OTEC and salinity power: Levers
Held back most by
Engineering
Physics sets a ceiling of about 7% for turning ocean heat into work and pumping eats 20 to 30% of the output [2], but the larger problem is that nothing above 1 MW has been built, and IRENA calls the first megawatt-scale plants the key requirement for deployment [2]. India's first plant, being built at Kavaratti, is designed for 60 kW [12]. Proving a working plant at scale would change the most.
The six layers
Mathematics, science, engineering, production, economics, and resources and rules: what each gives, the idea in plain words, the limit (hard or soft) and how close today is, what could unlock it, and the maths behind it
Six layers make a technology possible, from the mathematics underneath to the resources and rules it needs at world scale. A hard limit comes from mathematics or nature and can only be sidestepped; a soft limit moves with effort, scale, money or policy.
- 1 Mathematics Hard limit
Mathematics is the language of its physics
What it gives. Simple heat bookkeeping tells a designer how much seawater a plant must move for each megawatt [10].
The idea. A physical law, warm water giving up heat to a cold sink, makes the plant work and mathematics writes it down, so the role is language. A 100 MW plant needs about 750 tonnes of seawater every second [2].
The limit. The heat carried by water equals its mass times its specific heat times the temperature change, and with only about 20 degrees between warm and cold water [2] every megawatt needs a very large flow [10].
What could unlock it. The equation shows where to push: a larger usable temperature gap, which means the warmest surface water and the deepest cold water, or heat exchangers that waste less of the gap (our judgement).
Show the maths
Q = m × c × ΔT- Q
- the heat moved, in joules
- m
- the mass of water that moves, in kilograms
- c
- the heat one kilogram of water holds for each degree: 4,186 joules per kilogram per °C
- ΔT
- how many degrees the water warms or cools
In plain words. Water holds a lot of heat, but each kilogram gives up only a little when it cools by a few degrees. To get a big amount of heat you need a lot of water. The smaller the temperature gap, the more water you must pump, and pumping costs power.
Worked example. A plant making 1 MW at the best possible 7% [2] must take in 1 ÷ 0.07 = 14.3 MJ of heat every second (calculated). If the warm water cools by 3 °C (assumed), the flow is 14,300,000 ÷ (4,186 × 3) = about 1,140 kg a second, roughly 1.1 cubic metres, taking 1,000 kg to the cubic metre (assumed, specific heat from [10]). A real plant is below 7% and needs more (calculated).
- 2 Science Hard limit
What it gives. Thermodynamics: any heat engine works between a warm side and a cold side, and a closed ammonia loop runs on warm surface water and cold water from 800 to 1,000 metres down [2].
The idea. Carnot showed that the best share of heat any engine can turn into work depends only on the two temperatures [9]. With a gap of only about 20 degrees the ceiling is about 7% [2]. The fuel is free and the plant can run day and night, with a capacity factor of 90 to 95% [2].
The limit. Carnot limit: efficiency can never exceed 1 minus the cold temperature divided by the hot temperature, at most about 7% for ocean water [2][9].
What could unlock it. Only a bigger temperature gap lifts the ceiling: the warmest tropical surface water against the deepest cold water. Salinity power avoids the limit by using a different gradient, salt against fresh water, through membranes [4].
Show the maths
ηmax = 1 - Tc ÷ Th- ηmax
- the largest share of the heat that can become work, as a fraction
- Tc
- the cold water temperature, in kelvin (add 273 to °C)
- Th
- the warm water temperature, in kelvin
In plain words. An engine needs heat to flow from hot to cold, and it can only skim off a part of that flow. The smaller the gap between hot and cold, the smaller the part. The sea surface and the deep sea are only about 20 degrees apart, so most of the heat must pass through unused.
Worked example. IRENA's surface water at about 25 °C (298 K) and deep water at about 4 °C (277 K) [2] give 1 - 277 ÷ 298 = 0.070, about 7% (calculated), the same as IRENA's maximum [2][9].
- 3 Engineering Soft limit Binds most today
What it gives. A closed ammonia loop, heat exchangers and a cold-water pipe, about 10 metres wide and 1,000 metres long for a 100 MW plant [2].
