Material Insights · Understanding the Material World

Wind turbine tower: Bill of materials

About these figures

Which unit, study and year the composition figures describe, and how they vary

Composition follows the section weights of the GE 158 tubular tower at 120.9 m hub height (2019), probably for a 5.3 MW turbine [4]; 4.2 MW towers from Vestas (112 m) and Enercon (130 m) give the low and high values [28][6][29]. Concrete hybrid and lattice variants have no published mass in the sources opened. Forged flanges, heavy steel plate and the foundation are not yet nodes: flanges and plate are listed as new products, and the foundation belongs to the wind farm.

as of 2026-11-17

Direct materials

The commodities and chemicals in one unit as bought, with amount, mass share, cost share and recycled content

Variant 1 Tubular steel
MaterialRoleAmount in one unitShare of the unit's mass
St SteelStructural351,000 kgrange 339,000 to 386,000 kg –
Calculated: the six section weights of the GE 158 tower at 120.9 m hub height add up to about 351 tonnes, plus a base ring of about 15 tonnes [4]. Towers for 4.2 MW turbines bracket it: about 339 t at 112 m for the Vestas V136-4.2 (544 t turbine mass minus 205 t tower-top mass, calculated) [28][6] and 386 t of steel sections at 130 m for the Enercon E-138 EP3 [29][30]. Plate is S355 grade steel [5].
Pnt Paints and coatingsFunctionalNot given –
A coating system protects the shell from rust. No opened source gives its mass.
Variant 2 Concrete hybrid
MaterialRoleAmount in one unitShare of the unit's mass
St SteelStructuralNot given –
Steel is used in the top sections only. A hybrid tower at Nordex has two steel sections over a concrete part [12]. No source gives its steel mass.
Cem CementStructuralNot given –
The lower part of a hybrid tower is concrete [12]. No opened source gives its volume or mass.
Variant 3 Lattice steel
MaterialRoleAmount in one unitShare of the unit's mass
St SteelStructuralNot given –
Suzlon says its hybrid lattice and tubular design reduces the steel requirement but gives no figure [27].

Indicative · as of 2026-11-17. Amounts are for one tubular steel tower of about 120 m, from makers' weight tables. Concrete hybrid and lattice masses were not found.

How it is put together

The main steps from parts and materials to the finished unit

StepWhat happensTechnologySource
Buy heavy steel platePlates, mainly S355 grade, in thicknesses from 12 mm up to 63 mm, are bought from steel mills [15]Basic oxygen steelmaking[15]
Cut and rollPlates are cut and rolled into cylindrical or conical shells [13]– [13]
Weld sectionsRolled shells are welded together into tower sections, up to 28 m long in the GE 158 tower [13][4]– [13][4]
Attach flanges and internalsForged flanges are fitted at each end of a section, with door frames, ladders and cable supports inside– –
Blast and coatThe steel is cleaned and coated against corrosion before it leaves the plant– –
Transport and erectSections up to 4.3 m wide go by road and are bolted together on the foundation [4][9]– [4][9]

as of 2026-11-17

Technologies used to make it

The technologies used to make it, at which step

Made with
  • BOS Basic oxygen steelmaking Making steel plate from iron ore (blast furnace and oxygen converter route) The global average for steel is 1.92 t CO2 per tonne; the blast furnace route emits 2.34 and scrap-based arc furnaces 0.69 [16]. Which route supplies plate for towers is not stated in the sources opened.
  • EAF Electric arc furnace Making steel plate from scrap (electric arc furnace route) Siemens Gamesa's GreenerTower plate comes from an electric arc furnace fed with green electricity [3]; scrap-based arc furnace steel averaged 0.69 t CO2 per tonne in 2024 [16].

as of 2026-11-17

Sources

  1. Siemens Gamesa introduces GreenerTower (15 June 2023) Wind Systems magazine, 2023
  2. Technical Documentation, Wind Turbine Generator Systems, GE 158 - 50/60 Hz: Weights and Dimensions (Rev. 03, 2019-05-02) General Electric (copy in Dutch EIA project documents), 2019
  3. Prüfbericht für eine Typenprüfung 2839951-13-d: Prüfung der Standsicherheit, Stahlrohrturm, Vestas V150-4.0/4.2MW MK3E, 123 m Nabenhöhe (6 March 2019) TÜV SÜD Industrie Service GmbH, 2019
  4. Prüfbericht für eine Typenprüfung 2839951-17-d: Prüfung der Standsicherheit, Stahlrohrturm, Vestas V136-4.0/4.2MW-Mk3E, 112 m Nabenhöhe (18 December 2018) TÜV SÜD Industrie Service GmbH, 2018
  5. Geometric optimisation analysis of Steel-Concrete hybrid wind turbine towers, Structures 35, 1125-1137 Huang X, Li B, Zhou X, Wang Y, Zhu R (Elsevier; copy on a University of Rochester course page), 2022
  6. Technische Beschreibung: Anlagenklasse Nordex Delta4000 N149/4.0-4.5 (E0004051131, Revision 07, 15 April 2019) Nordex Energy (permit documents, UVP-Verbund), 2019
  7. Utility Scale Wind Towers from China and Vietnam, Publication 4888 (April 2019) US International Trade Commission, 2019
  8. Re-Imagineering the Wind Energy Sector under the aegis of AM/NS India NBM&CW (NBM Media), 2023
  9. Sustainability Indicators Report 2025 (table of CO2 emissions and energy intensity 2022-2024, added February 2026) worldsteel, 2026
  10. Suzlon bags the Golden Peacock Eco-Innovation Award for its S97 120 meter hybrid tower wind turbine (11 July 2016) EPC World, 2016
  11. Material use in Vestas turbines (brochure 04/2024-EN) Vestas Wind Systems, 2024
  12. Technisches Datenblatt / Technical data sheet: Turm / Tower E-138 EP3, Hybrid-Stahlturm, hub height 130.07 m (D0905997-2) Enercon (permit documents, UVP-Verbund)
  13. ENERCON E-138 EP3 product brochure (last updated 02/2020) Enercon (copy on the WindEurope Electric City 2021 site), 2020