HVDC links: Overview
What it does
The job the technology does for people, in a short paragraph
HVDC links carry electricity as direct current at very high voltage, over long distances on land and under the sea, and between grids that are not in step. Direct current was first sent 57 km in 1882 [1], and the first commercial link, to the island of Gotland, opened in 1954 [2]. In 2019 China commissioned the first 1,100 kV link, which can carry 12 GW over 3,293 km [4].
as of 2026-11-12
How it works
The working principle in plain words, step by step
At the sending end, a converter station turns the grid's alternating current into direct current. Its valves are electronic switches: mercury-arc tubes at first, power semiconductor switches called thyristors since 1970 [2][3][9]. The direct current then flows along an overhead line or an insulated cable, often under the sea. A direct current does not keep reversing, so a cable does not have to keep charging and discharging itself, and long cables become practical. At the far end, a second converter rebuilds alternating current matched to the receiving grid. Because operators set the converters, they can choose how much power flows and in which direction. The price is the converter stations, which are costly, so HVDC pays on long or subsea routes; for the same job it also needs about one third less metal than AC [6].
as of 2026-11-12
Key figures
The handful of numbers that size it up, each with its unit, year and source
| Figure | Value | Unit | Year | Source |
|---|---|---|---|---|
| Voltage of the Changji to Guquan link, China, the first at this voltage | 1100 | kV | 2019 | [4] |
| Length of the Changji to Guquan link | 3293 | km | 2019 | [4] |
| Transmission capacity of the Changji to Guquan link | 12 | GW | 2019 | [4] |
| Rating of the first commercial link, Gotland | 20 | MW | 1954 | [2] |
| Lead time for direct current cables, more than | 5 | years | 2025 | [5] |
as of 2026-11-12. The Changji to Guquan figures are from a news report of 4 January 2019 on the line's commissioning by State Grid; 2019 is that report's publication year [4]. 2025 is the publication year of the IEA report [5], not a data year.
Where it is used
The main places and products the technology is found in
- Very long overhead lines carrying power across China [4]
- Subsea links to islands, first to Gotland in 1954 [2]
- Interconnectors joining the grids of neighbouring countries
- Long-distance lines for which the IEA notes direct current cables are often preferred [5]
as of 2026-11-12
Scale today
How much of it there is now: units in use, made each year and who uses it
- Users
- Grid operators and the regions joined by each link
- Unit
- MW
- Year
- 2025
- Note
- No world total of HVDC capacity was found in the sources opened. The IEA reports that lead times for direct current cables now exceed five years, a sign of strong demand [5].
as of 2026-11-12
Sources
- Gedenkstein Miesbach - München VDE (Verband der Elektrotechnik), Geschichte der Elektrotechnik
- Milestones:Gotland High Voltage Direct Current Link, 1954 IEEE, Engineering and Technology History Wiki (ETHW)
- A Short History of The Mercury-Arc Valve T&D World (Gene Wolf), 2017
- State Grid commissions new 1,100 kV power transmission line (China) Enerdata, Daily Energy News, 2019
- Building the Future Transmission Grid: executive summary IEA, 2025
- The Role of Critical Minerals in Clean Energy Transitions: Mineral requirements for clean energy transitions International Energy Agency
- Thyristors IEEE Technology Navigator