EV charger: Bill of materials
About these figures
Which unit, study and year the composition figures describe, and how they vary
The amounts are one declared unit of the XCHARGE C6EU (120 kW version, 385 kg, 2022 data) for Fast and the C7 (240 to 420 kW, 750 kg, 2022 data) for Ultra-fast [2][3]. No composition for a 60 kW unit was found. The 'other' group (56.86 kg in the C6EU, 206.07 kg in the C7) and electronics are not split. The C7's copper looks too low. The power modules, charging cable and connector are inside these totals and are not linked.
as of 2026-11-17
Direct materials
The commodities and chemicals in one unit as bought, with amount, mass share, cost share and recycled content
Variant 1 Fast| Material | Role | Amount in one unit | Share of the unit's mass |
|---|---|---|---|
| St Steel | Structural | 214.02 kg | 55.7% |
| Calculated: 198.43 kg of steel plus 15.59 kg of ferrous metal in the 120 kW C6EU declaration [2]. Cabinet and frame; split between the two not given. | |||
| Cu Copper | Functional | 73.87 kg | 19.22% |
| Wiring, busbars and magnetics in the 120 kW C6EU [2]. An Indian circularity article puts the copper in a DC fast charger unit at about 8 kg [17], and the C7 declares only 4.44 kg [3]; the sources disagree widely. | |||
| Al Aluminium | Structural | 12.91 kg | 3.36% |
| 120 kW C6EU [2]. | |||
| ABS ABS | Structural | 0.59 kg | 0.15% |
| 120 kW C6EU [2]. A further 23.69 kg is listed as 'plastic, other' with no polymer named. | |||
| PS Polystyrene and EPS | Structural | 0.28 kg | 0.07% |
| 120 kW C6EU [2]. | |||
| Material | Role | Amount in one unit | Share of the unit's mass |
|---|---|---|---|
| St Steel | Structural | 403.67 kg | 53.8% |
| Calculated: 349.93 kg of steel plus 53.74 kg of ferrous metal in the C7 declaration, over its 750 kg weight [3]. The table's kg values add to 745.77 kg. | |||
| Al Aluminium | Structural | 45.77 kg | 6.1% |
| C7 declaration [3]; mass share calculated over 750 kg. The table's kg values add to 745.77 kg. | |||
| Cu Copper | Functional | 4.44 kg | 0.6% |
| As declared for the C7 [3], but doubtful: the C7's 4.44 kg is a sixteenth of the smaller C6EU's 73.87 kg [2]. The C7 table's own shares add to about 106% and fit a mass of about 701 kg, not the declared 750 kg, and 206.07 kg is listed only as 'Other', which may hold the copper in the power modules and cable. Treat it as a lower bound. | |||
as of 2026-11-17
Cost breakdown
The share of the unit's cost in each component or stage
| Part | Share of cost | Variant | Year | Source |
|---|---|---|---|---|
| Charger hardware (calculated: 28,401 of 73,907 USD) | 38.4% | Fast | 2019 | [5] |
| Installation, one charger per site (calculated: 45,506 of 73,907 USD) | 61.6% | Fast | 2019 | [5] |
| Charger hardware (calculated: 75,000 of 122,781 USD) | 61.1% | Ultra-fast | 2019 | [5] |
| Installation, one charger per site (calculated: 47,781 of 122,781 USD) | 38.9% | Ultra-fast | 2019 | [5] |
as of 2026-11-17. Shares of the cost of a charger as installed for a 50 kW (Fast) and a 150 kW (Ultra-fast) unit, one charger per site, in 2019 US dollars. The split of the hardware itself was not found.
How it is put together
The main steps from parts and materials to the finished unit
| Step | What happens | Technology | Source |
|---|---|---|---|
| Build the power modules | Semiconductor switches, magnetics and capacitors are mounted on boards to make AC to DC modules of about 20 to 30 kW each. | Transformers and power electronics | [4] |
| Build the control electronics | A controller, communications and payment boards are made and tested. | integrated_circuit | – |
| Make the cabinet | Steel and aluminium sheet is cut, folded, welded and coated to make the weatherproof enclosure. | Arc welding | – |
| Mould plastic parts | Covers, screens and holders are moulded in plastic. | Injection moulding | – |
| Wire and fit the cabinet | Modules, copper busbars and cable, contactors and cooling are fitted and wired into the cabinet. | – | – |
| Add the output cable | The charging cable and connector are attached; in India the CCS2 connectors and fast-charging cables were imported in 2022. | – | [18] |
| Test and ship | Each unit is tested before it is packed and shipped; testing is the only electricity use the C7's maker reports for production. | – | [3] |
as of 2026-11-17
Technologies used to make it
The technologies used to make it, at which step
Made with- Wld Arc welding Welding the steel cabinet The cabinet is more than half steel by mass in the C6EU declaration [2]; no share of chargers made this way found.
- IM Injection moulding Moulding plastic covers and holders Plastics are about 6% of the C6EU's mass [2]; no share found.
as of 2026-11-17
Technologies inside it
The technologies inside the product, with how much of each per unit
Embodies- PE Transformers and power electronics The power modules are rectifier and converter stages; a 60 kW unit often has 2 or 3 of them [4].
- MOS MOSFET Charger power stages use silicon carbide or silicon MOSFETs, or IGBTs; the silicon carbide version is the most efficient across the load range [20].
as of 2026-11-17
Sources
- Environmental Product Declaration: C6EU Charging Station (MR-EPDITALY0066, Beijing XCHARGE Technology Co.) EPDItaly, 2023
- Environmental Product Declaration: Smart DC Charger C7 (MR-EPDITALY0079, Beijing XCHARGE Technology Co.) EPDItaly, 2023
- Technical guide to 60kW DC fast chargers: engineering, grid integration, and TCO Mida Power (charger maker), 2026
- Estimating electric vehicle charging infrastructure costs across major U.S. metropolitan areas (Working Paper 2019-14) International Council on Clean Transportation (Michael Nicholas), 2019
- Closing the loop: EV charging infrastructure circularity in India Humans of EV (Pranay Theerdhala), 2025
- EV charger manufacturing in India: challenges and opportunities EVreporter (interview with Ador Digatron), 2022
- Cost and efficiency of Level-3 DC fast-charging power modules: a benchmark comparison Vincotech (Baran Ozbakir)