Hydrogen direct reduction (green steel): Levers

Held back most by

Economics

The chemistry sets a floor of 54 kg of hydrogen a tonne of iron [8] and a pilot works [17], but TERI finds hydrogen direct reduction about 20% dearer per tonne of steel than a new blast furnace plant [11], with a blended cost of capital near 10.4% (calculated) and no path to competitiveness without public support [11]. IECC is more hopeful, at roughly 5% dearer by 2030 [12][13]; both put the gap in money and buyer risk, not science.

The six layers

Mathematics, science, engineering, production, economics, and resources and rules: what each gives, the idea in plain words, the limit (hard or soft) and how close today is, what could unlock it, and the maths behind it

Six layers make a technology possible, from the mathematics underneath to the resources and rules it needs at world scale. A hard limit comes from mathematics or nature and can only be sidestepped; a soft limit moves with effort, scale, money or policy.

  1. 1 Mathematics Hard limit

    Mathematics is the language of its physics

    What it gives. Balancing the reaction equation counts how much hydrogen and how much steam each tonne of iron involves, which sizes the electrolysers, pipes and gas loops [8].

    The idea. A physical law makes the process work and mathematics only does the counting, so the role is language. Each Fe2O3 unit gives up three oxygen atoms to three H2 molecules, so every 2 iron atoms need 3 hydrogen molecules: 54 kg of hydrogen for each tonne of iron made from hematite [8].

    The limit. Atoms are conserved, so no design can use less than 54 kg of hydrogen per tonne of iron from hematite [8].

    What could unlock it. Only a different ore or reducing gas changes the count; with hydrogen the saving is in wasting none, because unused hydrogen is recycled, mixed with fresh hydrogen and reheated [8].

    Show the maths mH2 = mFe × 3 × MH2 ÷ (2 × MFe)
    mH2
    the mass of hydrogen needed, in kilograms
    mFe
    the mass of iron to be made, in kilograms
    MH2
    the mass of one mole of hydrogen molecules, 2.016 grams
    MFe
    the mass of one mole of iron atoms, 55.845 grams

    In plain words. Rust-like iron ore holds iron and oxygen locked together. Each hydrogen molecule can carry away one oxygen atom as water. Count the oxygen atoms and you know how many hydrogen molecules you need, and so how many kilograms.

    Worked example. From Fe2O3 + 3H2 = 2Fe + 3H2O [8], 3 × 2.016 ÷ (2 × 55.845) = 0.0541, so 54.1 kg of hydrogen for each tonne of iron (calculated), which matches the 54 kg the paper gives [8].

  2. 2 Science Hard limit

    What it gives. Hot hydrogen takes oxygen from iron oxide and leaves as steam, so the exhaust is water, not carbon dioxide [8].

    The idea. The last step, wustite to iron, takes in heat with hydrogen but gives it out with carbon monoxide, so a hydrogen shaft cools as it works and the recycled gas has to be reheated to 800 to 900 °C [8]. Midrex designs for about 58 kg of hydrogen per tonne of direct reduced iron, a conservative estimate [10]; that is per tonne of a product that is not pure iron, so it cannot be set directly against the 54 kg per tonne of iron [8].

    The limit. Chemistry fixes a floor of 54 kg of hydrogen per tonne of iron, and the reaction with hydrogen takes in heat [8].

    What could unlock it. The floor is chemistry, so it can only be approached, by wasting no hydrogen; the larger gains lie in the electricity behind the hydrogen [8][13].

    Elz Electrolysers

    Show the maths ΔG° = ΔH° - TΔS° = -RT ln K
    ΔG°
    the standard Gibbs energy change of the reaction, in kilojoules per mole
    ΔH°
    the heat the reaction takes in or gives out, in kilojoules per mole
    T
    the temperature, in kelvin
    ΔS°
    the change in disorder, in kilojoules per mole per kelvin
    R
    the gas constant, 8.314 joules per mole per kelvin
    K
    the equilibrium constant: how far the reaction runs before it stops moving, a pure number

    In plain words. Every reaction runs until it reaches a balance. ΔG° says where the balance sits: the more negative it is, the more of the mixture ends up as products. With hydrogen and iron oxide the balance leaves some hydrogen unused in the exhaust, so the exhaust is dried and the leftover hydrogen goes round again.

