Railway locomotive and coach: Footprint
Raw materials in one unit
Every commodity and chemical inside one unit, traced through its components by the site, with its emission factor and emissions
| Variant | Material | Amount (kg) | Through | Emission factor (kg CO2e per kg) | Emissions (kg CO2e) |
|---|---|---|---|---|---|
| Electric | Steel | 4738.5 | Electric motor, Transformer and power converter | 1.92 | 9097.9 |
| Electric | Aluminium | 519 | Electric motor, Transformer and power converter | 14.8 | 7681.2 |
| Electric | Copper | 414 | Electric motor | 3.965 | 1641.5 |
Worked out from data
The site's estimate
Emissions of one unit worked out by the site from its materials and energy, for the world and India, with the share of mass covered by emission factors
| Variant | Stage | Place | Emissions (kg CO2e) | Mass covered by factors |
|---|---|---|---|---|
| Electric | Making | World | 18,421 | 100% |
| Electric | Use | World | 41 million | 100% |
| Electric | Making | India | 18,421 | 100% |
| Electric | Use | India | 59.9 million | 100% |
| Passenger | Making | World | – | – |
| Passenger | Use | World | – | – |
| Passenger | Making | India | – | – |
| Passenger | Use | India | – | – |
Worked out from data
Energy in use
Energy one unit uses per year of use, by carrier
Energy in use- El Electricity 2.98 million kWh per year (calculated) · lifetime 30 years Electric locomotive 12.5 Wh per tonne-km for a 1,590 t train in Alstom's simulation between Calais and Arras, times 150,000 km a year (calculated) [12]. It assumes the whole year is run with that train, so treat it as indicative; it is the traction energy for the whole train the locomotive hauls.
as of 2026-11-16
End of life
What happens to a unit when it is thrown away: collection, reuse, recycling and disposal shares, by place
| Route | Share | Place | Year | Source |
|---|---|---|---|---|
| Recycling rate of the Prima II, calculated under ISO 22628 | 93 | World | – | [12] |
| Recovery rate of the Prima II (recycling plus energy recovery) | 95 | World | – | [12] |
| Recovery rate of a Siemens Vectron locomotive, leaving 1,700 kg of residue from 85 t | 98 | World | 2013 | [13] |
as of 2026-11-16. The Prima II declaration shows no year.
Recovered as
The commodities and chemicals recovered at end of life, with recovery rates
Recovered as- St Steel Dismantling and recycling of metals Metals are 88.24% of a Prima II's mass and the recycling rate is 93% overall; no steel-only rate was given [12].
- Cu Copper Dismantling and recycling of motors, transformer and cables No copper-only rate was given [12].
as of 2026-11-16
End of life in India
Collection and recycling in India, including the informal sector
No opened source describes the end of life of Indian locomotives, or an informal sector or extended producer responsibility rule for rolling stock. Indian Railways sells unserviceable material from yards, depots and workshops as scrap: INR 6,641.78 crore in 2024-25 against a target of INR 5,400 crore [23]. The source does not say how much of it is rolling stock.
as of 2026-11-16
Sources
- Environmental Product Declaration: Prima II Alstom
- Lokomotiven von Siemens Siemens Mobility, 2013
- Indian Railways surpasses scrap sales, reports 6,813.86 crore in FY26 Angel One, 2026