Statistical quality control
Control charts tell normal variation from real problems, so quality is built in.
Making things · Production systems · No. 495
- Electrical and chemical age
- Readiness 9 of 9
- Process
A memo about a page long, written in 1924, taught factories to stop chasing every wobble and act only on real faults.
Chart: Illustration: Statistical quality control
Where it comes from
Chart: Map of where it comes from
Walter Shewhart, a physicist at Western Electric, proposed the control chart in a memo of May 1924 while studying inspection data for the Bell telephone system. His book of 1931 set out the method in full.
Three things to know
- Shewhart's chart sampled parts during production instead of waiting for the end of the run.
- With limits at three standard deviations, a process working normally gives a false alarm only 0.27% of the time.
- During the Second World War the American Standards Association issued war standards for control charts in 1941 and 1942.
The journey
- 1 SampleMeasure a few parts at regular times during production
- 2 PlotMark the sample averages or ranges on a chart
- 3 LimitsDraw lines three standard deviations either side of the centre
- 4 SignalA point outside the lines points to a real cause
- 5 ActFind and remove the cause, then keep watching