Material Insights · Understanding the Material World

Geothermal power plants: Levers

Held back most by

Economics

Geothermal's physics is settled but its cost is rising: plants commissioned in 2025 averaged USD 89 per MWh, 53% more than in 2010, against USD 44 for solar PV, driven largely by the cost of finance for capital-intensive projects [22]. India names high upfront costs and exploration risk as the main challenge [16]. The IEA sees costs of next-generation geothermal falling 80% by 2035 with the right support [5].

The six layers

Mathematics, science, engineering, production, economics, and resources and rules: what each gives, the idea in plain words, the limit (hard or soft) and how close today is, what could unlock it, and the maths behind it

Six layers make a technology possible, from the mathematics underneath to the resources and rules it needs at world scale. A hard limit comes from mathematics or nature and can only be sidestepped; a soft limit moves with effort, scale, money or policy.

  1. 1 Mathematics Hard limit

    Mathematics is the language of its physics

    What it gives. Fourier's law of conduction, written in mathematics, tells a developer how much heat the ground carries upward and so how large an area a plant must draw on [21].

    The idea. A physical law of heat flow does the work and mathematics only describes it, so the role is language. In ordinary continental crust a gradient of 25 K per km and a conductivity of 2.5 W per metre per kelvin give a heat flux of 62.5 mW/m², close to the continental average of 65 mW/m² [18]. That is only 62.5 kW under each square kilometre (calculated).

    The limit. Heat flux is conductivity times temperature gradient, so ordinary ground sends up only tens of milliwatts a square metre and a plant must draw on heat stored in unusually hot rock [18][21].

    What could unlock it. Steeper gradients near plate edges change the input; the IEA expects next-generation geothermal, using drilling methods from oil and gas, to cut costs by 80% by 2035 with the right support [5].

    AGS Advanced geothermal

    Show the maths Q ÷ t = k × A × (T2 - T1) ÷ d
    Q
    the heat that flows, in joules
    t
    the time it flows for, in seconds
    k
    how well the rock carries heat (thermal conductivity), in watts per metre per kelvin
    A
    the area the heat flows through, in square metres
    T2 - T1
    the temperature difference across the layer, in kelvin
    d
    the thickness of the layer, in metres

    In plain words. Heat moves from hot to cold. The bigger the temperature difference across a layer of rock, the faster the heat moves. A thicker layer slows it down. Ordinary ground warms by only a little for each metre you dig, so only a trickle of heat flows up.

    Worked example. Take k = 2.5 W/(m K) and a gradient (T2 - T1) ÷ d of 25 K per km, which is 0.025 K per metre [18]. The heat flux is 2.5 × 0.025 = 0.0625 W/m², or 62.5 mW/m² (calculated) [18][21]. Over 1 km² (1,000,000 m²) that is 62.5 kW (calculated). A 1 MW plant at the world-average 12% conversion [14] needs 1 ÷ 0.12 = 8.3 MW of heat, the natural flow through about 133 km² of ordinary ground (calculated).

  2. 2 Science Hard limit

    What it gives. A heat engine can turn only part of the heat in the fluid into work, and that part grows with the fluid's temperature [13].

    The idea. The Carnot efficiency is 1 minus the cold temperature over the hot, both in kelvin [12]. For a 250 °C fluid and 25 °C surroundings (assumed) it is 43%, and for India's 100 to 180 °C resources [16] it is 20% to 34% (calculated). Real plants average around 12% of the heat in the fluid, across 94 plants reviewed [14].

    The limit. Carnot limit: no heat engine working between two temperatures can do better than 1 minus cold over hot [13].

    What could unlock it. Only a hotter source, or a colder sink, lifts the ceiling [12]; the IEA expects next-generation geothermal, built on oil and gas drilling methods, to open more sites [5].

    AGS Advanced geothermalORC Organic Rankine, Kalina and sCO2 cycles

    Show the maths ηmax = 1 - Tc ÷ Th
    ηmax
    the most work you can get from each unit of heat, as a fraction
    Tc
    the temperature of the cold side (air or cooling water), in kelvin
    Th
    the temperature of the hot fluid, in kelvin

    In plain words. A turbine works only because heat falls from hot to cold, like water falling over a weir. The bigger the drop in temperature, the more work you get. Geothermal fluid is not very hot, so the drop is small and most of the heat has to be thrown away.

    Worked example. Take a 250 °C fluid (523.15 K) and 25 °C surroundings (298.15 K), both assumed. The ceiling is 1 - 298.15 ÷ 523.15 = 0.430, or 43.0%. At 180 °C (453.15 K) it is 34.2% and at 100 °C (373.15 K) it is 20.1% (calculated) [12][16].

  3. 3 Engineering Soft limit

    What it gives. Wells bring hot fluid to a turbine and generator, and the plants run almost all the time: plants commissioned in 2025 averaged an 85% capacity factor [22].

    The idea. Real plants convert from about 1% of the fluid's heat (binary plants on cool fluid) to about 21% (Darajat, a vapour-dominated field) [14]. Flash plants generally cost less to build than binary plants because they have fewer parts and run hotter [6].

    The limit. Geothermal power projects are capital intensive and site specific, so each plant must be designed to its own field [16].

    What could unlock it. Horizontal drilling and hydraulic fracturing, honed in North American oil and gas, are being carried over to geothermal [5].

    AGS Advanced geothermalOGw Conventional oil and gas production

  4. 4 Production Soft limit

    What it gives. Geothermal has not got cheaper to build: IRENA's average installed cost rose 30%, from USD 3,083 per kW in 2010 to USD 4,015 in 2024 [15], and reached USD 5,997 for plants commissioned in 2025 [22] (each in its report's own dollars).

