1882Pearl Street station in New York supplies its first customers through underground conductors in conduits [1]
1889Ferranti's concentric 10,000-volt main is installed at Deptford power station, London [11]
1890The first paper-insulated 10,000-volt supply cable enters service, remaining in use until 1933 [2]
1995Extruded XLPE cables are in use at 275 kV [3]
2014Installation of the 1 km, 10 kV AmpaCity superconducting cable in Essen, Germany, is completed [7]
2023Viking Link, 1.4 GW over 475 miles of land and subsea cable, begins commercial operation [4]

as of 2026-11-11

Lineage

The technologies it came from and the ones that came from it

Came before it Works with

as of 2026-11-11

Sources

  1. Milestones: Pearl Street Station, 1882 IEEE History Center (Engineering and Technology History Wiki)
  2. Sample of First Paper-Insulated Cable Science Museum Group Collection
  3. HVAC cross-linked polyethylene (XLPE) Cables ENTSO-E Technopedia, 2025
  4. National Grid announces commercial operations of Viking Link National Grid, 2023
  5. Section of Superconducting cable Science Museum Group Collection
  6. Sample of Ferranti Concentric Main Supply Cable Science Museum Group Collection