Wind turbine generating set
A tower, rotor and generator that make electricity from wind.
Energy equipment · No. 22
- Electrical and chemical age
A 15 MW offshore turbine weighs about 1,620 tonnes, yet its wind farm emits only about 7 g of CO2e per kWh.
Chart: Illustration: Wind turbine generating set
Where it comes from
Chart: Map of where it comes from
Between 1920 and 1935 American farmers bought a million small wind chargers. The utility-scale industry grew later: Vestas sold its first 30 kW turbine in 1979, and by 1997 its 1.65 MW V66 was the world's largest commercial turbine.
Three things to know
- Chinese makers took all of the top five places in 2025: Goldwind alone installed 29.7 GW, and the top five installed about 105 GW of the 178 GW.
- Vestas's 4.5 MW onshore turbine uses no rare earth magnets, while a direct-drive design can need 180 kg of neodymium per MW.
- Blades are the weak point of recycling: the Vestas offshore study gives polymers no recycling credit, while its metals are 92% recycled.
The journey
- 1 Steel, composites and copperSteel and iron are 83 to 84% of a turbine's mass; glass and carbon composites make the blades
- 2 Blades, tower and nacelleThe nacelle holds the generator, converter and transformer, and a gearbox in most designs
- 3 Magnets, in some designsAbout 0.9 t of magnets per 15 MW offshore turbine in the Vestas study; none in its 4.5 MW onshore model
- 4 Wind farm20 to 30 years of generation, paying back its making energy in 6 to 13 months
- 5 End of lifeMetals are recycled; blades are modelled as landfilled