Wind turbine blade: Bill of materials
About these figures
Which unit, study and year the composition figures describe, and how they vary
Per blade. The Glass fibre and Carbon spar cap variants are reference blades of a 2024 Sandia and NREL recycling study (Table 2) [5]; the Offshore variant is the 117 m baseline of an ORE Catapult design study (Table 4.6) [4]. Glass fibre (new product p_glass_fibre) is the largest material: 58.7%, 46.9% and about 43.6% of mass. The Offshore foam core (11.0%) and root connection (6.4%) are not linked. Totals are indicative.
as of 2026-11-15
Components
The products inside one unit, with quantity, mass share and cost share
Variant 1 Carbon spar cap (62.2 m, 13.3 t reference)| Material | Role | Amount in one unit | Share of the unit's mass |
|---|---|---|---|
| Carbon fibre and composite parts | Component | 1198 kg | 9% |
| Carbon fibre in the spar caps of the reference blade, 1,198 kg [5]; fibre only, since the spar cap resin is counted in the epoxy row. Share calculated against 13,273 kg. | |||
| Material | Role | Amount in one unit | Share of the unit's mass |
|---|---|---|---|
| Carbon fibre and composite parts | Component | 7814.3 kg | 11.2% |
| Carbon fibre in the unidirectional spar caps of the 117 m baseline, 7,814.3 kg (the fibre column of the Carbon UD row of Table 4.6) [4]; fibre only, as for the Carbon spar cap variant, since the spar cap resin (2,890.2 kg) is counted in the epoxy row. Share calculated against 69,541.8 kg. | |||
as of 2026-11-15
Direct materials
The commodities and chemicals in one unit as bought, with amount, mass share, cost share and recycled content
Variant 1 Glass fibre (48.7 m, 9.0 t reference)| Material | Role | Amount in one unit | Share of the unit's mass |
|---|---|---|---|
| EPX Epoxy resins | Structural | 2401 kg | 26.7% |
| Thermoset epoxy of the glass reference blade [5]; share calculated. | |||
| Adh Adhesives and sealants | Functional | 450 kg | 5% |
| Structural adhesive that bonds the shells [5]; share calculated. | |||
| Tm Timber | Structural | 416 kg | 4.6% |
| Balsa core [5]; share calculated. Balsa is a wood, entered as timber. | |||
| St Steel | Structural | 270 kg | 3% |
| Steel in the blade; the study does not say what it is used for (root fittings are the usual use) [5]; share calculated. | |||
| Pnt Paints and coatings | Functional | 180 kg | 2% |
| Gelcoat, the outer surface coat [5]; share calculated. | |||
| Material | Role | Amount in one unit | Share of the unit's mass |
|---|---|---|---|
| EPX Epoxy resins | Structural | 3685 kg | 27.8% |
| Thermoset epoxy of the carbon spar cap reference blade, including the spar cap resin [5]; share calculated. | |||
| Tm Timber | Structural | 839 kg | 6.3% |
| Balsa core [5]; share calculated. | |||
| Adh Adhesives and sealants | Functional | 664 kg | 5% |
| Structural adhesive [5]; share calculated. | |||
| St Steel | Structural | 398 kg | 3% |
| Steel; use not stated [5]; share calculated. | |||
| Pnt Paints and coatings | Functional | 265 kg | 2% |
| Gelcoat [5]; share calculated. | |||
| Material | Role | Amount in one unit | Share of the unit's mass |
|---|---|---|---|
| EPX Epoxy resins | Structural | 15,264 kg | 21.9% |
| Resin of the 117 m baseline, calculated as the resin column of the five glass rows and the carbon spar cap row of Table 4.6 (12,373.8 kg plus 2,890.2 kg) [4]. The table's resin total of 19,353.4 kg also includes the adhesive and gelcoat, which have their own rows here. The table does not name the resin; epoxy, the resin Vestas uses [1], is assumed. | |||
| Adh Adhesives and sealants | Functional | 3311.5 kg | 4.8% |
| Structural adhesive, Table 4.6 [4]; share calculated. | |||
| Pnt Paints and coatings | Functional | 777.9 kg | 1.1% |
| Gelcoat of the shell, Table 4.6 [4]; share calculated. | |||
Indicative · as of 2026-11-15. Glass fibre, the largest material of every variant, is not yet a node, so it has no row: 5,283 kg or 58.7% (Glass fibre), 6,224 kg or 46.9% (Carbon spar cap) [5] and about 30,295 kg or 43.6% (Offshore, calculated from the fibre column of the five glass rows of Table 4.6) [4]. The Offshore blade also holds 7,646.7 kg (11.0%) of medium density foam core, type not stated, and a 4,432.6 kg (6.4%) root connection whose material is not stated [4]; neither is linked. Shares are calculated.
Cost breakdown
The share of the unit's cost in each component or stage
| Part | Share of cost | Year | Source |
|---|---|---|---|
| Blades as a share of a wind turbine's cost (range 15 to 26%, a set of three blades) | 20% | 2014 | [19] |
| Materials as a share of the cost of a US-made blade | 44% | 2014 | [19] |
| Labour and burden as a share of the cost of a US-made blade | 27% | 2014 | [19] |
as of 2026-11-15. IRENA's 2016 brief puts blades and tower together at nearly half of a turbine's cost [37].
How it is put together
The main steps from parts and materials to the finished unit
| Step | What happens | Technology | Source |
|---|---|---|---|
| Lay up fibre and cores | Dry glass (and carbon) fabric and balsa or foam cores are placed in the two shell moulds | – | [4] |
| Infuse resin | The mould is sealed and epoxy is drawn in under vacuum (vacuum assisted resin transfer moulding, the most common method) | – | [4] |
| Cure | The resin is cured with heat in the mould until it hardens; Siemens made its 75 m blade in one piece in a closed mould | – | [28] |
| Make spar caps and webs | Unidirectional strips of glass or carbon carry the bending load; webs join the two shells | Carbon fibre composites | [4] |
| Bond | Adhesive is applied to the lower shell, the webs are fitted and the upper shell is lowered on; Vestas uses polyurethane glue | – | [4][1] |
| Finish | The bonded blade is ground and polished to the right finish | – | [1] |
as of 2026-11-15
Technologies used to make it
The technologies used to make it, at which step
Made with- CFR Carbon fibre composites Laying up and curing carbon fibre spar caps Carbon fibre is used in the spar caps of large blades by Vestas and Siemens Gamesa [4]; no share of blades is given.
as of 2026-11-15
Technologies inside it
The technologies inside the product, with how much of each per unit
Embodies- CFR Carbon fibre composites 1198 kg Carbon spar cap (62.2 m, 13.3 t reference) Carbon fibre in the spar caps of the reference blade [5].
as of 2026-11-15
Sources
- Life Cycle Assessment of electricity production from an onshore V163-4.5 MW wind plant (version 1.2, 15 January 2025) Vestas Wind Systems A/S, 2025
- WP4 D1.1 Wind Turbine Blades Design and Manufacturing: Current State-of-the-Art Literature Review (CFAR-OC-020-31032022) Offshore Renewable Energy Catapult (Cornwall Flow Accelerator), 2022
- Environmental and Economic Assessment of Wind Turbine Blade Recycling Approaches ACS Sustainable Resource Management (Sandia National Laboratories and NREL authors), via PubMed Central, 2024
- U.S. Wind Energy Manufacturing and Supply Chain: A Competitiveness Analysis U.S. Department of Energy, 2014
- Feature on the Siemens B75 Quantum 75 m blade, July/August 2012 issue (page shows no title) Reinforced Plastics, 2012