OTEC and salinity power: Resources and labour
Rivers of seawater, kilometre-long pipes and vast membrane areas
OTEC needs very large seawater flows, pipes and heat exchangers; salinity plants need enormous membrane areas and both fresh and salt water.
Natural resources
| Resource | How much | Why it is needed |
|---|---|---|
| Seawater | About 100,000 m3 an hour for a 10 MW OTEC plant1 | Each cubic metre carries little usable heat across a 20 °C gap. |
| Cold-water pipe | About 10 m diameter and 1,000 m long for 100 MW1 | Cold water must come from about 1 km down with little warming. |
| Heat exchangers | USD 200-800 per m21 | Small temperature differences need very large surfaces; they must resist corrosion and biofouling. |
| Membranes (salinity) | At least 2 million m2 for a 2 MW plant, replaced about every 5 years2 | Power per square metre is low, so area must be huge. |
| Fresh water (salinity) | Not quantified2 | River water or treated sewage provides the low-salt side; it is returned, not consumed. |
Labour
| Phase | How much | Skills | Why it is needed |
|---|---|---|---|
| Manufacturing | Not quantified12 | Heat-exchanger and membrane manufacturing | These components dominate cost. |
| Construction | Not quantified1 | Offshore pipe installation, marine engineering | A 10 MW cold-water pipe of 4-7 m diameter has not yet been demonstrated. |
| Operation | Not quantified12 | Plant operators, membrane cleaning | Biofouling must be controlled continuously. |
| Decommissioning | Not quantified1 | Marine salvage | Pipes and moorings must be recovered. |
No studies of jobs per MW were found for either technology.
Sources
- Ocean Thermal Energy Conversion: Technology Brief IRENA, 2014
- Salinity Gradient Energy: Technology Brief IRENA, 2014