The furnace works and a typical one uses about 1.4 times the thermodynamic minimum energy (calculated) [12], but it runs on coal, and India imported 57.07 MMT of coking coal in 2024-25, being largely dependent on imports [19]. The average Indian steel plant emits about 2.54 tCO2 per tonne of crude steel [17], so access to coal and carbon rules will shape how far new blast furnaces are built.

The six layers

Mathematics, science, engineering, production, economics, and resources and rules: what each gives, the idea in plain words, the limit (hard or soft) and how close today is, what could unlock it, and the maths behind it

Six layers make a technology possible, from the mathematics underneath to the resources and rules it needs at world scale. A hard limit comes from mathematics or nature and can only be sidestepped; a soft limit moves with effort, scale, money or policy.

  1. 1 Mathematics Hard limit

    Mathematics came later

    What it gives. Free-energy mathematics tells a furnace designer at what temperature a reaction runs forward and at what temperature it runs back [14].

    The idea. Smelters in China ran blast furnaces long before any such mathematics existed, so the role is later: it was found by trial and craft and explained by theory afterwards (judgement). The sign of the free energy change, ΔG, says which way a reaction goes at a given temperature [14].

    The limit. Information and proof limits barely touch a furnace; what the mathematics sets is the direction of each reaction, which is a limit of science rather than of calculation [14].

    Show the maths ΔG = ΔH - T × ΔS
    ΔG
    the free energy change of the reaction, in kilojoules per mole; negative means it runs forward
    ΔH
    the heat the reaction takes in (positive) or gives out (negative), in kilojoules per mole
    T
    the temperature, in kelvin
    ΔS
    the change in disorder, in kilojoules per mole per kelvin

    In plain words. A reaction runs by itself only when this number is below zero. Heat can push it one way and disorder the other. Raising the temperature gives disorder more say. That is why a reaction that fails in a cold shaft can work in a hot furnace.

    Worked example. A real example from the same textbook page: boiling water takes in 44.01 kJ (ΔH) and gains 118.8 J/K of disorder (ΔS) [14]. It breaks even at T = 44.01 ÷ 0.1188 = 370.5 K, about 97 °C (calculated) [14]; above that ΔG is negative and the change runs forward. A furnace reaction that takes in heat and makes gas follows the same rule at a higher temperature.

  2. 2 Science Hard limit

    What it gives. Carbon monoxide takes oxygen from iron oxide, leaving iron: carbon and carbon monoxide both contribute in the reduction of the iron (III) oxide [13].

    The idea. The reaction is Fe2O3 + 3CO gives 2Fe + 3CO2 [13]. A US Department of Energy study puts the thermodynamic minimum for blast furnace ironmaking at 9.81 GJ per tonne of hot metal, against 13.63 GJ for the typical US furnace in 2010 [12], about 1.4 times the minimum (calculated).

    The limit. The least energy to turn ore into hot metal under ideal conditions with no gangue or ash is 9.81 GJ per tonne of hot metal [12].

    Energy to make a tonne of hot metal in a blast furnace

    Today (2010): 13.6 GJ/t · Floor: 9.81 GJ/t · today is 1.4 times the floor

    Both values are US figures for 2010 from one DOE study, listed side by side in its Table A1 for the same blast furnace step, in onsite energy per tonne of hot metal [12]. Today is the typical US furnace (built from AISI and some European IPPC data); the state of the art is 12.94 GJ/t [12]. The limit is the study's thermodynamic minimum for an ideal charge with no gangue or ash, with full credit for the energy in the top gas, as the typical value nets off a credit for top gas [12].

    What could unlock it. Only a different reductant sidesteps it: with coke gone, the limit changes to that of the other route, as in an arc furnace fed with 70% direct reduced iron, where natural gas supplies 40 to 60% of the energy and coal only 5 to 15% [15].

    DRI Direct reduction of ironH2D Hydrogen direct reduction (green steel)

    Show the maths Fe2O3 + 3CO → 2Fe + 3CO2
    Fe2O3
    iron oxide, the main compound in iron ore
    CO
    carbon monoxide gas made by burning coke with a limited supply of air
    Fe
    iron metal
    CO2
    carbon dioxide gas, the waste

    In plain words. Iron ore is iron stuck to oxygen. Carbon monoxide is hungry for oxygen, so it pulls it away and leaves iron behind. The gas that results is carbon dioxide. Every furnace making iron this way must make carbon dioxide, because the oxygen has to go somewhere.

    Worked example. 13.63 - 9.81 = 3.82 GJ a tonne above the minimum, which is 3.82 ÷ 3.6 = about 1,060 kWh (calculated) [12]. For a furnace making an assumed 3 million tonnes of hot metal a year, that gap is about 11.5 PJ a year (calculated).

  3. 3 Engineering Soft limit

    What it gives. A tall shaft furnace where solid ore falls and hot gas rises, with coal as both fuel and reducing agent [13][15].

    The idea. Up to 75% of the energy content of the metallurgical coal at an integrated facility is consumed in the blast furnace [15]. On average the iron and steel route uses 1,400 kg of iron ore, 800 kg of coal, 300 kg of limestone and 120 kg of recycled steel for each tonne of crude steel [16].

    The limit. The furnace needs coal for both heat and gas: coal supplies 70 to 80% of the energy in the blast furnace route, against 5 to 15% in an arc furnace on scrap [15].

    What could unlock it. Gas recovered from the furnace and coke ovens is reused: co-product gases typically supply more than 60% of a steel plant's energy requirements [15].

