Wind turbine tower
The steel or concrete column that holds a wind turbine's rotor high in the wind.
Energy equipment · No. 31
Energy equipment · ProductIn Vestas's 2025 study of a 4.5 MW wind plant, the tower causes 31% of the plant's climate impact, more than any other part.
Chart: Illustration: Wind turbine tower
Where it comes from
Chart: Map of where it comes from
Early Danish turbines stood on lattice towers; Nordtank derived a tubular tower from rolled tanker skins, and Windmatic added tubular towers in 1982. By 2011 ArcelorMittal put the share of installed turbines with heavy-plate towers at about 85%, and GE and Nordex now offer concrete hybrids at 150 to 164 m.
Three things to know
- A 120.9 m tubular tower for the GE 158 turbine has six sections up to 4.3 m wide, weighing about 46 to 68 tonnes each, so about 351 tonnes of steel together (calculated).
- A Siemens Gamesa study of 165 m towers found hybrid concrete and steel towers have about 40% lower life-cycle emissions than conventional steel towers.
- Since 31 July 2025 India's ALMM Wind rules require turbine makers to source key parts, including towers, from approved domestic suppliers.
The journey
- 1 Steel plateHeavy plate, mostly S355 grade, from blast furnace or scrap-based arc furnace steel
- 2 Rolling and weldingPlates are rolled into rings and welded into sections up to about 28 m long
- 3 Flanges and coatingForged flanges are welded on, then the shell is coated and fitted with internals
- 4 Road transportSections up to 4.3 m wide travel to the site by truck
- 5 ErectionSections are bolted flange to flange, with the nacelle and rotor on top
- 6 End of lifeSteel goes back to scrap; Vestas models 93.2% recycled