Industrial boiler: Bill of materials
About these figures
Which unit, study and year the composition figures describe, and how they vary
No life-cycle study or environmental declaration opened gives a full bill of materials for a 10 t/h boiler. Steel is estimated at about 23,000 kg from the empty weight of a 10 t/h fire-tube boiler [28], with a low of 8,700 kg scaled from a 2012 US inventory of a 68 t/h boiler [4]. Refractory and insulation are named without amounts, and costs by part were not found. Feed pump, economiser, motor and insulation are linked nodes; burners, grates and controls are not yet nodes.
as of 2026-11-16
Components
The products inside one unit, with quantity, mass share and cost share
Variant 1 Not stated| Material | Role | Amount in one unit | Share of the unit's mass |
|---|---|---|---|
| Heat exchanger | Component | 1 | – |
| The feedwater economiser, a bank of tubes in the exhaust; makers offer one with matching efficiency gains [3][23]. Its own materials are counted in the heat exchanger node. | |||
| Mineral wool insulation | Component | Not given | – |
| The shell is insulated to hold in heat; the insulation type and amount are not stated by any source opened. | |||
| Material | Role | Amount in one unit | Share of the unit's mass |
|---|---|---|---|
| Centrifugal water pump | Component | Not given | – |
| A feed pump returns water to the boiler; count and size not found. Its materials are counted in the pump node. | |||
| Material | Role | Amount in one unit | Share of the unit's mass |
|---|---|---|---|
| Electric motor | Component | Not given | – |
| Motors drive the combustion air fan, fuel feeder and feed pumps; count not found. | |||
as of 2026-11-16
Direct materials
The commodities and chemicals in one unit as bought, with amount, mass share, cost share and recycled content
| Material | Role | Amount in one unit | Share of the unit's mass |
|---|---|---|---|
| St Steel | Structural | 23,000 kgrange from 8700 kg | – |
| Estimate. A 10 t/h three-pass fire-tube boiler, the Unical TRYPASS 10000, has an empty weight of 23,000 kg and holds 15,200 litres of water [28]; the empty weight is nearly all the steel shell, furnace and tubes, but it also includes some insulation and cladding, so the steel is a little less. The low value scales a US inventory that treats a 150,000 lb/h (68 t/h) boiler as 58,967 kg of steel plate [4] down to 10 t/h by capacity (calculated, about 8,700 kg); straight scaling understates small boilers. As a cross-check, a 10 t/h Babcock Wanson fire-tube boiler weighs 39,550 kg flooded with water [3]. Pressure parts are boiler plate and tube in grades such as P265GH and P355GH [27]. | |||
| Kao Kaolin & clays | Functional | Not given | – |
| Fireclay refractory lines the furnace of a solid-fuel boiler and the burner throat; amount not found in any source opened. | |||
Estimate · as of 2026-11-16. Steel is estimated from one maker's empty weight for a fire-tube unit; no bill of materials was found for any variant.
How it is put together
The main steps from parts and materials to the finished unit
| Step | What happens | Technology | Source |
|---|---|---|---|
| Roll and weld the pressure parts | Boiler-quality steel plate is rolled and welded into the shell or drums, and tubes are cut, bent and fitted. | Arc welding | – |
| Fit the tubes and furnace | Tubes are expanded or welded into the tube plates or headers, and a furnace tube or fireclay refractory chamber is added. | – | – |
| Test and certify the pressure vessel | The pressure parts are tested and, in India, inspected under the Boilers Act before the unit is put to use. | – | [14] |
| Add burner, grate or electrodes | A gas or oil burner, a solid-fuel grate or fluidised bed, or an electrode set is fitted, with fans and feed pumps. | Boilers, furnaces and stoves | – |
| Add the economiser | A feedwater economiser, and for gas units an optional condensing stage, is fitted in the exhaust path. | Boiler heat recovery | [3] |
| Insulate, clad and control | The shell is insulated and clad, and the controls, water-level and pressure safeguards are fitted before dispatch. | – | – |
as of 2026-11-16
Technologies used to make it
The technologies used to make it, at which step
Made with- Wld Arc welding Welding the shell, drums and tubes General practice for steel pressure vessels; no source opened gives the share of boilers welded this way.
as of 2026-11-16
Technologies inside it
The technologies inside the product, with how much of each per unit
Embodies- Blr Boilers, furnaces and stoves 1 burner and furnace set The fuel-fired variants burn fuel to make the heat; the twin technology page covers the working principle.
- Eco Boiler heat recovery 1 economiser An economiser is offered as a matched option on the boilers of Babcock Wanson and Bosch [3][23].
- EH Electric heating 1 electrode heating system Electrode The electrode variant heats water with current in place of a flame [7].
as of 2026-11-16
Sources
- BWR series fire-tube steam boilers Babcock Wanson, 2020
- NETL Life Cycle Inventory Data: Process Documentation File, Watertube or Firetube Industrial Boiler 150,000 lbs/hr Capacity, Construction US Department of Energy, National Energy Technology Laboratory, 2012
- Electrode Steam Boiler Thermon
- Bill Summary: The Boilers Bill, 2024 PRS Legislative Research, 2024
- Steam boiler systems from Bosch (brochure HC-IN/MKT_en_P-Dampf_10) Bosch Industriekessel, 2024
- Boiler and pressure vessel steel Metinvest
- Three pass steam boilers TRYPASS' (brochure) Unical (copy hosted by O&M, Greece)