    The idea. Each project is capital intensive and site specific [16], so there is little repeat manufacture to learn from. NREL's moderate scenario for enhanced geothermal assumes an 18% learning rate, a fall of 18% in cost for each doubling of capacity [6][20].

    The limit. Each project is capital intensive and site specific [16], so there is little repeat manufacture to learn from, and installed costs have risen rather than fallen [15][22].

    What could unlock it. The IEA says costs of next-generation geothermal could fall by 80% by 2035 with the right support [5].

    Show the maths C = C0 × (1 - LR)n
    C
    the cost per kW now
    C0
    the cost per kW at the start
    LR
    the learning rate: the share of cost cut by each doubling of total capacity built
    n
    the number of doublings of total capacity

    In plain words. Each time the world doubles the geothermal plant it has built, builders learn and the cost drops by a fixed share. A bigger share per doubling and more doublings both mean a bigger fall. Geothermal has not yet shown this.

    Worked example. With the 18% rate NREL assumes in a scenario (assumed, not an observed value) [6], three doublings give 0.823 = 0.551, a fall of about 45% (calculated) [20].

  5. 5 Economics Soft limit Binds most today

    What it gives. Geothermal electricity cost USD 89 per MWh on the global average for plants commissioned in 2025, against USD 44 for solar PV [22].

    The idea. Since 2010 geothermal's cost has risen 53% while PV's fell 89% [22]. IRENA ties the 2025 rise largely to the financing conditions facing new, capital-intensive projects in higher-risk places [22]. India's policy names high upfront costs and exploration risks as the main challenges [16].

    The limit. Upfront cost and exploration risk: a developer pays for wells before knowing how the field will perform [16].

    What could unlock it. India's policy says the government may explore viability gap funding, loans and grants for risk mitigation and a feed-in tariff [16]; the IEA says new projects could deliver power for around USD 50 per MWh if costs fall as it expects [5].

    Show the maths CRF = r ÷ (1 - (1 + r)-n), capital cost per kWh = capex × CRF ÷ (8,760 × CF)
    CRF
    the capital recovery factor: the share of the up-front cost paid back each year
    r
    the yearly cost of capital, as a fraction
    n
    the number of years the plant earns
    capex
    the up-front cost, in US dollars per kW
    CF
    the capacity factor: the share of the year the plant runs at full power
    8,760
    the hours in a year

    In plain words. You borrow to drill the wells and build the plant, and pay it back over its life with interest. Geothermal has no fuel to buy, so this payment is most of what you pay for the power. A higher interest rate raises it a lot.

    Worked example. Capex USD 5,997 per kW and CF 85% [22]; r = 8% and n = 30 years (both assumed). CRF = 0.0888, so the charge is USD 532.7 per kW a year; the plant makes 8,760 × 0.85 = 7,446 kWh per kW, so capital costs USD 0.072 per kWh. At an assumed r = 5% it is USD 0.052 (calculated) [19]. This leaves out running costs, so it sits below IRENA's USD 0.089.

  6. 6 Resources and rules Soft limit

    What it gives. Geothermal needs hot rock within drilling reach and permission to drill [5][17].

    The idea. India's Geological Survey has mapped 381 hot springs in 10 geothermal provinces, with a theoretical prospect of nearly 10.6 GW [17], at medium to low heat, 100 to 180 °C [16]. Commercial-scale power is yet to be established; two wells of 1,000 metres at Puga pave the way for a 1 MW demonstration [17].

    The limit. Few sites and slow permits: administrative red tape can mean up to a decade to commission a new geothermal project [5].

    What could unlock it. India's National Policy on Geothermal Energy aims to make it a major renewable pillar [17]; the IEA sees as much as 800 GW cost-effective worldwide with next-generation methods [5].

    AGS Advanced geothermal

as of 2026-11-23

Sources

  1. The Future of Geothermal Energy: Executive summary International Energy Agency
  2. Annual Technology Baseline 2025: Geothermal National Laboratory of the Rockies (formerly NREL), 2025
  3. 4.7 The Carnot Efficiency (undated) Penn State, e-Education Institute (EGEE 102), 2026
  4. Carnot's Perfect Heat Engine: The Second Law of Thermodynamics Restated (College Physics 2e, section 15.4) OpenStax, 2022
  5. Efficiency of geothermal power plants: A worldwide review (Zarrouk and Moon, Geothermics, 2014), abstract as indexed by ISC Geothermics (Zarrouk and Moon), via ISC index, 2014
  6. Renewable Power Generation Costs in 2024: Summary IRENA, 2025
  7. National Policy on Geothermal Energy Ministry of New and Renewable Energy, Government of India, 2025
  8. Geothermal Energy: A New Chapter in India's Clean Energy Journey Press Information Bureau, Government of India, 2026
  9. The surface heat flux, chapter 20 of Physics of the Earth (Stacey and Davis) Cambridge University Press, 2008
  10. Simple levelized cost of energy (LCOE) calculator documentation National Laboratory of the Rockies (formerly NREL), US Department of Energy, 2026
  11. Applying endogenous learning models in energy system optimization arXiv (SINTEF Energy Research), 2021
  12. 14.5 Conduction, College Physics (OpenStax text as presented by Lumen Learning, undated) Lumen Learning (OpenStax content), 2026
  13. Renewable power generation costs in 2025 (full report; copy hosted by PNNL Tethys) IRENA, 2026