Material Insights · Understanding the Material World

Smart electricity meter: Working

What it is

The product and the job it does, in a short paragraph

A smart electricity meter measures how much electricity a home or shop uses, stores the readings and sends them to the utility over a network. It can also cut and restore supply on command [5] and run in prepaid mode [9]. This file covers direct-connected meters of class 1 and 2 under IS 16444 Part 1 [6]: single-phase and three-phase meters together form the functional unit (one direct-connected smart meter, single-phase or three-phase). Figures are for a single-phase meter, the larger part of the rollout, unless marked three-phase. Current-transformer, transformer and feeder meters are left out.

as of 2026-11-17

How it works

How it does its job, step by step in plain words

A voltage divider scales the mains voltage down, and a shunt resistor or a current transformer senses the current [31]. An analogue-to-digital converter turns both signals into numbers, and a microcontroller multiplies them to get power and adds it up over time as energy [31]. The meter stores readings, shows them on a display and exchanges them with the utility's system using the IS 15959 data protocol [6]. A communication module sends the data over a cellular link (4G or NB-IoT), a radio-frequency mesh or power-line carrier [5][11][23]. A relay can cut and restore supply from a distance [5]. A small lithium cell keeps the clock running [5][11].

as of 2026-11-17

Key specifications

The numbers that describe it, each with unit, variant, year and source

SpecValueUnitVariantYearSource
Mass of one Gemis 2 single-phase smart meter, with packaging1.604kgSingle-phase2024[1]
Mass of the Gemis 2 alone (calculated: 1.604 kg less 17.4% packaging)1.32kgSingle-phase2024[1]
Mass of one Gesis 1.5 three-phase smart meter, with packaging2.025kgThree-phase2024[2]
Accuracy class of a direct-connected smart meter (IS 16444 Part 1 covers classes 1 and 2)1.0class– – [5][6]
Basic and maximum current in an Indian single-phase tender5 to 30A (Ib 5 A, Imax 30 A)Single-phase– [5]
Highest active and apparent power of each voltage circuit, communication module idle (IS 16444 Part 1, clause 6.10.1.1; the tender repeats it)5.0 W and 15 VApower– 2015[34][5]
Typical total power of a Landis+Gyr E360 LTE single-phase meter: under 0.65 W without communication, under 1.7 W while communicating over LTE0.65 to 1.7WSingle-phase2019[35]
Useful life of a meter in an Indian tender10years– – [5]
Reference service life in the Gemis 2 and Gesis 1.5 declarations20years– 2024[1][2]

as of 2026-11-17

Variants

The variants whose make-up or footprint differs a lot, what defines each and its share of units

VariantDefining specYearSource
Single-phaseOne phase, for homes and small shops; the Gemis 2 weighs 1.604 kg with packaging and causes 120 kg CO2e over 20 years; Rs 3,252 in a Tata Power-DDL table2024[1][12]
Three-phaseThree phases (3x230/400 V), for larger loads; the Gesis 1.5 weighs 2.025 kg with packaging and causes 134 kg CO2e over 20 years; Rs 5,760 for a poly-phase smart meter in the same table2024[2][12]

as of 2026-11-17

Limits

The physical limits set by science and the engineering limits of today's design, with today's value

LimitKindLimitTodayUnitSource
Power of the voltage circuit with the communication module idle: IS 16444 ceiling against a modern LTE single-phase meter while communicatingEngineering51.7W[34][35]
Extra power allowed during data transmission, per communication module (IS 16444 ceiling)Engineering7– W[34]
Battery life: smart meter lithium batteries typically last 10 to 12 years, while the tender asks 10 years of meter life and the declarations assume 20Engineering1210years[11][5][1]

as of 2026-11-17

Science it relies on

The science principles it works by or is limited by

Relies on
  • Ohm's law A voltage divider and a shunt resistor turn mains voltage and current into small signals the converter can read [31].
  • Electromagnetic induction A current transformer, one way to sense the current, works by induction [31].
  • Radio waves The cellular or radio-frequency mesh link that carries readings to the utility uses radio waves [23].

as of 2026-11-17

Sources

  1. Environmental Product Declaration: Gemis 2 (mono-phase smart meter) EPDItaly (EPD owner Bitron Electronic China Company Ltd; meter made by Bitron Electronics for Gridspertise), 2024
  2. Environmental Product Declaration: Smart Meter multi-phase Gesis 1.5 EPDItaly (EPD owner Bitron Poland; made for Gridspertise), 2024
  3. Phase 5-30A meter GTP for TP Odisha Discoms (single-phase smart meter specification) TP Central Odisha Distribution Ltd
  4. STI for implementation of IS 16444 (Part 1):2015 (scheme of testing and inspection) Bureau of Indian Standards, 2018
  5. Lok Sabha replies of 2 April 2026 (starred question 541, unstarred question 6243) Ministry of Power, India, 2026
  6. Smart Metering Program in India: A Critical Assessment, Revision 1 (October 2023) India Smart Grid Forum (copy hosted by DirectorsTalk Interviews), 2023
  7. Average Cost of Different Types of Meters (table excluding GST; file name dated Feb 20) Tata Power Delhi Distribution
  8. Smart meters are evolving from standalone devices into core digital infrastructure: Genus Power T&D India, 2026
  9. One-Phase Shunt Electricity Meter Reference Design Using Standalone ADCs (TIDUEM7A) Texas Instruments, 2021
  10. IS 16444 (Part 1):2015 a.c. Static Direct Connected Watthour Smart Meter Class 1 and 2: Specification (full text) Bureau of Indian Standards (copy on the Internet Archive), 2015
  11. E360 Series 1 LTE 1-phase: Technical data (D000065103 b) Landis+Gyr (copy hosted by Taran Elektronik), 2019