    Worked example. At 1,073 K (800 °C, the low end of the reheating range in [8]), R × T × ln 10 = 8.314 × 1,073 × 2.303 = about 20.5 kJ per mole (calculated), so each extra 20.5 kJ per mole of negative ΔG° makes K ten times bigger [19].

  3. 3 Engineering Soft limit

    What it gives. The ore stays solid in a shaft furnace while hot hydrogen flows through it; the exhaust steam is condensed and the hydrogen is mixed with fresh hydrogen and reheated [8][10].

    The idea. Making the hydrogen is the big energy cost. At IECC's base case of 52 kWh of electricity per kilogram of hydrogen [13], the 54 kg needed for a tonne of iron takes about 2.8 MWh (calculated). IECC's whole route, 66 kg of hydrogen per tonne of steel plus 0.6 MWh in the arc furnace, comes to about 4 MWh per tonne of steel (calculated) [13].

    The limit. Electricity per kilogram of hydrogen, and heat to keep the gas hot, set what a plant can reach; energy is also required to heat the reducing gas [10][13].

    What could unlock it. Better electrolysers and heat recovery: every kWh saved per kilogram of hydrogen cuts 54 kWh from each tonne of iron (calculated) [8].

    Elz Electrolysers

    Show the maths E = mH2 × e
    E
    the electricity used to make the hydrogen for one tonne of iron, in kilowatt-hours
    mH2
    the hydrogen needed for that tonne, in kilograms
    e
    the electricity the electrolyser uses per kilogram of hydrogen, in kilowatt-hours

    In plain words. The hydrogen is not free. You pay for it in electricity. Multiply the kilograms of hydrogen by the electricity each kilogram costs, and you have the power bill for a tonne of iron.

    Worked example. 54 kg × 52 kWh per kg = 2,808 kWh, about 2.8 MWh per tonne of iron (calculated) [8][13].

  4. 4 Production Soft limit

    What it gives. Hydrogen-reduced iron has been made at pilot scale: more than 5,000 tonnes at HYBRIT's plant in Luleå by August 2024 [17].

    The idea. The first commercial plants are far larger than any pilot: Stegra's Boden plant is designed to produce up to 5 million tonnes a year of green steel by 2030, with 700 MW of electrolysis [16]. In June 2026, after a financing round of 1.4 billion euros, Stegra said its project timeline was under review [15].

    The limit. First-of-a-kind scale: Mining Weekly reports that high costs and the difficulty of scaling green hydrogen have forced several planned projects to be curtailed [15].

    What could unlock it. Pilots are how the learning starts: India sanctioned three pilot projects in the steel sector, with Rs 347 crore of central support, in October 2024 [18].

    Elz Electrolysers

  5. 5 Economics Soft limit Binds most today

    What it gives. TERI models the levelised cost of steel from hydrogen direct reduction at about 20% above a new blast furnace plant and about 40% above an existing one [11]. IECC puts green steel roughly 5% above steel from new blast furnace plants by 2030 [12][13].

    The idea. The two studies differ mainly in the hydrogen price and in what capital they count. TERI assumes hydrogen at around USD 3.8/kg in 2030 and counts total investment, including energy and fuel supply, at just over USD 1,400 million (Rs 11,700 crore) per Mt, about 60% above the blast furnace route [11]. IECC assumes USD 3.0 a kilogram by 2030 and a steel plant capex of USD 670 per tonne of yearly capacity, with the hydrogen equipment costed inside the hydrogen price [13].

    The limit. Cost of capital, hydrogen price and buyer risk: larger Indian steel firms borrow at about 8% with equity at 16% on a 70:30 split, about 10.4% blended (calculated) [11]. Under its baseline TERI finds no path to competitiveness without public support, and calls first projects inherently riskier [11].

    What could unlock it. Concessional finance 2 points cheaper on both debt and equity would cut them to 6% and 14% [11], a blended 8.4% (calculated). Cheaper hydrogen helps most: IECC has it reaching approximately US$2.50/kg by 2035 [12].

