The job the technology does for people, in a short paragraph

Direct lithium extraction takes lithium out of brine without evaporation ponds. Ponds take 12 to 18 months and leave waste, while DLE takes hours [1]. Livent deployed it commercially in 1998 [1], and Eramet inaugurated an industrial plant in Argentina in 2024 [2]. It is still a small part of world supply, so it remains an emerging technology.

as of 2026-11-12

How it works

The working principle in plain words, step by step

Brine from a salt flat, a geothermal well or an oilfield holds lithium among much more sodium, potassium and other salts. A DLE plant pumps the brine through a material that picks out lithium and ignores most of the rest. In the most common version, adsorption, the brine flows through columns packed with a sorbent, often based on aluminium [1]. In ion exchange, beads take up lithium and give up a hydrogen ion in exchange [1]. Membranes can also separate lithium, and solvent extraction is another route; a 2024 review counts adsorption and chemical precipitation as the commercial technologies [4]. Once the sorbent is loaded, the lithium is washed off with warm water or flushed out with dilute acid [1]. The result is a clean, concentrated lithium solution that is turned into lithium carbonate. The leftover brine can then be sent back.

as of 2026-11-12

Key figures

The handful of numbers that size it up, each with its unit, year and source

FigureValueUnitYearSource
Time taken by evaporation ponds18months (upper end of 12 to 18)2023[1]
Lithium recovery achieved by Eramet's DLE pilot at Centenario90%2024[2]
Centenario phase 1 design capacity at full output, battery-grade lithium carbonate24,000t/year2024[2]
Share of world lithium use going into batteries (USGS estimate)88%2026[3]
World lithium mine production (estimate)290,000t of lithium content2025[3]

as of 2026-11-12. The recovery rate is the company's own figure from five years of pilot tests [2]. Ponds recover 40 to 65 percent, against over 90 percent for one developer's sorbent, in a 2023 trade-press report [1]; those figures are not independently tested. The USGS gives no year for the 88% end-use estimate; 2026 is the publication year of its summary [3].

Where it is used

The main places and products the technology is found in

  • Salt-lake brines in Argentina, as at Eramet's Centenario plant in Salta Province [2]
  • Chinese commercial projects using Sunresin's technology [1]
  • Geothermal brines, which a 2024 review sees as a promising source [4]

as of 2026-11-12

Scale today

How much of it there is now: units in use, made each year and who uses it

Installed
Eramet's Centenario phase 1 plant, designed for 24,000 t/year of battery-grade lithium carbonate, plus a handful of commercial projects in China
Made per year
No world DLE output figure was found
Users
Lithium producers selling to battery makers
Unit
t/year battery-grade lithium carbonate
Year
2024
Note
Eramet planned production to start in November 2024, with a ramp-up expected by mid-2025 [2]. Total world lithium mine output was about 290,000 t of lithium content in 2025 (estimate) [3].

as of 2026-11-12

Sources

  1. Could Direct Lithium Extraction Be a Game-Changer? IEEE Spectrum (Prachi Patel, 31 October 2023), 2023
  2. Eramet inaugurates its direct lithium extraction plant in Argentina, becoming the first European company to produce battery-grade lithium carbonate at industrial scale Eramet, 2024
  3. Mineral Commodity Summaries 2026: Lithium US Geological Survey, 2026
  4. Challenges and opportunities of recovering lithium from seawater, produced water, geothermal brines, and salt lakes using conventional and emerging technologies Chemical Engineering Journal, vol. 498, article 155349 (Nikkhah et al.), 2024