Electric arc furnace: Levers
Held back most by
Resources and rules
The furnace is cheap to build and typical US furnaces used about 1.6 times the thermodynamic minimum energy in 2010 (calculated) [17], but India's scrap demand reached 41 MMT in FY25 against domestic generation of 32 MMT [11], and the target is scrap at 50% of the charge mix by 2047 [11]. Supply of scrap, and of clean steady power, decides how far arc furnaces can grow.
The six layers
Mathematics, science, engineering, production, economics, and resources and rules: what each gives, the idea in plain words, the limit (hard or soft) and how close today is, what could unlock it, and the maths behind it
Six layers make a technology possible, from the mathematics underneath to the resources and rules it needs at world scale. A hard limit comes from mathematics or nature and can only be sidestepped; a soft limit moves with effort, scale, money or policy.
- 1 Mathematics Hard limit
Mathematics is the language of its physics
What it gives. Joule's law says how much heat a current makes in a resistance, which lets designers size the electrodes, transformer and power of a furnace [7].
The idea. A physical law makes the furnace work and mathematics only describes it, so the role is language. The heat made each second equals the current squared times the resistance [7], so doubling the current gives four times the heat (calculated).
The limit. Energy is conserved: the arcs give out at most the electrical energy put in, and part of the heat is lost before it reaches the steel [7][10].
What could unlock it. Recovering the heat that leaves in flue gas (15 to 20%) and cooling water (8 to 14%) returns part of what is lost [10].
CDQ Steel plant energy recovery
Show the maths
P = I2 × R- P
- the heat made each second, in watts
- I
- the current through the arc and the charge, in amps
- R
- the electrical resistance of the arc and the charge, in ohms
In plain words. When a current is pushed through something that resists it, the effort turns into heat. Double the current and the heat grows four times, not two. That is why furnaces use enormous currents to melt tonnes of scrap in under an hour.
Worked example. Assume a current of 40,000 amps through a resistance of 5 milliohms (both assumptions): P = 40,000² × 0.005 = 8 million watts. Doubling the current to 80,000 amps gives 32 million watts, four times as much (calculated) [7].
- 2 Science Hard limit
What it gives. The heat needed to warm and melt scrap is a fixed amount set by the steel itself, whatever furnace does the job [9][17].
The idea. A US Department of Energy study puts the thermodynamic minimum for arc furnace steel at 1.33 GJ per tonne of liquid steel, the heat to warm and melt pure scrap, about 369 kWh (calculated) [17]. Typical US furnaces used 2.16 GJ a tonne in 2010, fuel and electricity together, and the state of the art about 1.9 GJ [17].
The limit. First-law minimum: at least 1.33 GJ of heat for each tonne of liquid steel melted from pure scrap [17], matching the 1,327 MJ an earlier DOE study found [9].
Energy to make a tonne of liquid steel from scrap
Today (2010): 2.16 GJ/t · Floor: 1.33 GJ/t · today is 1.6 times the floor
Today is the typical final energy use of US arc furnaces in 2010, fuel and electricity together, per tonne of liquid steel; the state of the art was about 1.9 GJ [17]. The limit is the same study's thermodynamic minimum for pure scrap, on the same basis [17].
What could unlock it. Only the feed sidesteps it: the earlier study found that increasing scrap melting has the largest impact on energy consumption, while steel from ore needs at least 8,620 MJ per tonne [9].
Show the maths
Emin = ∫ Cp dT + L- Emin
- the least heat needed for one tonne of steel, in megajoules
- Cp
- the heat needed to warm the steel by one kelvin, in megajoules per tonne per kelvin
- T
- the temperature, in kelvin, rising from room temperature to the melting point
- L
- the heat needed to melt the steel, in megajoules per tonne
In plain words. To melt steel you must first warm it to its melting point, then give it more heat to turn it from solid to liquid. Add those two bills together and you have a minimum that no furnace can beat. A real furnace also heats the metal a little more so it can be poured, and loses heat on the way.
Worked example. 1.33 GJ = 1,330 MJ, and 1,330 ÷ 3.6 = 369 kWh a tonne (calculated) [17]. For a heat of 100 tonnes (assumption), that is at least 36.9 MWh; if the arcs put an assumed 60 MW into the steel, melting takes at least 37 minutes (calculated).
- 3 Engineering Soft limit
What it gives. Graphite electrodes carry the current into the scrap, and electricity gives 50 to 70% of the energy when the charge is all scrap; coal and natural gas give the rest [4].
The idea. A well run furnace should use 400 to 500 kWh of electricity a tonne, and 350 kWh has been reached on 100% scrap, but impurities in the charge and process conditions can lift use to about 650 kWh [10]. TERI audits of small and medium Indian furnaces found 415 to 675 kWh (TERI database, 2017) [10].
The limit. Heat losses and charge quality keep real furnaces above the minimum; flue gas and cooling water carry the major losses [10]. These electricity figures cannot be set against the 1.33 GJ minimum, because fuel and chemical heat supply the rest of the energy [4][17].
What could unlock it. Capturing the heat lost to flue gas (15 to 20%) and cooling water (8 to 14%), about a quarter to a third together (calculated), and cleaner scrap [10].
