Transformer and power converter: Footprint
Raw materials in one unit
Every commodity and chemical inside one unit, traced through its components by the site, with its emission factor and emissions
| Variant | Material | Amount (kg) | Emission factor (kg CO2e per kg) | Emissions (kg CO2e) |
|---|---|---|---|---|
| Distribution | Steel | 1102.5 | 1.92 | 2116.8 |
| Distribution | Aluminium | 405 | 14.8 | 5994 |
| Power | Steel | 41,972.04 | 1.92 | 80,586.3 |
| Power | Copper | 8280.15 | 3.965 | 32,830.8 |
| Inverter | Aluminium | 52.3 | 14.8 | 774 |
| Inverter | Steel | 21.4 | 1.92 | 41.1 |
| Inverter | Copper | 19.8 | 3.965 | 78.5 |
Worked out from data
The site's estimate
Emissions of one unit worked out by the site from its materials and energy, for the world and India, with the share of mass covered by emission factors
| Variant | Stage | Place | Emissions (kg CO2e) | Mass covered by factors |
|---|---|---|---|---|
| Distribution | Making | World | 8111 | 100% |
| Distribution | Use | World | 277,960 | 100% |
| Distribution | Making | India | 8111 | 100% |
| Distribution | Use | India | 406,623 | 100% |
| Power | Making | World | 1.4 million | 100% |
| Power | Use | World | 13.3 million | 100% |
| Power | Making | India | 1.99 million | 100% |
| Power | Use | India | 19.5 million | 100% |
| Inverter | Making | World | 894 | 100% |
| Inverter | Use | World | 97,194 | 100% |
| Inverter | Making | India | 894 | 100% |
| Inverter | Use | India | 142,184 | 100% |
Worked out from data
Energy to make it
Energy used to make one unit, by carrier and stage
Energy to make- El Electricity 10 million MJ · Manufacturing Power transformer (40 MVA, oil-immersed) 2,790,000 kWh of electricity to make an ABB 40 MVA unit, converted at 3.6 MJ per kWh (calculated); an old 2003 declaration for a different unit from the Matelec reference [4].
- Ht Heat 170,640 MJ · Manufacturing Power transformer (40 MVA, oil-immersed) 47,400 kWh of heat, converted at 3.6 MJ per kWh (calculated) [4].
as of 2026-11-13
Energy in use
Energy one unit uses per year of use, by carrier
Energy in use- El Electricity 17,340 kWh per year · lifetime 35 years Distribution transformer (400 kVA, oil-immersed) Electricity lost as heat. Calculated from the declared losses at 70% load: (3.25 kW x 0.7 squared + 0.387 kW) x 8,760 hours [2].
- El Electricity 832,286 kWh per year · lifetime 35 years Power transformer (40 MVA, oil-immersed) Electricity lost as heat: 29,129,995 kWh over 35 years divided by 35 (calculated); load loss 158.473 kW, no-load loss 17.358 kW, load factor 0.7 [3].
- El Electricity 8488.6 kWh per year · lifetime 25 years Inverter (352 kW solar string) Electricity lost as heat and in standby: E_use 211,200 kWh plus E_standby 1,014 kWh over the 25-year service life, divided by 25 (calculated); E_use is 352 kW x 2,000 sunshine hours x 25 years x 1.2% loss [5].
as of 2026-11-13. Each row is the electricity lost by one unit, from its declaration's own loss model.
Emissions by stage
Published life-cycle emissions of one unit in four stages (making, logistics, use, end of life), with their split, place and variant
| Stage | Value | Unit | Share | Variant | Place | Year | Source |
|---|---|---|---|---|---|---|---|
| Making | 5060 | kg CO2e per transformer | 2 | Distribution transformer (400 kVA, oil-immersed) | India (made) | 2026 | Vijai declaration [2]: manufacturing 5.06E+03 |
| Logistics | 457 | kg CO2e per transformer | 0.2 | Distribution transformer (400 kVA, oil-immersed) | India (made) | 2026 | Calculated from [2]: distribution 57.4 plus installation 400 |
| Use | 243,000 | kg CO2e per transformer | 97.4 | Distribution transformer (400 kVA, oil-immersed) | India (made) | 2026 | Vijai declaration [2]: use and maintenance 2.43E+05, 35 years |
| End of life | 1010 | kg CO2e per transformer | 0.4 | Distribution transformer (400 kVA, oil-immersed) | India (made) | 2026 | Vijai declaration [2]: end of life 1.01E+03 |
| Making | 6469 | kg CO2e per transformer | 2.2 | Distribution transformer (400 kVA, oil-immersed) | Hungary (made); grid mix not named | 2025 | Calculated from [1]: upstream 6.34E+03 plus core 1.29E+02 (unit 9141275628, 1,672 kg) |
| Logistics | 153 | kg CO2e per transformer | 0.1 | Distribution transformer (400 kVA, oil-immersed) | Hungary (made); grid mix not named | 2025 | Calculated from [1]: distribution 1.53E+02 plus installation 1.90E-01 |
| Use | 282,000 | kg CO2e per transformer | 97.6 | Distribution transformer (400 kVA, oil-immersed) | Hungary (made); grid mix not named | 2025 | [1]: use 2.82E+05 over 35 years |
| End of life | 198 | kg CO2e per transformer | 0.1 | Distribution transformer (400 kVA, oil-immersed) | Hungary (made); grid mix not named | 2025 | [1]: end of life 1.98E+02 |
| Making | 258,000 | kg CO2e per transformer | 2.3 | Power transformer (40 MVA, oil-immersed) | Lebanon (made); Italian grid mix in use | 2025 | Matelec declaration [3]: manufacturing stage 2.58E+05 |
