Wind turbine blade
The long composite wing that catches the wind and turns a turbine rotor.
Energy equipment · No. 26
- Digital age
A 153 m turbine blade, built for a 26 MW offshore machine, weighs 83.5 tonnes and is hard to recycle.
Chart: Illustration: Wind turbine blade
Where it comes from
Chart: Map of where it comes from
Økær Vind Energi, a small Danish firm, delivered its first set of glass fibre blades in November 1977 and went on to supply Vestas, Nordtank and Bonus. LM Glasfiber, a furniture factory founded in 1940, began making blades in 1978; by April 2019 its LM 107 P was the longest blade in the world.
Three things to know
- Blades are about 20% of a wind turbine's cost, and materials are about 44% of a blade's cost, in a 2014 US study.
- Carbon fibre spar caps made a blade 25 to 27% lighter than a fibreglass design in a US study of two reference turbines.
- Vestas's study of a 4.5 MW onshore plant names blade production as 15% of its global warming potential, among the main parts, and models blade materials as 100% landfilled.
The journey
- 1 Fibre, resin and coresGlass fibre (from sand), sometimes carbon fibre, epoxy resin, and balsa or foam cores
- 2 MouldingDry fibre and cores go into two shell moulds and resin is drawn in under vacuum
- 3 Bonding and finishingShells, spar caps and webs are glued together, then ground and polished
- 4 Transport and erectionLong blades travel by road, rail or ship and are bolted to the hub
- 5 Wind farmBlades work for about 20 years in the Vestas study of a 4.5 MW plant
- 6 End of lifeMostly landfilled so far; cement kilns, grinding and chemical recycling are being scaled up