HVDC links: Evolution

Timeline

The milestones from first idea to today

YearMilestone
1882Deprez and von Miller send direct current 57 km from Miesbach to Munich [1]
1902Peter Cooper Hewitt invents the mercury-arc rectifier, around 1902 [3]
1954The Gotland link, 20 MW at 100 kV over a 96 km subsea cable, becomes the first commercial HVDC link [2]
1970Gotland is upgraded with the first thyristor valves, raising its voltage to 150 kV [2][3]
1987Gotland becomes a bipole of 260 MW at plus and minus 150 kV [2]
2019State Grid commissions the Changji to Guquan link in China, the first at 1,100 kV, 3,293 km long with a capacity of 12 GW [4]
2025The IEA reports lead times for direct current cables beyond five years [5]

as of 2026-11-12

Lineage

The technologies it came from and the ones that came from it

Works with Builds on

as of 2026-11-12

Sources

  1. Gedenkstein Miesbach - München VDE (Verband der Elektrotechnik), Geschichte der Elektrotechnik
  2. Milestones:Gotland High Voltage Direct Current Link, 1954 IEEE, Engineering and Technology History Wiki (ETHW)
  3. A Short History of The Mercury-Arc Valve T&D World (Gene Wolf), 2017
  4. State Grid commissions new 1,100 kV power transmission line (China) Enerdata, Daily Energy News, 2019
  5. Building the Future Transmission Grid: executive summary IEA, 2025
  6. The Role of Critical Minerals in Clean Energy Transitions: Mineral requirements for clean energy transitions International Energy Agency