Material Insights · Understanding the Material World

Wind turbine tower: Evolution

Timeline

The milestones of the product, each with a source

YearEvent
1982Danish turbine maker Windmatic adds tubular shell towers to its line of lattice towers [31].
2003CS Wind sets up its Vietnam plant, which later makes onshore and offshore towers [26].
2011ArcelorMittal says between 150 and 180 tonnes of heavy plate go into a tower, and about 85% of installed turbines have heavy-plate towers [7].
2016Suzlon wins an award for its S97 120 m hybrid tower, which combines lattice and tubular structures [27].
2020The US ITC finds that wind tower imports from Canada, Indonesia, Korea and Vietnam injure US industry, leading to duty orders [14].
2021CS Wind opens its Pueblo, Colorado tower plant (2 August 2021) [26].
2023Siemens Gamesa announces GreenerTower, with at least 63% less CO2 in its tower steel plates [3].
2025India's ALMM Wind rules take effect on 31 July 2025, requiring domestic sourcing of towers and other key parts [21].
2026India adds a record 6.05 GW of wind in 2025-26 and takes its wind total past 56 GW [18].

as of 2026-11-17

Recipe changes

How what it is made of changed over time, and what drove each change

ChangeFromToDriverSource
Tower type of Danish turbinesLattice and tripod steel towersTubular towers rolled from plateNordtank derived the tubular tower from its experience rolling tanker skins, and it soon became more common in Denmark than lattice towers [31][31]
Tower construction at tall hub heightsAll-steel tubular sections, limited to about 4.3 m width by road transportConcrete lower part with steel top (150 to 164 m hubs)Transport bottlenecks of wide steel sections, and lower cost of hybrids as hubs get taller [10][9][4][12][10][9][4][12]
Tower steel plateConventional plate (blast furnace steel averages 2.34 t CO2 per tonne)Plate from arc furnaces on scrap and green electricity (at least 63% less CO2)Cutting the CO2 of tower plate; the first order is for 36 towers of the Thor offshore project [3][16][3][16]
Tower design in IndiaTubular steelHybrid lattice and tubular at 120 m (Suzlon S97)Lower steel need and cost at the same stability, as Suzlon states [27][27]

as of 2026-11-17

What could improve it next

Directions for improvement, today's value and the limit

DirectionMetricTodayLimitUnitSource
Lower-carbon tower plateCO2 per tonne of crude steel, global average against scrap-based arc furnace route1.920.69 (scrap-EAF today)t CO2 per t crude steel[16]
Larger forged flanges for tall towers in IndiaFlange forging diameter34.5 neededm[23]
Taller hybrid towersHub height with a hybrid tower164 (Nordex N149)Not foundm[12]
Lighter towers at great heightsOptimised mass of a 180 m soft-soft transportable steel tower1200Not foundtons[8]

as of 2026-11-17

Sources

  1. Siemens Gamesa introduces GreenerTower (15 June 2023) Wind Systems magazine, 2023
  2. Technical Documentation, Wind Turbine Generator Systems, GE 158 - 50/60 Hz: Weights and Dimensions (Rev. 03, 2019-05-02) General Electric (copy in Dutch EIA project documents), 2019
  3. Steel and wind energy (Update client magazine, May 2011) ArcelorMittal, 2011
  4. Increasing Wind Turbine Tower Heights: Opportunities and Challenges (NREL/TP-5000-73629, May 2019) National Renewable Energy Laboratory (Lantz, Roberts, Nunemaker, DeMeo, Dykes, Scott), 2019
  5. Geometric optimisation analysis of Steel-Concrete hybrid wind turbine towers, Structures 35, 1125-1137 Huang X, Li B, Zhou X, Wang Y, Zhu R (Elsevier; copy on a University of Rochester course page), 2022
  6. Research on dynamic characteristics of wind turbine hybrid towers under environmental influences based on operational modal identification and refined finite element simulation, Frontiers in Built Environment 11, 1728006 Xing K, Zhang Z, Tang S, Jiang W, Lacidogna G, Xu J (Frontiers), 2026
  7. Technische Beschreibung: Anlagenklasse Nordex Delta4000 N149/4.0-4.5 (E0004051131, Revision 07, 15 April 2019) Nordex Energy (permit documents, UVP-Verbund), 2019
  8. Utility Scale Wind Towers from Canada, Indonesia, Korea, and Vietnam Injure U.S. Industry, Says USITC (news release, 30 July 2020) US International Trade Commission, 2020
  9. Sustainability Indicators Report 2025 (table of CO2 emissions and energy intensity 2022-2024, added February 2026) worldsteel, 2026
  10. India Ranks third globally in Renewable Energy Installed Capacity: Shri Pralhad Joshi (press release, 8 April 2026) Ministry of New and Renewable Energy, Press Information Bureau, 2026
  11. Domestic push: India mandates local supply chains and data centres for wind turbines Down To Earth, 2025
  12. Bharat Cleantech Manufacturing Platform: Wind Indigenisation Pathways (no date shown; latest data 31 March 2025) Dalberg Development Advisors (named in the disclaimer), with data from MEC+
  13. Global network (factories) CS Wind Corporation
  14. Suzlon bags the Golden Peacock Eco-Innovation Award for its S97 120 meter hybrid tower wind turbine (11 July 2016) EPC World, 2016
  15. Winds of Change: Stories of a dawning Wind Power Industry (Danish turbine makers) windsofchange.dk