Heat pump: Footprint
Raw materials in one unit
Every commodity and chemical inside one unit, traced through its components by the site, with its emission factor and emissions
| Variant | Material | Amount (kg) | Emission factor (kg CO2e per kg) | Emissions (kg CO2e) |
|---|---|---|---|---|
| AIR | Steel | 95.68 | 1.92 | 183.7 |
| AIR | Copper | 17.02 | 3.965 | 67.5 |
| AIR | Aluminium | 12.55 | 14.8 | 185.7 |
| AIR | PET resin | 5.58 | – | – |
| AIR | Vermiculite | 5.58 | – | – |
| AIR | ABS | 5.46 | – | – |
| AIR | Polypropylene | 3.64 | 1.548 | 5.6 |
| AIR | PVC | 0.85 | – | – |
| AIR | Polyurethanes (MDI, TDI, polyols) | 0.64 | – | – |
| AIR | Polystyrene and EPS | 0.43 | – | – |
| Ground | Steel | 156.72 | 1.92 | 300.9 |
| Ground | High-density polyethylene | 152 | – | – |
| Ground | Aluminium | 47.16 | 14.8 | 698 |
| Ground | Copper | 39.17 | 3.965 | 155.3 |
| Ground | Cement | 27.86 | – | – |
| Ground | Kaolin & clays | 6.76 | – | – |
Worked out from data
The site's estimate
Emissions of one unit worked out by the site from its materials and energy, for the world and India, with the share of mass covered by emission factors
| Variant | Stage | Place | Emissions (kg CO2e) | Mass covered by factors |
|---|---|---|---|---|
| AIR | Making | World | 443 | 87% |
| AIR | Use | World | 18,287 | 100% |
| AIR | Making | India | 443 | 87% |
| AIR | Use | India | 26,751 | 100% |
| Ground | Making | World | 1154 | 57% |
| Ground | Use | World | – | – |
| Ground | Making | India | 1154 | 57% |
| Ground | Use | India | – | – |
Worked out from data
Energy in use
Energy one unit uses per year of use, by carrier
Energy in use- El Electricity 2661.83 kWh per year · lifetime 15 years Air source (Vaillant 7 kW system with uniTOWER plus) Vaillant aroTHERM plus 7 kW system in the EPD scenario: 2,107.53 kWh for heating (SCOP 4.65, 1,400 hours, 7 kW design load) plus 554.3 kWh for cooling [1]. The undated Mitsubishi EPD declares 97,019 kWh over 17 years for its 8.5 kW unit with a 200 L cylinder, heating and hot water, about 5,707 kWh a year (calculated) [5]; it also prints a COP of 2.6 at A7/W35 for that size, which does not fit its SCOP of 4.84 and is not used. No per-year figure was found for a ground source unit.
as of 2026-11-13
Emissions by stage
Published life-cycle emissions of one unit in four stages (making, logistics, use, end of life), with their split, place and variant
| Stage | Value | Unit | Share | Variant | Place | Year | Source |
|---|---|---|---|---|---|---|---|
| Making | 1260.1 | kg CO2e per system | 6.56 | Air source (Vaillant 7 kW system with uniTOWER plus) | Europe (Ecoinvent 3.6 European electricity mix) | 2024 | Calculated sum of A1 1,090, A2 129, A3 41.1 for the Vaillant 7 kW system with uniTOWER plus [1] |
| Logistics | 148.5 | kg CO2e per system | 0.77 | Air source (Vaillant 7 kW system with uniTOWER plus) | Europe (Ecoinvent 3.6 European electricity mix) | 2024 | Calculated sum of A4 32.5 and A5 116 (transport and installation) [1] |
| Use | 17,701.1 | kg CO2e per system | 92.15 | Air source (Vaillant 7 kW system with uniTOWER plus) | Europe (Ecoinvent 3.6 European electricity mix) | 2024 | B6 17,700 plus refrigerant leakage B1 0.81 and refill B2 0.276, 15 years, heating and cooling [1] |
| End of life | 99.3 | kg CO2e per system | 0.52 | Air source (Vaillant 7 kW system with uniTOWER plus) | Europe (Dutch NMD waste scenarios) | 2024 | Calculated sum of C2 2.36, C3 96.2, C4 0.726; module D of minus 359 is not counted [1] |
| Making | 1400 | kg CO2e per system | 2.34 | Air source (Mitsubishi 8.5 kW system with 200 L cylinder) | United Kingdom (BRE Global EPD; use-phase grid not stated) | – | A1-A3 total 1,400 for the 8.5 kW Mitsubishi unit with 200 L cylinder, 17-year life; undated EPD [5] |
| Logistics | 49.7 | kg CO2e per system | 0.08 | Air source (Mitsubishi 8.5 kW system with 200 L cylinder) | United Kingdom (BRE Global EPD; use-phase grid not stated) | – | Calculated sum of A4 32.1 and A5 17.6 [5] |
| Use | 58,334.4 | kg CO2e per system | 97.56 | Air source (Mitsubishi 8.5 kW system with 200 L cylinder) | United Kingdom (BRE Global EPD; use-phase grid not stated) | – | Calculated sum of B1 34.4 (refrigerant) and B6 58,300 (97,019 kWh over 17 years); undated EPD, manufacturing data 2021 to 2022 [5] |
| End of life | 7.56 | kg CO2e per system | 0.01 | Air source (Mitsubishi 8.5 kW system with 200 L cylinder) | United Kingdom (BRE Global EPD; use-phase grid not stated) | – | C4 7.56 (C3 is 0; C1 and C2 not declared) [5] |