    Elz Electrolysers

    Show the maths CRF = r ÷ (1 - (1 + r)-n), annual capital charge = capex × CRF
    CRF
    the capital recovery factor: the share of the up-front cost paid back each year
    r
    the yearly cost of capital, as a fraction
    n
    the number of years the plant earns
    capex
    the up-front cost of the plant, in rupees per tonne of yearly capacity

    In plain words. A steel plant is paid for up front and earns for many years. The money behind it costs interest every year. A higher interest rate means a bigger yearly charge on the same plant, and for a first plant that charge is a big part of the price of each tonne.

    Worked example. TERI's total investment is Rs 11,700 crore per Mt a year, so Rs 1.17 lakh per tonne of yearly capacity, over a plant lifetime of 20 years [11]. At r = 10.4% the CRF is 0.1207, so Rs 14,100 per tonne a year; at the concessional 8.4% it is 0.1049, so Rs 12,300, about 13% lower (calculated) [11][14].

  6. 6 Resources and rules Soft limit

    What it gives. A green steel plant needs a large block of steady renewable power and a buyer that will commit to low-carbon steel [11][12].

    The idea. India plans about 180 to 195 million tonnes a year of blast furnace capacity by 2030-31, which would make the coal route harder to leave [12]. The effective EU carbon border cost on Indian blast furnace steel starts at about US$91 a tonne in 2030 [12].

    The limit. Renewable power, hydrogen supply and committed buyers: IECC says that without a verifiable near-zero definition and committed offtake, early H2-DRI projects struggle to secure financing [12].

    What could unlock it. Solar, wind and storage supplying steady power, and pilot support: India's three sanctioned steel pilots carry Rs 347 crore of central support [18].

    PV Solar photovoltaicsWOn Onshore windH2S Hydrogen storage

    Show the maths P = Q × e ÷ h, solar capacity = P ÷ CF
    P
    the average electric power the plant draws, in megawatts
    Q
    the steel made in a year, in tonnes
    e
    the electricity used per tonne of steel, in megawatt-hours
    h
    the hours in a year, 8,760
    CF
    the share of the year a solar plant gives full output, as a fraction

    In plain words. Take the yearly power bill and spread it over the hours of the year to get the steady power the plant needs. Solar gives full output only a fifth of the time, so you need about five times that much solar, before storage.

    Worked example. For 1 million tonnes a year at 4.03 MWh per tonne (calculated: 66 kg × 52 kWh + 0.6 MWh [13]), P = 1,000,000 × 4.03 ÷ 8,760 = about 460 MW; at a solar capacity factor of 20% [13] that needs about 2.3 GW of solar (calculated), before storage losses.

as of 2026-11-23

Sources

  1. Hydrogen Ironmaking: How It Works (Patisson and Mirgaux, Metals 10(7), 922) MDPI, 2020
  2. MIDREX H2: The Road to CO2-free Direct Reduction (AISTech 2021 paper; undated, year from its file name and a February 2021 reference) Midrex Technologies (AISTech paper, hosted by Primetals), 2021
  3. Green Steel by 2030: Building the business case for the first green steel plant in India TERI, 2026
  4. The Economic Case for Green Steel Production in India India Energy and Climate Center, University of California, Berkeley (IECC), 2026
  5. Economic Case for Green Steel Production in India (report, May 2026) India Energy and Climate Center, University of California, Berkeley (IECC), 2026
  6. Simple levelized cost of energy (LCOE) calculator documentation National Laboratory of the Rockies (formerly NREL), US Department of Energy, 2026
  7. Green steel startup Stegra closes $1.6bn financing round Mining Weekly, 2026
  8. Stegra to boost Boden construction after new funding Eurometal (Kallanish), 2026
  9. HYBRIT: Six years of research paves the way for fossil-free iron and steel production on an industrial scale Vattenfall, 2024
  10. Government sanctions pilot projects for green hydrogen in the steel sector Press Information Bureau, Ministry of New and Renewable Energy, 2024
  11. Free Energy and the Equilibrium Constant (Chemistry 2e, OpenStax) LibreTexts Chemistry, 2024