Carbon capture and storage: Evolution

Timeline

The milestones from first idea to today

YearMilestone
1972The Terrell gas plant in Texas begins supplying captured carbon dioxide for oil recovery through a 220-mile pipeline [1][5]
1996Sleipner in Norway, the first offshore CCS facility, starts storing about 1 Mt a year [1][6]
2014Boundary Dam in Canada starts capturing about 1 Mt a year at a coal power station [1]
2024Eight new CCUS projects begin operating [2]
2025Operating capacity passes 50 Mt a year in the first quarter [2]

as of 2026-11-11

Lineage

The technologies it came from and the ones that came from it

Works with
  • DAC Direct air capture Direct air capture takes carbon dioxide from open air and relies on the same compression, transport and storage.
  • OGw Conventional oil and gas production Most capture is at natural gas processing plants, and the first projects supplied carbon dioxide to push oil out of Texas fields [1][2].
  • PC Portland cement Cement kilns release carbon dioxide from limestone itself, and the IEA points to the world's largest capture project at a cement plant, in Norway [2].

as of 2026-11-11

Sources

  1. Appendix C: CCUS Project Summaries (Meeting the Dual Challenge: A Roadmap to At-Scale Deployment of Carbon Capture, Use, and Storage, updated 12 March 2021) National Petroleum Council, hosted by US Department of Energy, 2021
  2. CCUS projects around the world are reaching new milestones International Energy Agency (Carl Greenfield and Josephine Tweneboah Koduah), 2025
  3. Val Verde Fact Sheet: Carbon Dioxide EOR Project MIT Carbon Capture and Sequestration Technologies
  4. 25 years of successful offshore CO2 storage in Norway Equinor