| Logistics | 14,460 | kg CO2e per transformer | 0.1 | Power transformer (40 MVA, oil-immersed) | Lebanon (made); Italian grid mix in use | 2025 | Calculated from [3]: distribution 3.96E+03 plus installation 1.05E+04 |
| Use | 11.1 million | kg CO2e per transformer | 96.8 | Power transformer (40 MVA, oil-immersed) | Lebanon (made); Italian grid mix in use | 2025 | Matelec declaration [3]: use stage 1.11E+07, 35 years |
| End of life | 92,500 | kg CO2e per transformer | 0.8 | Power transformer (40 MVA, oil-immersed) | Lebanon (made); Italian grid mix in use | 2025 | Matelec declaration [3]: end of life including deinstallation 9.25E+04 |
| Making | 4260 | kg CO2e per inverter | 21.5 | Inverter (352 kW solar string) | China (made); use modelled with PV and Italian grid electricity | 2023 | Sungrow declaration [5]: SG350HX manufacturing 4.26E+03 |
| Logistics | 58 | kg CO2e per inverter | 0.3 | Inverter (352 kW solar string) | China (made); use modelled with PV and Italian grid electricity | 2023 | Calculated from [5]: distribution 28.5 plus installation 29.5 |
| Use | 15,500 | kg CO2e per inverter | 78.1 | Inverter (352 kW solar string) | China (made); use modelled with PV and Italian grid electricity | 2023 | Sungrow declaration [5]: use and maintenance 1.55E+04, 25 years |
| End of life | 33.3 | kg CO2e per inverter | 0.2 | Inverter (352 kW solar string) | China (made); use modelled with PV and Italian grid electricity | 2023 | Sungrow declaration [5]: end of life 3.33E+01 |
as of 2026-11-13. Shares are of the sum of the four stages (calculated). The declarations name their columns upstream, core or manufacturing, distribution, installation, use and maintenance, and end of life; making is upstream plus core (or manufacturing) and logistics is distribution plus installation, a mapping made by the site. Each use stage is the emissions of the electricity lost over the service life, with the declaration's own electricity: Italian grid for the Matelec unit [3], photovoltaic power for the inverter's load losses and Italian grid for its standby [5].
End of life
What happens to a unit when it is thrown away: collection, reuse, recycling and disposal shares, by place
| Route | Share | Place | Year | Source |
|---|---|---|---|---|
| Recycling of steel and copper (EPD scenario for the 40 MVA transformer; share of mass, calculated) | 70.2 | Lebanon (maker) | 2025 | [3] |
| Incineration of oil, wood and insulation, and paint (EPD scenario for the 40 MVA transformer; share of mass, calculated; 'other' materials, 0.7%, have no treatment listed) | 29.1 | Lebanon (maker) | 2025 | [3] |
| Recycling of metals in the inverter (EPD scenario) | 90 | China (maker) | 2023 | [5] |
| Landfill of metals in the inverter (EPD scenario) | 10 | China (maker) | 2023 | [5] |
| Recycling of plastics in the inverter (EPD scenario) | 60 | China (maker) | 2023 | [5] |
| Incineration of plastics in the inverter (EPD scenario) | 40 | China (maker) | 2023 | [5] |
as of 2026-11-13
Recovered as
The commodities and chemicals recovered at end of life, with recovery rates
Recovered as- St Steel 100% recovered · Recycling Assumed in the 40 MVA declaration (42,979 kg of steel recycled) [3]; the inverter declaration assumes 90% for its metals [5].
- Cu Copper 100% recovered · Recycling Assumed in the 40 MVA declaration [3]; these are scenario assumptions, not measured recovery.
- Al Aluminium 90% recovered · Recycling Metals of the inverter are assumed 90% recycled and 10% landfilled [5].
as of 2026-11-13
End of life in India
Collection and recycling in India, including the informal sector
No source gives end-of-life data for India. The declarations assume that steel and copper are recycled and oil, paper and wood are burnt [3], and that 90% of an inverter's metals are recycled [5]. The US review contacted two transformer recyclers but reports no recovery rates [7]. These are declared scenarios, not measured rates.
as of 2026-11-13
Sources
- Liquid immersed distribution transformers with 400 kVA operating power (EPD-SE_DB-003, EPDITALY0263, issued 31 March 2022, updated 9 October 2025) Siemens Energy Distribution Transformers Kft., registered with EPDItaly, 2025, GWP table, unit 9141275628
- Environmental Product Declaration: TR-400 kVA Transformer, models 110081 and 110169 (EPDITALY1233) Vijai Electricals Ltd (India), registered with EPDItaly, 2026, Tables 4, 7 and 10
- Power Transformer 40 MVA, FPT1847100 (EPDITALY0935) Matelec SAL, registered with EPDItaly, 2025, Tables 3, 4, 5 and 23
- Environmental Product Declaration Power Transformers 40/50 MVA (ONAN/ONAF), registration S-P-00053 ABB T&D S.p.A., 2003
- Environmental Product Declaration: String Power Inverters SG350HX, SG285HX, SG320HX, SG333HX (EPDITALY0458) Sungrow Power Supply Co., Ltd., registered with EPDItaly, 2023, Tables 4-1, 4-2, 5-1 and 7-1
- Electric Grid Supply Chain Review: Large Power Transformers and High Voltage Direct Current Systems US Department of Energy, 2022, Executive summary and sections 2.1.4 and 2.1.6