    CDQ Steel plant energy recovery

  4. 4 Production Soft limit

    What it gives. Blast furnace plants are very large and expensive, built as part of an integrated works with a converter and rolling mills [17].

    The idea. TERI estimates total capital costs at around USD 1.6 billion for a 2 million tonne capacity greenfield plant, about USD 800 per tonne of yearly capacity (calculated) [17]. India's crude steel capacity was 220.4 mt in 2025-26 [21].

    The limit. Scale and lead time: a greenfield works is a multi-billion dollar project with many pieces of equipment, and its cost is set before a single tonne is sold [17].

    What could unlock it. India's capacity rose from 143.914 MTPA in 2020-21 to 218.445 MTPA in 2025-26 (till December), so the route can be scaled where coal and ore can be had [19].

  5. 5 Economics Soft limit

    What it gives. Greenfield blast furnace and converter works in India make steel roughly 20% cheaper than a greenfield hydrogen direct reduction and arc furnace plant [17].

    The idea. Larger Indian steel companies borrow at around 8%, take 16% on equity, and have a debt-to-equity ratio of 2.3, or 70% debt and 30% equity [17]. That blends to about 10.4% (calculated: 0.7 × 8% + 0.3 × 16%), and capital is a large share of cost because the plant costs about USD 800 per tonne of capacity [17].

    The limit. Cheaper rivals: in 2024-25 the oxygen converter made 41.1% of India's crude steel, down from 43.5% in 2020-21, while induction furnaces rose from 28.1% to 38.2% [19].

    What could unlock it. Cheaper money lowers the charge: moving from 10.4% to 8% (assumed) cuts the yearly capital charge on USD 800 from about USD 91 to USD 75 a tonne (calculated) [17][18].

    Show the maths CRF = i × (1 + i)n ÷ ((1 + i)n - 1), annual capital charge = capex × CRF
    CRF
    the capital recovery factor: the share of the up-front cost paid back each year
    i
    the yearly cost of capital, as a fraction
    n
    the number of years of payments
    capex
    the up-front cost per tonne of yearly capacity, in US dollars

    In plain words. You pay for the works up front and repay it over its life with interest. Multiply the cost by this factor to find the yearly bill. A dearer loan or a shorter life makes the bill higher. A plant that costs hundreds of dollars for each tonne it makes a year feels the interest rate far more than a cheap furnace does.

    Worked example. Capex USD 800 per tonne of yearly capacity (calculated from USD 1.6 billion for 2 Mt) [17]; i = 10.4% (calculated: 0.7 × 8% + 0.3 × 16%) [17]; n = 25 years (assumed). CRF = 0.1136, so USD 91 a tonne a year (calculated) [18].

  6. 6 Resources and rules Soft limit Binds most today

    What it gives. The route needs coking coal and iron ore in bulk, and rules on carbon will decide how long new furnaces can be built.

    The idea. The Indian steel industry has been largely dependent on imported coking coal, with imports of 51.20 MMT in 2020-21 and 57.07 MMT in 2024-25 [19]. The TERI model for a blast furnace plant uses 0.7 tonnes of coking coal per tonne of crude steel [17].

    The limit. Coal supply and carbon: the average emissions intensity of steel production in India is approximately 2.54 tCO2/tcs [17], and the Ministry of Steel released a Taxonomy of Green Steel on December 12, 2024 [19].

    What could unlock it. Arc furnaces on scrap or direct reduced iron avoid the blast furnace: in 2024-25 arc and induction furnaces together made 59.0% of India's crude steel (calculated) [19].

    EAF Electric arc furnaceDRI Direct reduction of iron

    Show the maths coal needed = steel made × coal per tonne of steel
    coal needed
    the coking coal the furnaces need each year, in million tonnes
    steel made
    the crude steel made by the blast furnace and converter route, in million tonnes
    coal per tonne of steel
    the coking coal used for each tonne of crude steel: 0.7 tonnes in the TERI model

    In plain words. The more steel this route makes, the more coal it burns, in a straight line. India has little good coking coal, so growth in blast furnace steel means more imports. This is simple multiplication, not a law of nature.

    Worked example. Crude steel in 2024-25 was 152.18 million tonnes [20], and the converter made 41.1% of it [19], which is 62.5 million tonnes (calculated). At 0.7 tonnes of coking coal each [17] that is about 43.8 million tonnes of coal (calculated), against 57.07 million tonnes imported [19]; the imports also serve other uses and grades, so the figures are not meant to match.

as of 2026-11-24

Sources

  1. Bandwidth Study on Energy Use and Potential Energy Savings Opportunities in U.S. Iron and Steel Manufacturing (report undated; posted by DOE in August 2015, data for 2010) US Department of Energy, Advanced Manufacturing Office (prepared by Energetics), 2015
  2. Iron Production (undated page; year of access) LibreTexts Chemistry, Westminster College course CHE 180, 2026
  3. Free Energy (Chemistry 2e, section 16.4, undated) OpenStax, 2026
  4. Energy use in the steel industry (fact sheet) World Steel Association, 2025
  5. Fact sheet: Steel and raw materials World Steel Association (copy hosted by Australian Steel Institute), 2018
  6. Green Steel by 2030: Building the business case for the first green steel plant in India TERI, 2026
  7. Simple levelized cost of energy (LCOE) calculator documentation National Laboratory of the Rockies (formerly NREL), US Department of Energy, 2026
  8. Annual Report 2025-26 Ministry of Steel, Government of India, 2026
  9. An Overview of Steel Sector, August 2025 (undated; data to August 2025) Ministry of Steel, Government of India, 2026