Insulated power cable: Interventions
Try this in What if Switch on levers and see what changes in India by 2036.
Interventions
Changes that would cut emissions or material use, by lever and life stage, with effect per unit, readiness, adoption, evidence and who acts
| Lever | Life stage | Change | Effect per unit | Readiness | Adoption | Who acts | Source |
|---|---|---|---|---|---|---|---|
| Circularity | End of life | Recover conductor metal and polymers from retired cable | The APAR declaration credits 3.92 kg CO2e per m of cable for recycling, against 6.02 kg for making it, so about 65% of making emissions (calculated) | Deployed for metals; the credit is a declared scenario | India meets 38% of copper demand from secondary copper | Cable makers, scrap dealers, recyclers | [5][9] |
| Design | Components design | Raise conductor temperature and voltage so one cable carries more power | A 525 kV bipole carries up to 2.5 GW; NKT has qualified 90 C continuous conductor temperature, which raises capacity (the size of the gain is not given) | Qualified (2026) | Used in projects such as SuedLink, SuedOstLink and Viking Link | Cable makers, grid operators | [3][17] |
| Substitute | Components design | Choose an aluminium conductor in place of copper where cross-section can grow | No like-for-like figure: the aluminium reference (8.7/15 kV, about 4.7 t per km) and the copper reference (0.6/1 kV, about 6.4 t per km) differ in voltage | Deployed; copper holds 54% of the global power cable market | Aluminium and copper both used in 525 kV cables [3] | Designers, cable makers | [8][2][1][3] |
| Business model | Supply chain | Secure cable factory capacity early to shorten the wait | Procuring cables takes two to three years, and DC cables over five; the saving per km is not quantified | Deployed in the market | NKT's high-voltage backlog was EUR 10.2 billion at end 2025 | Grid operators, cable makers | [6][15] |
as of 2026-11-13
Sources
- Environmental product declaration: NYCWY 4x120 SM/70 (NEPD-4568-3821-EN) NKT A/S (made by NKT s.r.o., Kladno), registered with The Norwegian EPD Foundation, 2023, material composition and GWP-total tables; issued 14 June 2023
- Power Cable 72282140 - RHZ1-OL 8.7/15 3X1X240KAL+H25 (EPDITALY1100) Cabelte - Cabos Eléctricos, S.A., registered with EPDItaly, 2025, composition and climate change tables; declared unit one km of cable with a load of 1 A; issued 22 July 2025
- 525 kV HVDC Prysmian, indicative weights and cross-sections; the page shows no date
- Aerial Bunched Cable (3*70+1*54.6 SQMM), EPD (HUB-5185) APAR Industries Limited, registered with EPD Hub, 2026, GWP-total table; published 29 January 2026
- Building the Future Transmission Grid: executive summary IEA, 2025
- Copper power cable underpins the energy transition International Copper Association (research by SAI Industrial LLC), press release; no date shown on the page
- Copper's Key Role in Cables International Copper Association India, 2025, August 2025, pages 49 to 52
- NKT A/S Annual Report 2025: 6% organic growth and record-high operational EBITDA NKT, 2026, dated 25 February 2026
- NKT qualifies 525 kV HVDC subsea power cable system for operation at 90 °C Cyprus Shipping News, 2026