Made by- Electrical equipment Converter stations The Swedish manufacturer ASEA built the Gotland link for the state utility Vattenfall [2].
- Power cable and wire makers Land and subsea DC cables Lead times for direct current cables exceed five years [5].
- Power semiconductor and electronic component suppliers Thyristor valves Power semiconductor thyristor valves have switched HVDC converters since 1970 [2][3].
- Utilities, transmission companies and renewables developers Own and run links Vattenfall, the Swedish state utility, ordered the first commercial link from ASEA in 1950 [2].
as of 2026-11-12
Sources
- Milestones:Gotland High Voltage Direct Current Link, 1954 IEEE, Engineering and Technology History Wiki (ETHW)
- A Short History of The Mercury-Arc Valve T&D World (Gene Wolf), 2017
- Building the Future Transmission Grid: executive summary IEA, 2025