- 4 Production Soft limit
What it gives. An arc furnace melt shop is cheap to build: about USD 143 per tonne of yearly capacity, from a sample of three plants averaging 1,170 kt a year, with costs labelled 2018 [14].
The idea. Small plants cost more per tonne, closer to USD 300 for a melt shop of about 300 kt a year [14]. The graphite electrodes are a consumable with a fragile supply chain: in 2017 their price surged by 1500% to $40,000/t at the peak [15].
The limit. Electrode supply: CRU puts the 2017 spike down mainly to the closure of electrode and needle coke plants, which limited supply [15].
What could unlock it. Spot prices had slumped to $11,000 for ultra-high-power grade electrodes by early September 2018 [15].
- 5 Economics Soft limit
What it gives. An arc furnace costs little to build per tonne, so cost of capital matters less here than for most steel plants (calculated below) [14].
The idea. Larger Indian steel firms borrow at about 8% and have equity at 16%, on a 70:30 split [12]. At 8% over an assumed 25 years, the capital charge on a USD 143 plant is about USD 13 a tonne a year (calculated) [13][14].
The limit. Cheaper rivals and input prices: in India, induction furnaces currently use 21 MMT of ferrous scrap and arc furnaces 7.5 MMT [11].
What could unlock it. Concessional debt at 6% and equity at 14% [12] would trim the capital charge, but with capital a small share the larger lever is the price of steady power (calculated) [12].
Show the maths
CRF = r ÷ (1 - (1 + r)-n), annual capital charge = capex × CRF- CRF
- the capital recovery factor: the share of the up-front cost paid back each year
- r
- the yearly cost of capital, as a fraction
- n
- the number of years the plant earns
- capex
- the up-front cost of the plant per tonne of yearly capacity, in US dollars
In plain words. You pay for the furnace up front and repay it over its life with interest. The yearly payment is the cost multiplied by this factor. A furnace is cheap, so even at a high interest rate the yearly payment per tonne of steel is small next to the electricity.
Worked example. Capex USD 143 per tonne of yearly capacity (2018) [14]; r = 8% [12]; n = 25 years (assumption). CRF = 0.0937, so USD 13.4 per tonne a year. Electricity for 0.45 MWh a tonne (the middle of 400 to 500 kWh [10]) at an assumed USD 60 a MWh is USD 27 a tonne, about twice the capital charge (calculated) [13].
- 6 Resources and rules Soft limit Binds most today
What it gives. An arc furnace needs a steady supply of scrap or direct reduced iron, grid power and electrodes.
The idea. India's domestic scrap generation rose from 19 MMT in FY22 to 32 MMT in FY25, while scrap demand rose from 24 MMT to 41 MMT [11]. The target is a 50% ferrous scrap share in the charge mix for steelmaking by 2047 [11].
The limit. Scrap supply: EY names the limited availability of high-quality scrap among India's current constraints [11].
What could unlock it. The Steel Scrap Recycling Policy seeks to promote a circular economy in the sector [11], and a furnace can also run on 70% direct reduced iron with 30% scrap [4].
DRI Direct reduction of ironH2D Hydrogen direct reduction (green steel)
Show the maths
S = Q × s- S
- the scrap needed each year, in million tonnes
- Q
- the crude steel made each year, in million tonnes
- s
- the share of the charge mix that is scrap, as a fraction
In plain words. The more steel a country makes and the more of it comes from scrap, the more scrap it needs. Scrap only appears when old steel products reach the end of their life, so supply cannot be switched on like a factory.
Worked example. Q = 164.9 million tonnes (India's 2025 crude steel [16]) × s = 50% (the target share [11]) = about 82 million tonnes of scrap a year, against 32 MMT generated in FY25 [11] (calculated; it ignores yield losses and growth, and compares calendar and financial years).
as of 2026-11-23
Sources
- Energy use in the steel industry (fact sheet) World Steel Association, 2025
- Joule heating Encyclopaedia Britannica
- Theoretical Minimum Energies to Produce Steel for Selected Conditions (Fruehan, Fortini, Paxton and Brindle, Carnegie Mellon University) US Department of Energy, Office of Industrial Technologies, 2000
- Energy Efficiency options in Electric Arc Furnaces: Best Practices and Technologies TERI, 2025
- Closing the loop: scrap markets to power India's green steel transition EY India, 2026
- Green Steel by 2030: Building the business case for the first green steel plant in India TERI, 2026
- Simple levelized cost of energy (LCOE) calculator documentation National Laboratory of the Rockies (formerly NREL), US Department of Energy, 2026
- Capital investment for an electric arc furnace steel plant (undated page; year of access, costs labelled 2018) Steel on the Net, 2026
- Graphite electrodes: panic over or worse to come? (page undated; text reports prices as of early September 2018) CRU Group, 2018
- An Overview of Steel Sector, June 2026 Ministry of Steel, Government of India, 2026
- Bandwidth Study on Energy Use and Potential Energy Savings Opportunities in U.S. Iron and Steel Manufacturing (report undated; posted by DOE in August 2015, data for 2010) US Department of Energy, Advanced Manufacturing Office (prepared by Energetics), 2015