Per blade. The Glass fibre and Carbon spar cap variants are reference blades of a 2024 Sandia and NREL recycling study (Table 2) [5]; the Offshore variant is the 117 m baseline of an ORE Catapult design study (Table 4.6) [4]. Glass fibre (new product p_glass_fibre) is the largest material: 58.7%, 46.9% and about 43.6% of mass. The Offshore foam core (11.0%) and root connection (6.4%) are not linked. Totals are indicative.

as of 2026-11-15

Components

The products inside one unit, with quantity, mass share and cost share

Variant 1 Carbon spar cap (62.2 m, 13.3 t reference)
MaterialRoleAmount in one unitShare of the unit's mass
Carbon fibre and composite partsComponent1198 kg9%
Carbon fibre in the spar caps of the reference blade, 1,198 kg [5]; fibre only, since the spar cap resin is counted in the epoxy row. Share calculated against 13,273 kg.
Variant 2 Offshore (117 m IEA 15 MW baseline)
MaterialRoleAmount in one unitShare of the unit's mass
Carbon fibre and composite partsComponent7814.3 kg11.2%
Carbon fibre in the unidirectional spar caps of the 117 m baseline, 7,814.3 kg (the fibre column of the Carbon UD row of Table 4.6) [4]; fibre only, as for the Carbon spar cap variant, since the spar cap resin (2,890.2 kg) is counted in the epoxy row. Share calculated against 69,541.8 kg.

as of 2026-11-15

Direct materials

The commodities and chemicals in one unit as bought, with amount, mass share, cost share and recycled content

Variant 1 Glass fibre (48.7 m, 9.0 t reference)
MaterialRoleAmount in one unitShare of the unit's mass
EPX Epoxy resinsStructural2401 kg26.7%
Thermoset epoxy of the glass reference blade [5]; share calculated.
Adh Adhesives and sealantsFunctional450 kg5%
Structural adhesive that bonds the shells [5]; share calculated.
Tm TimberStructural416 kg4.6%
Balsa core [5]; share calculated. Balsa is a wood, entered as timber.
St SteelStructural270 kg3%
Steel in the blade; the study does not say what it is used for (root fittings are the usual use) [5]; share calculated.
Pnt Paints and coatingsFunctional180 kg2%
Gelcoat, the outer surface coat [5]; share calculated.
Variant 2 Carbon spar cap (62.2 m, 13.3 t reference)
MaterialRoleAmount in one unitShare of the unit's mass
EPX Epoxy resinsStructural3685 kg27.8%
Thermoset epoxy of the carbon spar cap reference blade, including the spar cap resin [5]; share calculated.
Tm TimberStructural839 kg6.3%
Balsa core [5]; share calculated.
Adh Adhesives and sealantsFunctional664 kg5%
Structural adhesive [5]; share calculated.
St SteelStructural398 kg3%
Steel; use not stated [5]; share calculated.
Pnt Paints and coatingsFunctional265 kg2%
Gelcoat [5]; share calculated.
Variant 3 Offshore (117 m IEA 15 MW baseline)
MaterialRoleAmount in one unitShare of the unit's mass
EPX Epoxy resinsStructural15,264 kg21.9%
Resin of the 117 m baseline, calculated as the resin column of the five glass rows and the carbon spar cap row of Table 4.6 (12,373.8 kg plus 2,890.2 kg) [4]. The table's resin total of 19,353.4 kg also includes the adhesive and gelcoat, which have their own rows here. The table does not name the resin; epoxy, the resin Vestas uses [1], is assumed.
Adh Adhesives and sealantsFunctional3311.5 kg4.8%
Structural adhesive, Table 4.6 [4]; share calculated.
Pnt Paints and coatingsFunctional777.9 kg1.1%
Gelcoat of the shell, Table 4.6 [4]; share calculated.

Indicative · as of 2026-11-15. Glass fibre, the largest material of every variant, is not yet a node, so it has no row: 5,283 kg or 58.7% (Glass fibre), 6,224 kg or 46.9% (Carbon spar cap) [5] and about 30,295 kg or 43.6% (Offshore, calculated from the fibre column of the five glass rows of Table 4.6) [4]. The Offshore blade also holds 7,646.7 kg (11.0%) of medium density foam core, type not stated, and a 4,432.6 kg (6.4%) root connection whose material is not stated [4]; neither is linked. Shares are calculated.

Cost breakdown

The share of the unit's cost in each component or stage

PartShare of costYearSource
Blades as a share of a wind turbine's cost (range 15 to 26%, a set of three blades)20%2014[19]
Materials as a share of the cost of a US-made blade44%2014[19]
Labour and burden as a share of the cost of a US-made blade27%2014[19]

as of 2026-11-15. IRENA's 2016 brief puts blades and tower together at nearly half of a turbine's cost [37].

How it is put together

The main steps from parts and materials to the finished unit

StepWhat happensTechnologySource
Lay up fibre and coresDry glass (and carbon) fabric and balsa or foam cores are placed in the two shell moulds– [4]
Infuse resinThe mould is sealed and epoxy is drawn in under vacuum (vacuum assisted resin transfer moulding, the most common method)– [4]
CureThe resin is cured with heat in the mould until it hardens; Siemens made its 75 m blade in one piece in a closed mould– [28]
Make spar caps and websUnidirectional strips of glass or carbon carry the bending load; webs join the two shellsCarbon fibre composites[4]
BondAdhesive is applied to the lower shell, the webs are fitted and the upper shell is lowered on; Vestas uses polyurethane glue– [4][1]
FinishThe bonded blade is ground and polished to the right finish– [1]

as of 2026-11-15

Technologies used to make it

The technologies used to make it, at which step

Made with
  • CFR Carbon fibre composites Laying up and curing carbon fibre spar caps Carbon fibre is used in the spar caps of large blades by Vestas and Siemens Gamesa [4]; no share of blades is given.

as of 2026-11-15

Technologies inside it

The technologies inside the product, with how much of each per unit

Embodies
  • CFR Carbon fibre composites 1198 kg Carbon spar cap (62.2 m, 13.3 t reference) Carbon fibre in the spar caps of the reference blade [5].

as of 2026-11-15

Sources

  1. Life Cycle Assessment of electricity production from an onshore V163-4.5 MW wind plant (version 1.2, 15 January 2025) Vestas Wind Systems A/S, 2025
  2. WP4 D1.1 Wind Turbine Blades Design and Manufacturing: Current State-of-the-Art Literature Review (CFAR-OC-020-31032022) Offshore Renewable Energy Catapult (Cornwall Flow Accelerator), 2022
  3. Environmental and Economic Assessment of Wind Turbine Blade Recycling Approaches ACS Sustainable Resource Management (Sandia National Laboratories and NREL authors), via PubMed Central, 2024
  4. U.S. Wind Energy Manufacturing and Supply Chain: A Competitiveness Analysis U.S. Department of Energy, 2014
  5. Feature on the Siemens B75 Quantum 75 m blade, July/August 2012 issue (page shows no title) Reinforced Plastics, 2012