Lifting crane
A boom with pulleys and a winch lifts heavy loads, multiplying human or machine force.
Building and shelter · Construction methods · No. 207
- Ancient
- Readiness 9 of 9
- Component
Greek temple builders first hoisted stones with rope and pulleys; their descendant at sea lifted 15,300 tonnes in one go in 2019.
Chart: Illustration: Lifting crane
Where it comes from
Chart: Map of where it comes from
Greek temple builders stopped dragging blocks up ramps and began hoisting them with cranes in the late sixth century BCE. Cuttings for ropes and tongs on their stones are the evidence.
Three things to know
- Egyptian pyramid builders had no machine to raise stones vertically and probably used ramps of earth or mud brick.
- Holes and grooves on the hidden faces of Greek temple blocks show where lifting ropes and tongs gripped them.
- By one modern calculation, a Roman three-pulley crane let one man at the winch raise about 150 kg.
The journey
- 1 FrameA boom, jib or pair of poles is set up over the load
- 2 RiggingA rope runs over a set of pulleys at the top and at the hook
- 3 WinchA drum turned by hand, treadwheel or motor winds in the rope
- 4 LiftEach pulley strand shares the load, so a small pull raises a heavy weight
- 5 PlaceThe boom swings or the crane moves to set the load down