| Making | 688.6 | kg CO2e per system | 5.81 | Air source (Vaillant 5 kW system with hydraulic station) | Europe (Ecoinvent 3.6 European electricity mix) | 2024 | Calculated sum of A1 600, A2 65.5, A3 23.1 for the Vaillant 5 kW system with hydraulic station [2] |
| Logistics | 89.8 | kg CO2e per system | 0.76 | Air source (Vaillant 5 kW system with hydraulic station) | Europe (Ecoinvent 3.6 European electricity mix) | 2024 | Calculated sum of A4 21.0 and A5 68.8 [2] |
| Use | 11,000.7 | kg CO2e per system | 92.82 | Air source (Vaillant 5 kW system with hydraulic station) | Europe (Ecoinvent 3.6 European electricity mix) | 2024 | B6 11,000 plus B1 0.54 and B2 0.188, 24,855 kWh over 15 years [2] |
| End of life | 72.6 | kg CO2e per system | 0.61 | Air source (Vaillant 5 kW system with hydraulic station) | Europe (Dutch NMD waste scenarios) | 2024 | Calculated sum of C2 1.38, C3 70.7, C4 0.533 [2] |
as of 2026-11-13. Three declarations, each labelled by its system: the Vaillant 7 kW and Mitsubishi 8.5 kW rows include a hot water cylinder, which the bill of materials leaves out; the Vaillant 5 kW system (outdoor unit plus hydraulic station) is closest in make-up to the bill of materials [1] [2] [5].
End of life
What happens to a unit when it is thrown away: collection, reuse, recycling and disposal shares, by place
| Route | Share | Place | Year | Source |
|---|---|---|---|---|
| Metals recycled (Mitsubishi EPD scenario, 8.5 kW) | 70 | United Kingdom | – | [5] |
| Plastics recycled (Mitsubishi EPD scenario) | 50 | United Kingdom | – | [5] |
| Refrigerant reused or recovered (Mitsubishi EPD scenario) | 65 | United Kingdom | – | [5] |
| Other components to landfill (Mitsubishi EPD scenario) | 100 | United Kingdom | – | [5] |
| Light steel recycled (Vaillant EPD, Dutch NMD scenario) | 87 | Europe | 2024 | [1] |
| Copper recycled (Vaillant EPD, Dutch NMD scenario) | 95 | Europe | 2024 | [1] |
| Cast aluminium recycled (Vaillant EPD, Dutch NMD scenario) | 94 | Europe | 2024 | [1] |
| Plastics going to incineration (Vaillant EPD, Dutch NMD scenario, plastics via residue) | 80 | Europe | 2024 | [1] |
| All e-waste documented as formally collected and recycled (not heat pump specific) | 22.3 | World | 2022 | [26] |
as of 2026-11-13
Recovered as
The commodities and chemicals recovered at end of life, with recovery rates
Recovered as 4- St Steel 87% recovered · Recycling Dutch NMD scenario in the Vaillant EPD (a further 12% reused); a scenario, not a measured rate [1].
- Cu Copper 95% recovered · Recycling Dutch NMD scenario in the Vaillant EPD [1].
- Al Aluminium 94% recovered · Recycling Cast aluminium, Dutch NMD scenario in the Vaillant EPD [1].
- HFC Fluorochemicals and refrigerants 65% recovered · Reuse The Mitsubishi EPD assumes 65% of the R-32 refrigerant is reused at end of life [5].
as of 2026-11-13
End of life in India
Collection and recycling in India, including the informal sector
No source opened describes heat pump end of life in India. India's E-Waste (Management) Rules 2022, in force since 1 April 2023, set producers a recycling target of 60% of the quantity of equipment they place on the market, rising to 80% by 2027-2028 [29]; the page does not say whether heat pumps are covered. Worldwide only 22.3% of e-waste was documented as formally collected and recycled in 2022 [26]. The IEA warns that F-gas refrigerant leaks can reduce the climate benefit [9].
as of 2026-11-13
Sources
- Environmental Product Declaration as per ISO 14025 and EN 15804: aroTHERM plus 7 kW & uniTOWER plus (EPD-Kiwa-EE-000387, issued 13.03.2024) Vaillant GmbH, Kiwa-Ecobility Experts, 2024, Tables 1, 2, 8, 12, 14
- Environmental Product Declaration: aroTHERM plus 5 kW & Hydraulic Station (EPD-Kiwa-EE-000270, issued 13.03.2024) Vaillant GmbH, Kiwa-Ecobility Experts, 2024, Tables 1, 2, 10, 14
- Environmental Product Declaration to EN 15804 (BRE Global programme): Mitsubishi Electric air source heat pumps of 5, 6, 8.5, 11.2 and 14 kW with EHPT20X-MHEDW 200 L packaged cylinder (undated; manufacturing data 1 April 2021 to 31 March 2022) Mitsubishi Electric, BRE Global, Technical information, Main Product Contents, LCA results for PUZ-WM85VAA, scenarios
- The Future of Heat Pumps: Executive summary IEA, 2022
- The Global E-waste Monitor 2024 (executive summary) UNITAR and ITU, 2024
- E-Waste Management Rules, 2022 International Energy Agency policies database, 2022