Material Insights · Understanding the Material World

Wind turbine tower: Interventions

Try this in What if Switch on levers and see what changes in India by 2036.

Interventions

Changes that would cut emissions or material use, by lever and life stage, with effect per unit, readiness, adoption, evidence and who acts

LeverLife stageChangeEffect per unitReadinessAdoptionWho actsSource
Change routeSupply chainBuy plate made in arc furnaces from scrap with renewable electricitySiemens Gamesa claims at least 63% less CO2 in tower steel plates; the 2024 worldsteel averages are 0.69 against 2.34 t CO2 per tonne for scrap-EAF and blast furnace steel, about 71% less (calculated)Deployed: first order closed (36 towers for the Thor offshore project)One announced order of 36 towers (Thor project, Denmark)Turbine makers, tower makers, steel mills[3][16]
DesignComponents designUse concrete and steel hybrid towers at tall hub heights instead of all-steel towersAbout 40% lower life-cycle emissions than conventional steel towers at a 165 m hub height; with low-carbon materials in both designs, the two have a similar reduction potentialDeployed (Nordex N149 at 164 m; GE 158 at 150 and 161 m)Offered by several turbine makers; no share foundTurbine makers, developers[11][12][4]
DesignComponents designUse hybrid lattice and tubular towersSuzlon says the design needs less steel and costs less; no figure givenDeployed in India since at least 2016 (120 m, S97 turbine)Hybrid lattice towers are named on India's approved listTurbine makers[27][22]
CircularityEnd of lifeRecycle tower steel as scrapVestas credits 93.2% of turbine steel as recycled; turbine end-of-life credit is -147 t CO2e per MW of 505 at manufacture (turbine-wide, not tower alone)DeployedModelled in life-cycle studies; no measured rate foundWind farm owners, scrap dealers[1][17]
Change routeSupply chainBuild large-diameter flange forging in IndiaNo emissions figure; the study names the gap as a limit on local contentGap named in a study with data to March 2025; capacity not yet builtIndia forges flanges only up to 3 mIndian forging firms, turbine makers[23]
DesignMakingSpiral-welded and 3-D printed tall towersNo figure; named as an R&D focusResearchNone foundTower makers, research bodies[23]

as of 2026-11-17

Sources

  1. Life Cycle Assessment of electricity production from an onshore V163-4.5 MW wind plant (version 1.2, 15 January 2025) Vestas Wind Systems A/S, 2025
  2. Siemens Gamesa introduces GreenerTower (15 June 2023) Wind Systems magazine, 2023
  3. Technical Documentation, Wind Turbine Generator Systems, GE 158 - 50/60 Hz: Weights and Dimensions (Rev. 03, 2019-05-02) General Electric (copy in Dutch EIA project documents), 2019
  4. Comparative Life Cycle Assessment of steel vs. hybrid concrete-steel towers for onshore wind turbines: a case study of 165-meter towers (conference abstract) Sofiia Miliutenko Martin (Siemens Energy / Gamesa), WindEurope Annual Event 2026, 2026
  5. Technische Beschreibung: Anlagenklasse Nordex Delta4000 N149/4.0-4.5 (E0004051131, Revision 07, 15 April 2019) Nordex Energy (permit documents, UVP-Verbund), 2019
  6. Sustainability Indicators Report 2025 (table of CO2 emissions and energy intensity 2022-2024, added February 2026) worldsteel, 2026
  7. DOE says 90% of US wind turbines are recyclable (7 January 2025) Utility Dive, 2025
  8. Navigating the Headwinds: OEMs turn to export markets amid low domestic orders (25 April 2025) Renewable Watch, 2025
  9. Bharat Cleantech Manufacturing Platform: Wind Indigenisation Pathways (no date shown; latest data 31 March 2025) Dalberg Development Advisors (named in the disclaimer), with data from MEC+
  10. Suzlon bags the Golden Peacock Eco-Innovation Award for its S97 120 meter hybrid tower wind turbine (11 July 2016) EPC World, 2016