from mathematics or nature and can only be sidestepped; a soft limit moves with effort, scale, money or policy.
- 1 Mathematics Hard limit
Mathematics is the language of its physics
What it gives. The diode equation, written in mathematics, tells a designer how much current and voltage a junction gives for a given light and leakage. It is the language in which every cell is designed and tested [10].
The idea. A physical law makes a solar cell work and mathematics only describes it, so the role is language. The open-circuit voltage grows with the logarithm of the ratio of light-made current to leakage current [10][19]. At room temperature, ten times more light adds only about 60 millivolts (calculated) [19].
The limit. Voltage rises only as a logarithm of light, so no amount of extra sunlight lifts a single junction's voltage far [10].
What could unlock it. Stacking two junctions of different band gap adds their voltages, a design that sidesteps the one-junction assumption; perovskite on silicon has reached 35.2% in the laboratory [3].
Show the maths
Voc = (k × T ÷ q) × ln(IL ÷ I0 + 1)- Voc
- the voltage of the cell with nothing connected, in volts
- k
- Boltzmann's constant, 1.380649 × 10-23 joules per kelvin
- T
- the temperature of the cell, in kelvin
- q
- the charge of one electron, 1.602 × 10-19 coulombs
- IL
- the current the light makes, in amps
- I0
- the small leakage current of the cell in the dark, in amps
In plain words. A solar cell is a one-way gate for electrons. Light pushes electrons through it. The dark leakage pushes some back. The voltage you get depends on how big the light push is compared with the leak. But it depends on the logarithm of that ratio, so doubling the light gives only a small extra voltage.
Worked example. At 300 K, k × T ÷ q = 25.85 millivolts (calculated; the source uses 0.0258 V) [19]. Taking, as an assumption, a light current 1010 times the leakage, Voc = 25.85 mV × ln(1010) = about 0.595 V; ten times more light adds 25.85 mV × ln 10 = about 60 mV (calculated) [10][19].
- 2 Science Hard limit
What it gives. The photovoltaic effect lets light make a current in a junction of two semiconductors, with no moving parts [7].
The idea. A photon frees an electron only if it carries more energy than the band gap, and any extra energy is lost as heat. Light is a mix of weak and strong photons, so a single junction cannot use it all. For the best band gap, 1.34 eV, the ceiling is 33.7%; for silicon, 29.4% [7].
The limit. Shockley-Queisser limit: one junction in sunlight cannot turn more than 33.7% of the light into electricity, and silicon not more than 29.4% [7].
Sunlight turned into electricity by a silicon cell
Today (2025): 28.1% · Limit: 29.4% · 96% of the way to the limit
Today is the best laboratory silicon cell, 28.1% (Fraunhofer ISE report, July 2026) [3], against silicon's calculated limit of 29.4% [7]; the typical new silicon module was 22.7% in Q4 2024 [3].
What could unlock it. Stacking absorbers of different band gap escapes the one-junction limit: the record laboratory perovskite-silicon tandem is 35.2% [3].
Show the maths
η = Pmax ÷ Pin- η
- the share of the sunlight's power turned into electricity, as a fraction
- Pmax
- the most electrical power the cell can give, in watts
- Pin
- the sunlight's power falling on the cell, in watts (1,000 watts on each square metre in the standard test)
In plain words. Efficiency is just what you get divided by what you put in. The sun's power is the input. The physics of the band gap fixes how big the output can ever be. For silicon, the best it can do is a little under 30 parts in 100.
Worked example. The best laboratory silicon cell, 28.1%, is 28.1 ÷ 29.4 = about 96% of silicon's limit (calculated) [7][3]. The average new module, 22.7%, is about 77% of it (calculated) [3].
- 3 Engineering Soft limit
What it gives. Cells are wired together and sealed under glass to make a module, and an inverter turns its direct current into the alternating current of the grid; each year brings small efficiency gains [3][11].
The idea. Cell designs such as TOPCon now reach 23.5% in modules, and back-contact versions 24.1%, up from 21.7% for the older PERC type [11]. Gains now come in fractions of a percentage point, because silicon is close to its limit. Silver for the contacts is a material limit: 706 GW of modules used about 7,244 tonnes in 2025 [11].
The limit. Heat, reflection, electrons lost in the crystal and silver cost cap what a real module can deliver, well under silicon's 29.4% [7][11].
What could unlock it. Using less silver per watt and moving to tandem cells would lift output per area; tandems are still at laboratory and pilot scale [3][11].
- 4 Production Soft limit
What it gives. About 700 GW of modules were made in 2025, and a module sold for about 0.10 US dollars a watt on average [3].
The idea. Price has followed a learning curve: the industry's learning rate is 26% for 1976 to 2025, so each doubling of cumulative volume cut price by about a quarter [11]. By June 2026 India had 233 GW a year of module capacity but only about 35 GW of cells and about 2 GW of ingots and wafers (calculated: 233 ÷ 116), so it imports the middle of the chain [12].
The limit. Yield, factory scale and the supply of cells and wafers set the cost; factories in India run at an estimated 35 to 40% of capacity [12].
