Macadam and tarmac roads
Layers of graded broken stone, later bound with tar, give smooth, cheap, drained roads.
Moving people and goods · Road · No. 232
- First industrial revolution
- Readiness 9 of 9
- Process
McAdam's insight was that dry soil carries the load, so small, sharp stones packed on drained ground need no heavy foundation.
Chart: Illustration: Macadam and tarmac roads
Where it comes from
Chart: Map of where it comes from
John Loudon McAdam, a Scot, became surveyor general of the Bristol roads in 1815 and published his method in 1816. By 1818 he was advising 34 road trusts, and others across Britain soon copied it.
Three things to know
- McAdam allowed no stone heavier than six ounces, about 170 g, and laid broken stone about ten inches, or 25 cm, deep.
- His roads were raised only slightly at the centre: three inches on a road 30 feet wide, about 7.6 cm on 9.1 m.
- In 1901 a Nottingham surveyor noticed that a road accidentally coated with tar and slag stayed free of dust, which led to tarmac.
The journey
- 1 DrainThe ground is shaped and drained so the soil beneath stays dry
- 2 BreakStone is broken into small, angular pieces of a set size
- 3 LayLarger broken stone goes at the bottom, smaller at the top
- 4 CompactTraffic or rollers press the stones into an interlocking crust
- 5 BindLater, tar or bitumen seals the surface against water and dust