Material Insights · Understanding the Material World

Smart electricity meter: Footprint

Raw materials in one unit

Every commodity and chemical inside one unit, traced through its components by the site, with its emission factor and emissions

VariantMaterialAmount (kg)ThroughEmission factor (kg CO2e per kg)Emissions (kg CO2e)
SingleWater32Integrated circuit (chip)– –
SingleNitrogen gas0.7Integrated circuit (chip)– –
SinglePolycarbonate0.425– – –
SingleSteel0.027– 1.920.1
SingleCopper0.001Integrated circuit (chip)3.9650
SingleEpoxy resins0.001Integrated circuit (chip)– –
SingleSilicon0Integrated circuit (chip)– –
ThreeWater32Integrated circuit (chip)– –
ThreePolycarbonate1.114– – –
ThreeNitrogen gas0.7Integrated circuit (chip)– –
ThreeSteel0.028– 1.920.1
ThreeCopper0.001Integrated circuit (chip)3.9650
ThreeEpoxy resins0.001Integrated circuit (chip)– –
ThreeSilicon0Integrated circuit (chip)– –

Worked out from data

The site's estimate

Emissions of one unit worked out by the site from its materials and energy, for the world and India, with the share of mass covered by emission factors

VariantStagePlaceEmissions (kg CO2e)Mass covered by factors
SingleMakingWorld1.160%
SingleUseWorld68.2100%
SingleMakingIndia1.660%
SingleUseIndia99.8100%
ThreeMakingWorld1.160%
ThreeUseWorld– –
ThreeMakingIndia1.670%
ThreeUseIndia– –

Worked out from data

Energy in use

Energy one unit uses per year of use, by carrier

Energy in use
  • El Electricity 14.9 kWh per year · lifetime 10 years Single-phase Calculated: annual energy = average power x 8,760 hours. A Landis+Gyr E360 LTE single-phase meter draws under 1.7 W while communicating (typical), so at most 1.7 x 8,760 / 1,000 = 14.9 kWh a year; without communication under 0.65 W, 5.7 kWh a year [35]. The IS 16444 idle ceiling of 5.0 W would be 43.8 kWh a year [34]. The 10 years are the Indian tender life [5].

as of 2026-11-17

Emissions by stage

Published life-cycle emissions of one unit in four stages (making, logistics, use, end of life), with their split, place and variant

StageValueRangeUnitShareVariantPlaceYearSource
Making20.6– kg CO2e per meter (Gemis 2, 20-year life)17.2Single-phaseNot stated2024EPD Table 4, manufacturing stage [1]; share calculated
Logistics1.635– kg CO2e per meter (Gemis 2, 20-year life)1.4Single-phaseNot stated2024Distribution 1.24 plus installation 0.395, added (calculated) [1]
Use94.9– kg CO2e per meter (Gemis 2, 20-year life)79.1Single-phaseNot stated2024EPD Table 4, use and maintenance stage; share calculated [1]
End of life3– kg CO2e per meter (Gemis 2, 20-year life)2.5Single-phaseNot stated2024EPD Table 4, end of life stage; share calculated [1]
Making23.6– kg CO2e per meter (Gesis 1.5, 20-year life)17.6Three-phaseNot stated2024EPD manufacturing stage [2]; share calculated
Logistics1.567– kg CO2e per meter (Gesis 1.5, 20-year life)1.2Three-phaseNot stated2024Distribution 0.775 plus installation 0.792, added (calculated) [2]
Use106– kg CO2e per meter (Gesis 1.5, 20-year life)79.1Three-phaseNot stated2024EPD use and maintenance stage; share calculated [2]
End of life3.24– kg CO2e per meter (Gesis 1.5, 20-year life)2.4Three-phaseNot stated2024EPD end of life stage; share calculated [2]
Use10038 to 293 kg CO2e per meter over 10 years (calculated: 1.7 W x 8,760 h = 14.9 kWh a year, x 10 years x 0.670 kg CO2e per kWh; low 0.65 W, high the 5.0 W IS 16444 ceiling)kg CO2e per meter over 10 years (calculated: 1.7 W x 8,760 h = 14.9 kWh a year, x 10 years x 0.670 kg CO2e per kWh; low 0.65 W, high the 5.0 W IS 16444 ceiling)– Single-phaseIndia2025Calculated from the E360 LTE data sheet [35], IS 16444 [34], the Indian tender life [5] and Ember's 2025 Indian grid intensity [32]

as of 2026-11-17. The Gemis 2 total is 120 kg CO2e and the Gesis 1.5 total 134 kg CO2e over 20 years, with installation counted in the logistics rows. The declarations work out use-stage energy as power x 8,760 x service life but do not state the power or the electricity mix [1][2]. The India row is a use-stage estimate only, so it has no stage shares.

End of life

What happens to a unit when it is thrown away: collection, reuse, recycling and disposal shares, by place

RouteSharePlaceYearSource
Recycling target for electrical and electronic equipment under India's E-Waste Rules, 2025-26 (coverage of meters not confirmed)70India2025[16]

as of 2026-11-17

End of life in India

Collection and recycling in India, including the informal sector

The Gemis 2 declaration models recycling and disposal of the meter but gives no recovery rates [1]. India's E-Waste (Management) Rules, 2022 apply from 1 April 2023, with recycling targets rising from 60% to 80% by 2027-28 [16]; the sources opened do not say whether electricity meters are listed. A 2023 white paper says old meters should be recycled or treated like other electronic waste [11]. No Indian collection figure for retired meters was found.

as of 2026-11-17

Water and waste

Water use and waste per unit where a source gives them

MeasureValueUnitStageYearSource
Water use over the life of one Gemis 2 single-phase meter, all stages61.7m3 water-equivalentAll stages2024[1]
Water use in manufacturing (Gemis 2)7.06m3 water-equivalentManufacturing2024[1]
Non-hazardous waste, all stages (Gemis 2)39.9kgAll stages2024[1]
Non-hazardous waste in manufacturing (Gemis 2)23.9kgManufacturing2024[1]
Hazardous waste, all stages (Gemis 2)3.09kgAll stages2024[1]
Hazardous waste in manufacturing (Gemis 2)1.57kgManufacturing2024[1]

as of 2026-11-17

Sources

  1. Environmental Product Declaration: Gemis 2 (mono-phase smart meter) EPDItaly (EPD owner Bitron Electronic China Company Ltd; meter made by Bitron Electronics for Gridspertise), 2024
  2. Environmental Product Declaration: Smart Meter multi-phase Gesis 1.5 EPDItaly (EPD owner Bitron Poland; made for Gridspertise), 2024
  3. Phase 5-30A meter GTP for TP Odisha Discoms (single-phase smart meter specification) TP Central Odisha Distribution Ltd
  4. Smart Metering Program in India: A Critical Assessment, Revision 1 (October 2023) India Smart Grid Forum (copy hosted by DirectorsTalk Interviews), 2023
  5. E-Waste EPR in India Greensutra, 2026
  6. Global Electricity Review 2026: major countries and regions Ember, 2026
  7. IS 16444 (Part 1):2015 a.c. Static Direct Connected Watthour Smart Meter Class 1 and 2: Specification (full text) Bureau of Indian Standards (copy on the Internet Archive), 2015
  8. E360 Series 1 LTE 1-phase: Technical data (D000065103 b) Landis+Gyr (copy hosted by Taran Elektronik), 2019