| Variant | Material | Amount (kg) | Through | Emission factor (kg CO2e per kg) | Emissions (kg CO2e) |
|---|---|---|---|---|---|
| Onshore | Steel | 413,270 | – | 1.92 | 793,478.4 |
| Onshore | Aluminium | 4590 | – | 14.8 | 67,932 |
| Onshore | Copper | 2455 | – | 3.965 | 9734.1 |
| Offshore | Steel | 1.34 million | – | 1.92 | 2.58 million |
| Offshore | Copper | 16,270 | – | 3.965 | 64,510.5 |
| Offshore | Aluminium | 13,560 | – | 14.8 | 200,688 |
| Offshore | Iron ore | 627.21 | Permanent magnet | – | – |
| Offshore | Rare earths | 272.7 | Permanent magnet | – | – |
| Offshore | Nickel | 9.999 | Permanent magnet | – | – |
| Offshore | Boron | 9.09 | Permanent magnet | – | – |
Worked out from data
The site's estimate
Emissions of one unit worked out by the site from its materials and energy, for the world and India, with the share of mass covered by emission factors
| Variant | Stage | Place | Emissions (kg CO2e) | Mass covered by factors |
|---|---|---|---|---|
| Onshore | Making | World | 871,144 | 100% |
| Onshore | Use | World | – | – |
| Onshore | Making | India | 871,144 | 100% |
| Onshore | Use | India | – | – |
| Offshore | Making | World | 2.85 million | 100% |
| Offshore | Use | World | – | – |
| Offshore | Making | India | 2.85 million | 100% |
| Offshore | Use | India | – | – |
Worked out from data
Emissions by stage
Published life-cycle emissions of one unit in four stages (making, logistics, use, end of life), with their split, place and variant
| Stage | Value | Unit | Share | Variant | Place | Year | Source |
|---|---|---|---|---|---|---|---|
| Making | 2.27 million | kg CO2e per turbine | 135 | Onshore (V163-4.5 MW, turbine only) | World | 2025 | Calculated from [1]: manufacture 505 t CO2e per MW x 4.5 MW; share of the net total of 374 t per MW (calculated) |
| Logistics | 18,000 | kg CO2e per turbine | 1.1 | Onshore (V163-4.5 MW, turbine only) | World | 2025 | Calculated from [1]: plant setup 4 t CO2e per MW x 4.5 MW. Transport inside all stages is 4% of total GWP |
| Use | 58,500 | kg CO2e per turbine | 3.5 | Onshore (V163-4.5 MW, turbine only) | World | 2025 | Calculated from [1]: operation 13 t CO2e per MW x 4.5 MW |
| End of life | -661,500 | kg CO2e per turbine | -39.3 | Onshore (V163-4.5 MW, turbine only) | World | 2025 | Calculated from [1]: end of life (recycling credit) -147 t CO2e per MW x 4.5 MW; negative because recycled metal is credited |
| Making | 6.83 million | kg CO2e per turbine | 86.2 | Offshore (V236-15 MW, turbine only) | World | 2024 | Calculated from [2]: manufacture 455 t CO2e per MW x 15 MW; share of the net total of 528 t per MW (calculated) |
| Logistics | 285,000 | kg CO2e per turbine | 3.6 | Offshore (V236-15 MW, turbine only) | World | 2024 | Calculated from [2]: plant setup 19 t CO2e per MW x 15 MW. Transport inside all stages is about 3% of total GWP |
| Use | 2.87 million | kg CO2e per turbine | 36.2 | Offshore (V236-15 MW, turbine only) | World | 2024 | Calculated from [2]: operation and maintenance 191 t CO2e per MW x 15 MW |
| End of life | -2.06 million | kg CO2e per turbine | -25.9 | Offshore (V236-15 MW, turbine only) | World | 2024 | Calculated from [2]: end of life (recycling credit) -137 t CO2e per MW x 15 MW |
as of 2026-11-13. Vestas Table 10 gives tonnes CO2e per MW over the whole life for the turbine alone: V163-4.5 MW 505, 4, 13, -147 (total 374); V236-15 MW 455, 19, 191, -137 (total 528). Each is multiplied by the rated power (calculated) and shares are of the net total, so making exceeds 100% onshore because of the recycling credit. Plant totals including foundations, cables and substations are 448 and 887 t per MW, and 5.09 and 7.0 g CO2e per kWh [1][2]. A Siemens Gamesa 14 MW offshore EPD reports 14,312 t CO2e per turbine including foundation and offshore substation [15].
End of life
What happens to a unit when it is thrown away: collection, reuse, recycling and disposal shares, by place
| Route | Share | Place | Year | Source |
|---|---|---|---|---|
| Steel, aluminium and copper recycled (modelling assumption) | 92 | World (V236-15 MW study) | 2024 | [2] |
| Metals landfilled (modelling assumption) | 8 | World (V236-15 MW study) | 2024 | [2] |
| Polymers recycled / incinerated / landfilled: 0 / 50 / 50, no credit | – | World (V236-15 MW study) | 2024 | [2] |
| Large mono-material metal parts recycled (towers, nacelle frame) | 98 | World (V163-4.5 MW study) | 2025 | [1] |
| Generator, gearbox, cables and yaw parts recycled | 95 | World (V163-4.5 MW study) | 2025 | [1] |
| Blade materials landfilled, no credit (modelling assumption) | 100 | World (V163-4.5 MW study) | 2025 | [1] |
| Blades landfilled, the rest repaired (EPD assumption) | 95 | Europe (Siemens Gamesa SG 14-222) | 2023 | [15] |
as of 2026-11-13
Recovered as
The commodities and chemicals recovered at end of life, with recovery rates
Recovered as 4- St Steel 92% recovered · Recycling Assumed rate for steel in the V236-15 MW study; 98% for large single-material parts in the V163-4.5 MW study [2][1].
- Al Aluminium 92% recovered · Recycling Assumed rate in the V236-15 MW study [2].
- Cu Copper 92% recovered · Recycling Assumed rate in the V236-15 MW study [2].
- REE Rare earths Recycling Europe is projected to generate half of the world's magnet scrap from wind by 2030 [25]; recycling of rare earth elements is below 1% today [30].
as of 2026-11-13
End of life in India
Collection and recycling in India, including the informal sector
Metals are the main recovered stream: the Vestas studies assume 92 to 98% recycling of steel, aluminium and copper [2][1]. Blades are the problem: the onshore study models blade materials as landfilled with no credit [1], and the Siemens Gamesa EPD assumes 95% of blades are landfilled [15]. WindEurope expected 25,000 t of blades a year by 2025, and four European countries ban landfill [21]. The sources found give no end-of-life data for India.
as of 2026-11-13
Sources
- Life Cycle Assessment of electricity production from an onshore V163-4.5 MW wind plant (version 1.2, 15 January 2025) Vestas Wind Systems A/S, 2025
- Life Cycle Assessment of Electricity Production from an offshore V236-15 MW Wind Plant (April 2024) Vestas Wind Systems A/S, 2024
- Electricity from a European offshore wind farm using SG 14-222 wind turbines (EPD S-P-09791) EPD International AB (declaration by Siemens Gamesa Renewable Energy), 2023
- Wind industry calls for Europe-wide ban on landfilling turbine blades WindEurope, 2021
- Rare Earth Elements: executive summary International Energy Agency, 2026
- Neodymium for the energy transition: Outlook to 2030 and key challenges (Materials Factsheet) Energy Transitions Commission