HVDC links: Efficiency and losses

Why DC beats AC on long hauls and under the sea

What this tab covers How much energy is lost while it moves and while it waits in storage or transit, and how much energy the transport itself consumes, in per cent.

A 2,000 km ±800 kV UHVDC link loses about 7% of its power end to end, roughly 3.5% per 1,000 km including converters. Each converter station accounts for about 0.7 to 1%, so on short links the converters dominate.

Chart: Efficiency ranges

Whole chain Lost in transit

Losses by measure

MeasureRangeTypeWhat is measured
Whole-link losses, ±800 kV Xiangjiaba to Shanghai7%3Whole chainTotal losses over about 2,000 km (about 3.5% per 1,000 km, calculated), versus 10% for a conventional ±500 kV DC line
Line losses only, same link2.7%34Lost in transitPer 1,000 km of line, calculated by subtracting about 0.8% per converter station from the 7% total over 1,980 km of line
Converter losses, LCC0.7 to 0.8%45Lost in transitShare of power lost in one converter station at rated power
Converter losses, VSC (modular multilevel)0.8 to 1%45Lost in transitShare of power lost in one converter station; older two-level VSC designs lost about 2 to 3%
±1,100 kV UHVDC versus conventional systems40% lower (up to)1Lost in transitLosses of the Changji to Guquan link compared with a conventional transmission system (manufacturer figure)

Holding periods and inventory

MeasureValue
Time in transitAbout 10 milliseconds over 3,000 km (calculated); no stored inventory in the line
Economic break-even with ACAbout 300 miles (about 480 km) for overhead lines and about 30 miles (about 50 km) for cables (EPRI)4

Converter losses are roughly fixed per station, while line losses grow with distance, so HVDC pays off only once the line-loss saving over distance outweighs the two converter stations. That is why HVDC dominates long overhead routes and subsea links but not short land routes.

No fuel is burned to drive HVDC: the energy cost is the losses, which include cooling of the converter valves. Utilisation can be high on dedicated links: Changji to Guquan was designed to deliver about 66 TWh a year, about 63% of its maximum (calculated).

Sources

  1. The world's most powerful transmission system facilitated by Hitachi ABB Power Grids Hitachi Energy, 2020
  2. Xiangjiaba - Shanghai (case study) Hitachi Energy, 2024
  3. Overview of HVDC Technologies and EPRI's HVDC Research (R. Adapa, presentation to ERCOT) EPRI / ERCOT, 2023
  4. Market Integration of HVDC Lines: Internalizing HVDC Losses in Market Clearing (Tosatto, Weckesser, Chatzivasileiadis) arXiv (Technical University of Denmark), 2018