HVDC links: Technology advances
Ultra-high voltages, smarter converters and record subsea links
The frontier is higher voltages and powers (UHVDC), voltage-source converters for offshore wind and weak grids, longer subsea links, and bulk procurement to secure factory slots.
Latest advances
±1,100 kV UHVDC in service · 2019LCC link of 12 GW over 3,293 km from Xinjiang to eastern China12
Improves: Up to 40% lower losses than conventional systems, according to the converter supplier
Voltage-source converters (VSC) in service · 2023IGBT-based modular multilevel converters that control active and reactive power independently6
Improves: Black-start capability and weak-grid support; 53 VSC projects existed in May 2023 and 102 more were planned to 2032
Very long subsea interconnectors in service · 2023Viking Link, 765 km of land and subsea cable between the UK and Denmark8
Improves: Joins two markets across the North Sea; expected to save about 600,000 tonnes of CO2 in its first year
400 kV subsea link, Bay of Biscay being deployed · 2028Two 1,000 MW HVDC links of about 400 km between Spain and France with four converter stations1617
Improves: Raises Spain to France exchange capacity from 2,800 to 5,000 MW
Framework procurement being deployed · 2025National Grid reserved converter and cable factory capacity through multi-year frameworks9
Improves: About GBP 24.6 billion of converter and GBP 21.3 billion of cable work
Comparing the options
| Option | Efficiency | Cost | Capacity or distance | Maturity |
|---|---|---|---|---|
| LCC HVDC overhead (±800 to ±1,100 kV)13 | About 3.5% per 1,000 km including converters (Xiangjiaba, calculated) | Cheaper converters than VSC | 6,400 to 12,000 MW per link | mature |
| VSC HVDC (overhead or cable)4816 | About 0.8 to 1% per converter station plus line or cable losses | Higher converter cost than LCC | 1,000 to 1,400 MW per link in recent subsea projects | mature |
| HVAC overhead (765 kV)18 | Higher losses on long routes | Cheaper below about 250 to 400 miles | About 2,400 MW natural loading per circuit | mature |
| HVAC cable4 | Charging current uses up capacity on long cables | No converters; HVDC cheaper beyond about 30 miles | Limited to short routes | mature |
HVDC is the only practical choice for long subsea links and the cheapest for very long overhead routes. Brattle puts the break-even with AC at about 700 km for new build; converting an existing AC corridor to DC can pay beyond about 200 km, or wherever capacity must rise by more than 60%. MISO's range is 250 to 400 miles.
Sources
- The world's most powerful transmission system facilitated by Hitachi ABB Power Grids Hitachi Energy, 2020
- China's SGCC commissions world's first ±1,100 kV UHVDC project Power Line Magazine, 2019
- Xiangjiaba - Shanghai (case study) Hitachi Energy, 2024
- Overview of HVDC Technologies and EPRI's HVDC Research (R. Adapa, presentation to ERCOT) EPRI / ERCOT, 2023
- HVDC Transmission: Multi-Value Planning Considerations and Experience The Brattle Group (for MISO), 2023
- National Grid announces commercial operations of Viking Link, the world's longest land and subsea interconnector National Grid, 2023
- National Grid awards HVDC supply chain framework contracts National Grid, 2025
- Hitachi Energy wins order for first subsea electricity interconnection between France and Spain Renewable Energy Magazine, 2023
- EIB supports with EUR 1.6 bn the strategic Bay of Biscay electricity interconnection between Spain and France European Investment Bank, 2025
- Discussion of EHV and HVDC (M. Tackett, MISO, presentation to ERCOT) MISO / ERCOT, 2023