What could unlock it. New cell plants under India's approved list of makers (ALMM List II) are expected to start closing the gap; wafer expansion is expected from 2028 and polysilicon only after 2030 [12].
Show the maths
C = C0 × (Q ÷ Q0)-b, learning rate = 1 - 2-b- C
- the cost or price per watt now
- C0
- the cost or price per watt at the start
- Q
- the total number of watts made so far
- Q0
- the total number of watts made at the start
- b
- how fast cost falls as volume grows, a pure number
In plain words. Every time the world doubles the number of panels it has ever made, factories learn and the price drops by a fixed share. For solar the share has been about a quarter. After three doublings the price is about 40% of what it was.
Worked example. At a 26% learning rate each doubling multiplies price by 0.74, so three doublings give 0.743 = 0.405, a fall of about 60% (calculated) [11][21].
- 5 Economics Soft limit
What it gives. Solar is the cheapest new power in much of the world: the global weighted average cost was 0.043 US dollars a kilowatt-hour in 2024, and India was around 0.038 [17].
The idea. Almost all the cost is paid up front, so the cost of money matters most. The IEA says the cost of capital can be 20 to 50% of the cost of solar electricity [13]. India's cost of capital for new projects was 8.8 to 10.0% in 2019 against 2.6 to 5.0% in Europe and the United States [13], and for utility-scale solar it is put at 10.3% in 2024 [14].
The limit. Cost of capital and buyer risk: distribution companies owing 6.84 trillion rupees leave lenders unsure of payment [14].
What could unlock it. Cutting the risk that buyers pay late lowers the rate; a 200 basis point change moves India's annual generation costs by roughly 270 to 320 billion rupees [14].
Show the maths
CRF = r ÷ (1 - (1 + r)-n), annual capital charge = capex × CRF- CRF
- the capital recovery factor: the share of the up-front cost paid back each year
- r
- the yearly cost of capital, as a fraction
- n
- the number of years the plant earns
- capex
- the up-front cost of the plant, in rupees
In plain words. You borrow money to build a solar plant and pay it back over its life, with interest. A higher interest rate means a bigger yearly payment for the same plant. Because solar has no fuel to buy, that payment is most of what you pay for the power.
Worked example. Capex Rs 2.78 crore per MW (one state regulator's benchmark for 2025-26) [18] and n = 25 years, the regulator's tariff period [18]. At r = 10.3% [14] the CRF is 0.1127, so the yearly charge is about Rs 31.4 lakh per MW; at an assumed r = 6% it is 0.0782, so about Rs 21.8 lakh, 31% lower (calculated) [20].
- 6 Resources and rules Soft limit Binds most today
What it gives. Solar needs grid connection, land and a buyer that can take its output at the right hours [15][16].
The idea. India added 38 GW of solar in 2025 but curtailed about 2.3 TWh of solar between late May and December that year to keep the grid secure, largely because demand was lower than expected [15]. In the first quarter of 2026, 300 GWh of renewable power was lost to transmission constraints, 178 GWh of it in the north [16].
The limit. Transmission lines, storage and flexible grid operation set how much solar a region can take; they are slower to build than a solar plant [15][16].
What could unlock it. Building transmission and storage and shifting demand to midday would reduce the losses; clean energy cannot scale efficiently without flexibility, says Ember [15].
HVDC HVDC linksPHS Pumped hydro storageV2G Demand response and vehicle-to-grid
as of 2026-11-23
Sources
- Photovoltaics Report Fraunhofer Institute for Solar Energy Systems ISE, 2026
- Photovoltaic materials: present efficiencies and future challenges (Polman, Knight, Garnett, Ehrler and Sinke; Science 352, aad4424; author manuscript) AMOLF institutional repository
- 4.3. How PV performance is measured (diode equation) Penn State, e-Education Institute (EME 812), 2024
- ITRPV 2026: Solar industry maintains historic learning curve despite market turbulence PV Tech, 2026
- India's 233 GW solar module manufacturing capacity faces demand and upstream integration challenges Down To Earth, 2026
- The cost of capital in clean energy transitions IEA, 2021
- Cost of capital for Indian renewable energy projects: review of methodologies, risk drivers and... (PDF) IEEFA, 2025
- India lost 2.3 TWh of solar generation due to grid security concerns, largely concentrated in the second half of 2025 Ember, 2026
- India lost 300 million units of renewable energy owing to transmission constraints in Q1 2026 Ember, 2026
- Renewable Power Generation Costs in 2024: Summary IRENA, 2025
- Petition No. 51 of 2025: benchmark capital cost and generic tariff for solar PV projects, FY 2025-26 Uttarakhand Electricity Regulatory Commission, 2025
- Solar Energy, chapter 9: Solar cell parameters and equivalent circuit TU Delft OpenCourseWare, 2016
- Simple levelized cost of energy (LCOE) calculator documentation National Laboratory of the Rockies (formerly NREL), US Department of Energy, 2026
- Applying endogenous learning models in energy system optimization arXiv (SINTEF Energy Research), 2021