Economics

The machine is mature: the record unit reached 49.37% net [4], and India's advanced programme aims for 46% against 41 to 42% for supercritical plants today [20], a gain of a few points. What is moving is how often plants run: India's coal load factor is expected to fall from 69% to about 55% by FY 2031-32 [15], while 65 to 70% of a new coal tariff is fixed charges [17].

The six layers

Mathematics, science, engineering, production, economics, and resources and rules: what each gives, the idea in plain words, the limit (hard or soft) and how close today is, what could unlock it, and the maths behind it

Six layers make a technology possible, from the mathematics underneath to the resources and rules it needs at world scale. A hard limit comes from mathematics or nature and can only be sidestepped; a soft limit moves with effort, scale, money or policy.

  1. 1 Mathematics Hard limit

    Mathematics is the language of its physics

    What it gives. The cycle arithmetic that turns steam tables into a plant design.

    The idea. A physical law makes the plant work and mathematics designs it: the Rankine cycle follows the water through pump, boiler, turbine and condenser and counts the heat going in and the heat going out [11]. Efficiency is one minus the heat out divided by the heat in [11].

    The limit. On paper, no cycle can beat the Carnot figure for the same two temperatures [10].

    What could unlock it. Reheat is a change to the cycle on paper; the record Pingshan II unit uses double reheat [4].

    Show the maths η = 1 - (h4 - h1) ÷ (h3 - h2)
    η
    the share of the heat put in that comes out as work, a fraction
    h1
    the heat content of each kilogram of water leaving the condenser, in kJ/kg
    h2
    the same after the feed pump, in kJ/kg
    h3
    the same as steam leaving the boiler, in kJ/kg
    h4
    the same as steam leaving the turbine, in kJ/kg

    In plain words. Follow one kilogram of water round the loop. The boiler puts heat in. The condenser takes heat out. Whatever is not taken out by the condenser is what the turbine turned into work. Engineers read the heat contents from steam tables, so the design becomes subtraction and division.

    Worked example. Assumption, for illustration only: h3 - h2 = 3,000 kJ/kg put in at the boiler and h4 - h1 = 1,950 kJ/kg given up at the condenser. Then η = 1 - 1,950 ÷ 3,000 = 0.35, or 35% (calculated) [11]. The numbers are not from a real plant; the source numbers the points pump 1 to 2, boiler 2 to 3, turbine 3 to 4 and condenser 4 to 1.

  2. 2 Science Hard limit

    What it gives. The second law of thermodynamics: heat can become work only as it falls from a hot place to a cold one.

    The idea. Carnot's limit says the most work you can take from heat depends only on the hot and cold temperatures, measured from absolute zero [10]. In coal and nuclear steam plants about two thirds of the energy is lost because of the limits of turning heat into work [7].

    The limit. The share of heat that becomes work cannot pass one minus the cold temperature divided by the hot temperature [10].

    What could unlock it. The only ways round it are a hotter boiler or a colder sink. India's advanced ultra-supercritical programme targets 46% plant efficiency against about 38% for subcritical and 41 to 42% for supercritical sets, and its research phase is complete [20]. Combined heat and power uses the heat the limit says must be given up.

    CCGT Gas turbines and combined cycleCHP Combined heat and power

    Show the maths ηmax = 1 - Tc ÷ Th
    ηmax
    the most work you can get from each unit of heat, a fraction
    Tc
    the cold temperature, in kelvin (degrees Celsius plus 273.15)
    Th
    the hot temperature, in kelvin (degrees Celsius plus 273.15)

    In plain words. Heat only does work as it falls from hot to cold, like water turning a wheel as it falls. The bigger the drop, the more you catch. You cannot make the cold side colder than the river or sea you cool with, so the only free choice is to make the hot side hotter.

