Material Insights · Understanding the Material World

Underground, submarine and superconducting cables: Overview

What it does

The job the technology does for people, in a short paragraph

Power cables carry electricity where overhead lines cannot go or are not wanted: under city streets, through protected land and across the seabed. Edison's first power station fed its customers through underground conductors in 1882 [1]. Today the longest links join whole countries, such as the 1.4 GW Viking Link between Britain and Denmark, opened in 2023 [4]. Burying a line costs on average about 4.5 times as much as building it overhead [5].

as of 2026-11-11

How it works

The working principle in plain words, step by step

A cable is a thick metal core, of copper or aluminium, wrapped in insulation that holds back the voltage [3]. Modern cables use cross-linked polyethylene (XLPE), a tough plastic; older ones used oil-soaked paper [2][3]. Offshore cables, and some land cables in wet ground, add a lead sheath against water [3]. Unlike a bare overhead wire cooled by the air, a buried core sheds heat slowly, so it must be thicker to carry the same current. A cable also behaves like a long capacitor, two conductors separated by thin insulation. With AC the voltage reverses many times a second, and the charging current this draws limits a 380 kV AC cable to about 40 to 60 km without compensation [3]. Longer links, such as Viking Link, therefore use high-voltage DC [4].

as of 2026-11-11

Key figures

The handful of numbers that size it up, each with its unit, year and source

FigureValueUnitYearSource
Capacity of Viking Link, Britain to Denmark1.4GW2023[4]
Length of Viking Link under land and sea, the world's longest (475 miles)764km2023[4]
Average lifetime cost of underground cable compared with overhead line, Great Britain4.5times2025[5]
Lifetime cost of an offshore HVDC point-to-point cable compared with overhead line5times2025[5]
Rise in cable prices since 20192times (nearly doubled)2025[6]

as of 2026-11-11. The 764 km is calculated from the 475 miles National Grid gives [4]. The cost ratios compare the average lifetime cost of 1 MW of new network capacity over 1 km with that of an overhead line [5]; the 2025 years are the publication years of the IET release and the IEA report, not data years.

Where it is used

The main places and products the technology is found in

  • Underground mains under city streets, since Edison's First District in New York in 1882 [1]
  • Subsea interconnectors between countries, such as Viking Link [4]
  • Offshore HVDC networks connecting several sites to the onshore grid [5]
  • Superconducting cables in crowded city grids, such as the 1 km AmpaCity cable in Essen [7]
  • AC land cables up to 550 kV in transmission grids [3]

as of 2026-11-11

Scale today

How much of it there is now: units in use, made each year and who uses it

Users
Grid operators and interconnector owners, such as National Grid and Energinet for Viking Link [4]
Unit
km
Year
2025
Note
No world total of cable length was found. Demand is outrunning supply: it takes two to three years to procure cables, and over five years for DC cables [6].

as of 2026-11-11

Sources

  1. Milestones: Pearl Street Station, 1882 IEEE History Center (Engineering and Technology History Wiki)
  2. Sample of First Paper-Insulated Cable Science Museum Group Collection
  3. HVAC cross-linked polyethylene (XLPE) Cables ENTSO-E Technopedia, 2025
  4. National Grid announces commercial operations of Viking Link National Grid, 2023
  5. Rewiring Britain's future: IET releases key report in helping Britain's Power Grid reach net zero Institution of Engineering and Technology (IET), 2025
  6. Building the Future Transmission Grid: executive summary IEA, 2025
  7. Section of Superconducting cable Science Museum Group Collection