Direct lithium extraction: Materials
Materials it needs
The commodities and chemicals it needs per unit, its share of each one's demand and how critical each is
Processes- Li Lithium criticality high The target metal; batteries take 88% of world lithium use in the USGS estimate published in 2026 [3].
- H₂O Water criticality medium Ponds evaporate nearly 2 million litres of local water, and Livent's approach uses less land and water [1]; DLE still needs wash water to release lithium from the sorbent [1].
- Al Aluminium criticality low Livent and Sunresin use their own aluminium sorbents [1].
as of 2026-11-12. No source gives the amount of sorbent or water per tonne of lithium, so no amounts are given. Criticality is the writer's judgement.
Critical materials
The materials whose supply could hold it back
- Lithium itself: 88% of world use is in batteries (USGS estimate published in 2026), so battery demand sets the pull on supply [3].
- Sorbent and process know-how: Livent, Sunresin and Eramet each use their own sorbents or in-house technology [1][2], so access to a proven process is a limit for newcomers.
as of 2026-11-12
Sources
- Could Direct Lithium Extraction Be a Game-Changer? IEEE Spectrum (Prachi Patel, 31 October 2023), 2023
- Eramet inaugurates its direct lithium extraction plant in Argentina, becoming the first European company to produce battery-grade lithium carbonate at industrial scale Eramet, 2024
- Mineral Commodity Summaries 2026: Lithium US Geological Survey, 2026