    Worked example. Th: Pingshan II uses mature 600 °C-class materials [4], so take 600 °C = 873 K (assumption: steam at the full 600 °C). Tc: 30 °C = 303 K (assumption: a warm condenser). ηmax = 1 - 303 ÷ 873 = 0.653, or 65% (calculated) [10]. The plant's measured 49.37% net, on a lower heating value basis [4], is about three quarters of that (calculated). Heat is added to the water over a range of temperatures below the peak, so the real ceiling is lower than 65%.

  3. 3 Engineering Soft limit

    What it gives. A boiler, a turbine of many stages, a condenser and a generator that run for decades in heat and pressure.

    The idea. The US coal fleet averaged 10,647 Btu of fuel per kWh in 2025 [13], which is 32% efficiency (calculated) [12]. The best new unit, Pingshan II in China, reached 49.37% net on a lower heating value basis in a test on 13 December 2022 [4]; the two figures are not like for like, because the EIA pages do not say which heating value they use.

    The limit. The steam temperature that boiler tubes and turbine parts can survive; the best unit uses mature 600 °C materials [4].

    What could unlock it. India's research phase for 46% efficient plants is complete, and the world's first 800 MW demonstration plant of this kind is planned under the Ministry of Power and NTPC [20].

    Show the maths η = 3,412 ÷ HR
    η
    the plant's efficiency, a fraction
    3,412
    the energy in one kilowatt-hour of electricity, in Btu
    HR
    the heat rate: Btu of fuel burnt for each kWh sent out

    In plain words. A kilowatt-hour of electricity holds a fixed amount of energy. The heat rate says how much fuel energy the plant burnt to make it. Divide the first by the second and you get the share that was saved.

    Worked example. US coal fleet average heat rate 10,647 Btu/kWh in 2025: 3,412 ÷ 10,647 = 0.32, or 32% (calculated) [12][13].

  4. 4 Production Soft limit

    What it gives. Large forged rotors, boilers and generators, built in heavy-engineering factories.

    The idea. India has about 35 GW of new supercritical and ultra-supercritical coal plants under construction across 25 projects (August 2025) [16]. BHEL says it can deliver projects up to 20 GW in a year, and it expected to commission a record 9 GW of thermal capacity in 2024-25 [21]; the source does not say how much of the 20 GW is thermal.

    The limit. Each set is a very large machine made to order, so factory capacity and order books, not physics, set the pace [21].

    What could unlock it. The pipeline is already ordered and BHEL expected a record year [21], so the nearer question is how much these plants will run, not whether the machines can be made [16][21].

  5. 5 Economics Soft limit Binds most today

    What it gives. A tariff that repays a large upfront cost and an allowed return, whether or not the plant runs.

    The idea. Recent coal projects cost about Rs 10 to 12 crore a MW and around 65 to 70% of the new-plant tariff is fixed charges [17]. The regulator allows a base return on equity of 15.50% [18]. Utilisation is expected to fall from 69% in FY 2024-25 to about 55% by FY 2031-32 [15], because the fleet becomes a flexible balancing resource and not a baseload provider [19].

    The limit. Fixed charges are spread over fewer units as plants run less, and solar-plus-storage tenders are now at Rs 2.9 to 3.6 a kWh [15].

    What could unlock it. Ember's estimate is that a Rs 6 tariff becomes about Rs 7.25 a kWh once low utilisation is counted [15]; running as a flexible plant, or a cheaper way to meet the same fixed costs, would change this.

    Show the maths c = 104 × C × r ÷ (1 - (1 + r)-n) ÷ (CF × 8,760)
    c
    the capital charge in each kilowatt-hour, in rupees
    104
    rupees in each kW for every crore rupees a MW
    C
    the capital cost, in crore rupees for each MW
    r
    the yearly cost of capital, as a fraction
    n
    the years over which the cost is repaid
    CF
    the share of the year the plant runs at full power (load factor), as a fraction
    8,760
    hours in a year

    In plain words. A loan has to be repaid whether or not the plant runs. The first part spreads the cost over the repayment years. The second part divides that yearly bill by the units the plant actually sells. Sell fewer units and each one carries more of the bill.