The idea. Pumping the water takes 20 to 30% of the power made [2]. The flow for a 10 MW plant is 100,000 cubic metres an hour [2]. So far only plants up to 1 MW have been built, and the largest ran in Hawaii from 1993 to 1998 [2].
The limit. Size and survival: nothing larger than 1 MW has been proved, and a pipe 1,000 metres long must stand in ocean currents and storms [2].
What could unlock it. IRENA says the key requirement is to have the first megawatt-scale plants built [2]. India is establishing a 60 kW plant at Kavaratti that also makes drinking water [12].
- 4 Production Soft limit
What it gives. Each plant so far is a one-off marine structure, with no production line behind it [2].
The idea. IRENA lists the lack of experience building OTEC plants at scale as a main barrier [2]. Without repeated builds there is no volume from which cost can fall.
The limit. A custom pipe and hull for every plant means cost cannot fall with repetition until several plants are built (our judgement, from IRENA's lack of experience at scale [2]).
What could unlock it. A first series of megawatt-scale plants would start the learning [2].
- 5 Economics Soft limit
What it gives. IRENA put OTEC power at about 0.07 to 0.19 US dollars a kilowatt-hour, with larger plants costing 5,000 to 15,000 US dollars (2010) a kilowatt [2].
The idea. The fuel is free and the plant earns for 90 to 95% of the year [2], so nearly all the cost is capital. Salinity power has a similar problem: membranes make up 50 to 80% of its capital cost [4].
The limit. High up-front capital cost and no experience building at scale [2].
What could unlock it. IRENA says suitable finance options need to be developed to cover the up-front costs [2]. Pairing power with desalination, as at Kavaratti, gives a second product [12].
Show the maths
CRF = r ÷ (1 - (1 + r)-n), capital cost per MWh = capex × CRF ÷ (8.76 × CF)- CRF
- the capital recovery factor: the share of the up-front cost paid back each year
- r
- the yearly cost of capital, as a fraction
- n
- the years the plant earns
- capex
- the up-front cost in dollars for each kilowatt
- CF
- the capacity factor: the share of the year the plant is effectively at full power
- 8.76
- the thousands of hours in a year, so that the answer is in dollars per megawatt-hour
In plain words. You pay back the cost of building over the life of the plant, with interest. When the fuel is free, that payment is almost the whole price of each unit. A higher interest rate makes every unit dearer.
Worked example. Take the low end of IRENA's larger-plant cost, 5,000 dollars (2010) a kilowatt, and a capacity factor of 92.5%, the middle of 90 to 95% [2]. Assume 25 years. At an assumed 10% the CRF is 0.1102 and the capital charge is 5,000 × 0.1102 ÷ (8.76 × 0.925) = about 68 dollars per MWh; at an assumed 5% it is about 44 (calculated) [11].
- 6 Resources and rules Soft limit
What it gives. OTEC needs deep cold water close to a warm coast, and permission to build in it: at least 98 nations and territories have access to OTEC thermal resources, including the Indian coast [2].
The idea. The resource is huge, up to 30 TW in total [2], and uses no land. But the largest plant built is 1 MW [2] and India's first, now being built, is designed for 60 kW [12], so the scale of the resource is far from the scale of the technology.
The limit. Only tropical coasts and islands with deep water close to shore have the temperature gap [2], and each plant needs sea-use permission (our judgement).
What could unlock it. Island sites such as Lakshadweep can use the cold water for both power and drinking water, which makes a small plant worth building [12].
as of 2026-11-23
Sources
- Ocean Thermal Energy Conversion: Technology Brief IRENA, 2014
- Salinity Gradient Energy: Technology Brief IRENA, 2014
- The Carnot Cycle (University Physics Volume 2, section 4.5) OpenStax, 2016
- Heat Transfer, Specific Heat, and Calorimetry (University Physics Volume 2, section 1.4) OpenStax, 2016
- Simple levelized cost of energy (LCOE) calculator documentation National Laboratory of the Rockies (formerly NREL), US Department of Energy, 2026
- Union Minister Dr Jitendra Singh says first-of-its-kind integrated plant is being established in Kavaratti island of Lakshadweep All India Radio News (Prasar Bharati), 2026