Tunnelling shield: Evolution
Timeline
The milestones from first idea to today
| Year | Milestone |
|---|---|
| 1807 | A first attempt to tunnel under the Thames is stopped by quicksand after about 300 m [1] |
| 1818 | Marc Isambard Brunel patents a rectangular cast-iron tunnelling shield [1] |
| 1825 | Digging of the Thames Tunnel begins with Brunel's shield [2, 3] |
| 1843 | The Thames Tunnel opens, the first shield-driven tunnel; one million people visit in 10 weeks [1, 2] |
| 1869 | Trains start running through the Thames Tunnel, between Wapping and New Cross Gate [1] |
| 1870 | Greathead completes the Tower Subway under the Thames with a round shield of his own design [3] |
| 1886 | Greathead starts the tunnels of the City and South London Railway under the Thames [3] |
| 2022 | The central section of the Elizabeth line opens, its 42 km of tunnels dug by eight boring machines [4] |
as of 2026-11-11. Work on the Thames Tunnel stopped from 1828 to 1834 for lack of money [1]. The 300 m is calculated from 1,000 ft.
Lineage
The technologies it came from and the ones that came from it
Enables- UG Underground railway Greathead's shield dug the twin tubes of the City and South London Railway from 1886 [3], and shield-driven tubes carry deep metro lines today.
- Arc Masonry arch Brunel's tunnel was lined with twin brick arches built just behind the shield [1].
- Rly Railway (iron track network) The Thames Tunnel was taken over by the East London Railway, and trains ran through it from 1869 [1].
as of 2026-11-11
Sources
- Thames Tunnel American Society of Civil Engineers, Historic Landmarks
- What was Proclaimed the 'Eighth Wonder of the World' on Completion in 1843, but 'An Entire Failure' Just a Decade Later? Historic England
- James Henry Greathead Linda Hall Library
- Crossrail - the Elizabeth line Institution of Civil Engineers