    Worked example. C = Rs 11 crore a MW (midpoint of Rs 10 to 12) [17]; r = 15.5%, the regulator's equity return [18], used as an upper bound because 70% of the capital is debt [18]; n = 25 years, the useful life in the regulations [18]. The repayment factor is 0.159 and the yearly charge Rs 1.75 crore a MW. At CF 69% the charge is Rs 2.64 a kWh; at CF 55% it is Rs 3.31 a kWh (calculated) [14][15]. Ember reports fixed costs often above Rs 4 a kWh, which includes more than capital [15].

  6. 6 Resources and rules Soft limit

    What it gives. Coal, cooling water, ash space, clean-air permits and room on the grid at national scale.

    The idea. India had about 217 GW of coal and 6.6 GW of lignite in August 2025 [16], and plans about 80 GW of new thermal capacity by 2032 [19]. US figures put the water used by a plant with evaporative cooling towers at 2.7 or 3.0 litres for each kWh [7]. India's July 2025 revision limited flue-gas desulphurisation to about 19% of its 600 thermal plants [22].

    The limit. Water, clean-air rules and the power system's need for flexible plants decide where and how long a plant may run, rather than the steam cycle [19][22][7].

    What could unlock it. Rules have been relaxed where they raised cost: the retrofit costs about Rs 5 million a MW [22], and its scope was cut to about 19% of plants [22].

    Show the maths W = P × 8,760 × CF × w
    W
    the water used each year, in cubic metres
    P
    the plant's size, in megawatts
    8,760
    hours in a year
    CF
    the share of the year the plant runs at full power, as a fraction
    w
    the water used for each MWh, in cubic metres (the same number as litres a kWh)

    In plain words. Multiply the plant's size by the hours in a year to get its most possible output. Scale that by how much it really runs. Then multiply by the water each unit needs. The answer is the river or reservoir the plant must be able to draw on.

    Worked example. P = 800 MW (assumption: one large unit); CF = 0.69, India's coal fleet average in FY 2024-25 [15]; w = 2.7 m3 a MWh, the low end for cooling towers [7]. W = 800 × 8,760 × 0.69 × 2.7 = 13.1 million cubic metres a year (calculated).

as of 2026-11-23

Sources

  1. China's Pingshan Phase II Sets New Bar as World's Most Efficient Coal Power Plant POWER Magazine, 2023
  2. Cooling Power Plants World Nuclear Association, 2026, page updated 8 September 2026
  3. Carnot's Perfect Heat Engine: The Second Law of Thermodynamics Restated (College Physics 2e, section 15.4) OpenStax, 2022
  4. Ideal Rankine Cycle (lecture slide, EML3015) Florida A&M University-Florida State University College of Engineering, 2020
  5. What is the efficiency of different types of power plants? U.S. Energy Information Administration, 2025
  6. Electric Power Annual, Table 8.1: Average Operating Heat Rate for Selected Energy Sources, 2015 through 2025 US Energy Information Administration, 2026
  7. Equations and Variables in the ATB (2024) NREL, 2024
  8. Coal power to get costlier (Coal's diminishing role in India's electricity transition) Ember, 2026
  9. India's power generation capacity additions (Coal's diminishing role in India's electricity transition) Ember, 2025
  10. Changing Dynamics: Outlook for power procurement costs and tariffs Power Line, 2026
  11. CERC (Terms and Conditions of Tariff) Regulations, 2024 Central Electricity Regulatory Commission, 2024
  12. Coal plants' PLF to fall to 55% by FY32: Report Business Today, 2025
  13. Advanced Ultra Supercritical (Adv. USC) Technology for Thermal Power Plants Department of Heavy Industries, Government of India, 2026
  14. BHEL: Expanding its energy portfolio Power Line, 2025
  15. Easing the Norms: FGD to remain relevant despite the relaxation of SO2 mandates Power Line, 2025