Carbon capture and storage: Evolution
Timeline
The milestones from first idea to today
| Year | Milestone |
|---|---|
| 1972 | The Terrell gas plant in Texas begins supplying captured carbon dioxide for oil recovery through a 220-mile pipeline [1][5] |
| 1996 | Sleipner in Norway, the first offshore CCS facility, starts storing about 1 Mt a year [1][6] |
| 2014 | Boundary Dam in Canada starts capturing about 1 Mt a year at a coal power station [1] |
| 2024 | Eight new CCUS projects begin operating [2] |
| 2025 | Operating capacity passes 50 Mt a year in the first quarter [2] |
as of 2026-11-11
Lineage
The technologies it came from and the ones that came from it
Works with- DAC Direct air capture Direct air capture takes carbon dioxide from open air and relies on the same compression, transport and storage.
- OGw Conventional oil and gas production Most capture is at natural gas processing plants, and the first projects supplied carbon dioxide to push oil out of Texas fields [1][2].
- PC Portland cement Cement kilns release carbon dioxide from limestone itself, and the IEA points to the world's largest capture project at a cement plant, in Norway [2].
as of 2026-11-11
Sources
- Appendix C: CCUS Project Summaries (Meeting the Dual Challenge: A Roadmap to At-Scale Deployment of Carbon Capture, Use, and Storage, updated 12 March 2021) National Petroleum Council, hosted by US Department of Energy, 2021
- CCUS projects around the world are reaching new milestones International Energy Agency (Carl Greenfield and Josephine Tweneboah Koduah), 2025
- Val Verde Fact Sheet: Carbon Dioxide EOR Project MIT Carbon Capture and Sequestration Technologies
- 25 years of successful offshore CO2 storage in Norway Equinor